Drilling Imminent at the Flint Gold Silver Project
Released
Released
Announcement PDF
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
ASX ANNOUNCEMENT
25 March 2026
Drilling Imminent at the Flint Gold‑Silver Project
HIGHLIGHTS
• Maiden drilling campaign at Flint to test high impact gold-silver targets
• Flint gold‑silver drilling set to commence on March 31, 2026
• SFP Drilling SAC mobilising to site on March 28
• Initial drilling campaign set to begin systematically testing the broader Flint system
• Access construction has exposed broader areas of hydrothermal alteration
Executive Chairman Dean de Largie said:
“The mobilisation of our drilling contractor, SFP Drilling SAC, to the Flint gold‑silver project on
28 March 2026 is an important step forward. Flint lies within a 4 km long hydrothermal system
that we have modelled and potentially hosts two separate high‑sulphidation epithermal
gold‑silver systems, separated by a porphyry‑copper lithocap, providing a compelling
multi‑target exploration opportunity. The upcoming program will represent the first
systematic drill test of this broader system, targeting both interpretedepithermal centres and
associated alteration zones.
Access and drill‑pad construction at the project is now nearing completion, and we expect
full site preparation to be finished ahead of mobilisation, ensuring an efficient and
uninterrupted drilling program.
We look forward to updating the market on commencement of the drilling campaign.”
Australian Critical Minerals Ltd (ASX:ACM,“ACM”or“the Company”) is pleased to advise
that drilling mobilisation is imminent at its Flint gold‑silver project, located within a large
hydrothermal system with a 4 km strike length, believed to comprise two separate
high‑sulphidation epithermal systems separated by a porphyry‑copper lithocap.
Identification of the hydrothermal system is based on extensive historic geochemistry, IP and
NSAMT geophysics and geological mapping.
ACM confirms that its drilling contractor, SFP Drilling SAC, is scheduled to mobilise to the
Flint project site on 28 March 2026, marking the commencement of a targeted exploration
campaign across this prospective corridor. Initial holes will target zones of strong alteration
and geophysical response interpreted to represent key fluid pathways within the system.
The project is within a well-endowed epithermal-porphyry metallogenic belt which hosts
multiple world-class gold, silver and copper mining centres (Figure 1). Flint is considered
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
highly prospective given its position along this trend and its proximity to multiple established
gold producers.
Figure 1. Flint location amongst Tier 1 gold-silver producers.
The San Juan Porphyry project is located less than 1km from the tenure (Figure 2). It provides
an indication of the potential geology in the deeper parts of the Flint system.
Access and drilling platform construction is very nearly complete. Importantly, the process
of access preparation allows new geology to be exposed. Significant clay alteration, of
product of the hydrothermal system can be observed in the access roads and drill pads
(Figures 2 to 4).
The drill pad and access construction has identified broader hydrothermal clay alteration on
freshly broken rock. These observations provide further support to the Company’s geological
model (Figures 2 to 5). The onsite geological team will conduct further surface mapping and
sampling of these areas between drill pads.
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Figure 2. Breaking ground on Flint
Figure 3. Drill pads at Flint
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Figure 4. Advanced argillic alteration clearly visible from the broken ground at Flint drill pads.
Next Steps
• Commence Phase 1 Diamond Drilling (March 31, 2026)
• Ongoing mapping and geochemical sampling in southern sector
The Company will provide further updated as drilling progresses.
This release has been approved by the Board of Australian Critical Minerals Limited.
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
For further information, please contact:
Dean de Largie Paul Berson
Executive Chairman Investor and Media Relations
Australian Critical Minerals Limited Corporate Storytime
E info@auscriticalminerals.com.au E paul@corporatestorytime.com
T +61 (8) 6165 8858 T +61 421 647 445
About Australian Critical Minerals
Australian Critical Minerals (ASX: ACM) is is a resource exploration company focused on developing a high-
grade portfolio of gold, silver, copper and critical mineral projects, with a core focus on Peru. In 2025, ACM
acquired a suite of highly prospective Peruvian assets spanning over 25,000 hectares. These assets are
strategically positioned to supply the critical metals driving global electrification, clean energy, and
industrial growth.
ACM also holds iron ore projects in Western Australia’s Pilbara region, offering long-term exposure to bulk
commodity demand. Backed by an experienced team with proven exploration and corporate success, ACM
is unlocking value across some of the world’s most richly endowed mineral belts.
Competent Persons Statement
The information in this report related to Exploration Targets and Exploration Results is based on information
compiled by Mr. Dean de Largie. Mr. de Largie is the Executive Chairman of Australian Critical Minerals
Limited and is a Fellow of the Australian Institute of Geoscientists and has sufficient experience relevant to
the styles of mineralisation under consideration and to the activity being reported to qualify as a Competent
Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves. Mr. de Largie has verified the data disclosed in this release and consented to
including the matters based on the information in the form and context in which it appears.
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Appendix 1
JORC CODE 2012 EDITION, TABLE 1
Section 1. Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g., cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure
sample representativity and the appropriate
calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that
are Material to the Public Report.
In cases where ‘industry standard’ work has been
done this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases, more
explanation may be required, such as where there
is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation
types (eg submarine nodules)
may warrant disclosure of detailed information.
2012 Induced Polarisation Survey
• A pole-pole induced polarisation survey was
completed by Arce Geofisicos on behalf of
Peru Minerals S.A.C between 4th
and 13th
September 2012.
• Data acquisition comprised pole-pole
induced polarisation on 10 WNW-ESE lines
on 200 m line spacing for a total of 9.20
line-km.
• Equipment used included an IRIS VIP4000
Transmitter (Tx), 6.5kW genset, and an
IRIS ElrecPro Receiver system (Rx).
Receiving electrodes were stainless steel
plates and transmitter electrodes were
buried aluminium plates. The survey
configuration used for all lines was standard
pole-pole (PPIP) with 50m receiver dipoles
and up to 7 receiver channels (N level).
Location was by use of a Trimble ProXRT
receiver, Zephyr 2 antenna and collector
Ranger 500X.
2025 Audio-frequency Magnetotellurics Survey
• A Natural Source Audio-frequency
Magnetotelluric (NSAMT) survey employing
contiguous E-field in an EMAP-style
configuration, with sparse tensor sites was
completed by Southernrock Geophysics on
behalf of Australian Critical Minerals
between19th November 2025 and 6th of
December 2025.
• Data acquisition comprised contiguous
100m E-field (EMAP-style) with sparse
tensor Audio-frequency Magnetotelluric
(AMT) data along fourteen west-east
oriented lines, spaced 300m apart for
planned 29.4 line-km. The western portion
of the southernmost line was not acquired
due to very steep topographic relief, and a
300 m segment of Line 10 was not acquired
due to land-access restrictions resulting in a
final survey coverage of 26.5 line-km. Time
series data acquired with sampling rates
(Fs) of 32kHz. Time series records of up to
222
samples for each Fs. Timing provided
by internal GPS. Data acquired over 3
intervals of 2 minutes each (~6 minutes
total per spread).
• Survey configuration used a dipole length of
100m, using contiguous along line Ex-field
(EMAP), with Sparse Tensor AMT sites
every 300m (spreads of three Ex-fields per
centrally located Ey, Hx, Hy measurements).
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
• Equipment used included a gDAS 32-bit
receiver and processing software and
Zonge ANT-4 and 6 induction coils.
Receiving electrodes were stainless-steel
plates in hand dug pits wetted with fresh
water.
Historic Surface Sampling
• No unreported sampling has been reported
in this press release. Historic geochemistry
results were previously reported June 12,
2025 in ’Australian Critical Minerals to
acquire significant gold and copper portfolio
in mineral rich Peru’ and August 13, 2025,
in ‘Notice of General Meeting/Proxy Form’.
Drilling
techniques Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (eg core diameter, triple or standard
tube, depth of diamond tails, face- sampling bit or
other type, whether core is oriented and if so, by
what method, etc).
• No drilling has been reported.
Drill sample
recovery Method of recording and assessing core and chip
sample recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
• No drilling has been reported.
Logging
Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the relevant
intersections logged.
• No drilling has been reported.
• No resource estimate has been reported.
• Historic surface rock chip samples were
qualitatively logged.
Sub- sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether quarter,
half or all core taken.
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
• No sampling has been reported
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
For all sample types, the nature, quality, and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain
size of the material being sampled.
Quality of
Assay data
and laboratory
tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used
in determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures adopted
(eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have
been established.
2012 Induced Polarisation Survey
• In 2025, ACM engaged Southernrock
Geophysics to complete new QAQC
analysis of the 2012 data.
.
2025 Audio-frequency Magnetotellurics
Survey
• Data QAQC and analysis was completed
by Southernrock Geophysics in 2025.
• Data processing was performed using
gDASPro. 1D and 2D inversion were
completed using Geotools (v.4.0.5) and
3D inversion using CGG’s cloud based
RLM3D service. The data was modelled
with 1D, 2D and 3D inversions to image
the resistivity distribution beneath the
surveyed sites, along survey lines and
across the survey area, to depths of
around 1.5 kilometres. These depths are
primarily constrained by the lateral extent
of the surveyed area rather than the
bandwidth itself.
• The Audio-frequency Magnetotelluric
(AMT) data acquired during this survey
was of good quality, with selected Zxy
data from 265 stations and Zyx data from
the 93 tensor sites having median
coherency coefficients of 0.96. The
percentage error estimates of Apparent
Resistivity and the Impedance Phase error
provide a generalized measure of data
quality for the Magnetotelluric survey. For
the selected Zxy and Zyx data, the median
error in Apparent Resistivity was 1.3%,
and the median Impedance Phase error
was 0.14° (2.4mr).
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Historic Surface Sampling
• Surface rock chip QAQC protocols were
previously reported in the June 12 and
August 13, 2025, press releases.
Verification of
sampling and
assaying
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, and data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
• No sampling and no assays have been
reported
Location of
data points Accuracy and quality of surveys used to locate drill
holes (collar and down- hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
2012 Induced Polarisation Survey
• Data was acquired using a Trimble
ProXRT DGPS receiver, Zephyr 2
antenna and collector Ranger 500X in
PSAD56 (+42 South America), UTM zone
17S.
• Topographic control was obtained from
SRTM 30m DTM with a nominal accuracy
of 16 m.
2025 Audio-frequency Magnetotellurics Survey
• Data was acquired using handheld GPS in
the wgs84 z 17S datum.
• Topographic control was obtained from
SRTM 30m DTM with a nominal accuracy
of 16 m.
Data spacing
and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
Whether sample compositing has been applied.
• No Mineral Resource and Ore Reserve
estimation is reported in this news
release.
2012 Induced Polarisation Survey
• Data was obtained on 10 WNW-ESE lines
on 200 m line spacing for a total of 9.20
line-km.
2025 Audio-frequency Magnetotellurics Survey
• Data was obtained on 14 E-W oriented
lines, spaced 300m apart for planned
29.4 line-km. The western portion of the
southernmost line was not acquired due
to very steep topographic relief, and a
300 m segment of Line 10 was not
acquired due to land-access restrictions
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
resulting in a final survey coverage of
26.5 line-km.
Orientation of
data in
relation to
geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
If the relationship between the drilling orientation
and the orientation of key mineralised
structures is considered to have introduced a
sampling bias, this should be assessed and
reported if material.
• Geophysics survey lines are
approximately perpendicular to the strike
of the hydrothermal system.
Sample
security The measures taken to ensure sample security. • No new or unreported sampling has been
reported
Audits or
reviews The results of any audits or reviews of sampling
techniques and data.
• No new or unreported sampling or assay
data is in this news release. The
geophysics program is in progress and will
be modelled and reviewed upon
completion.
Section 2. Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral tenement and land
tenure status Type, reference name/number, location
and ownership including agreements or
material issues with third parties such
as joint ventures, partnerships,
overriding royalties, native title
interests, historical sites, wilderness or
national park and environmental
settings.
The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence
to operate in the area.
• Flint has 3 licences. Gaya 103 is
held by Pegoco SAC which is a
100% owned subsidiary of ACM. El
Perseverante and Cerro Pedernal
are held through a 100% option to
purchase by Latin Gold SAC.
• Tenure is in good standing.
• There are no native title interests
Exploration done by other
parties Acknowledgment and appraisal of
exploration by other parties.
• Southern Rock Geophysics
modelled the NSAMT data and
remodelled the historical IP data.
Geology
Deposit type, geological setting, and
style of mineralisation.
• Flint is regarded as high-
sulphidation epithermal system.
The volcanic host rock has not been
formally dated, however it is
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
interpreted to be of approximately
Miocene age.
Drill hole Information
A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes: easting and northing of the drill
hole collar elevation or RL, dip and
azimuth of the hole, down hole length
and interception depth, hole length. If
the exclusion of this information is
justified on the basis that the
information is not Material and this
exclusion does not detract from the
understanding of the report, the
Competent Person should clearly
explain why this is the case.
• No drilling reported
Data aggregation methods
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (eg cutting of high grades)
and cut-off grades are usually Material
and should be stated.
Where aggregate intercepts incorporate
short lengths of high-grade results and
longer lengths of low-grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should
be shown in detail.
The assumptions used for any reporting
of metal equivalent values should be
clearly stated.
• No unreported sampling or
assays are included in this
release.
Relationship between
mineralisation, widths and
intercept lengths
These relationships are particularly
important in the reporting of Exploration
Results.
If the geometry of the mineralisation
with respect to the drill hole angle is
known, its nature should be reported.
If it is not known and only the down
hole lengths are reported, there should
be a clear statement to this effect (e.g.,
down hole length, true width not
known’).
Appropriate maps and sections
• No drilling has been reported.
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Diagrams
Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These
should include, but not be limited to a
plan view of drill hole collar locations
and appropriate sectional views.
• No sampling has been reported.
Balanced Reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting
of Exploration Results.
• No previously unreported assays
have been reported
Other substantive
exploration data Other exploration data, if meaningful
and material, should be
reported, including (but not limited to):
geological observations; geophysical
survey results; geochemical survey
results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
• Geological observations and
surface rock chip results were
previously reported in the June 12
and August 13 2025 press releases.
Further work
The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions, or large-scale step-
out drilling).
Diagrams clearly highlighting the areas
of possible extensions, including the
main geological interpretations and
future drilling areas, provided this
information is not commercially
sensitive.
• Next steps include a diamond
drilling program of 4 drill holes for
approximately 1,850m.
• Historically, the southern half of the
project has had less surface
geology and alteration mapping
compared to the northern sector.
This is expected to be addressed
concurrently with the planned
drilling campaign.
• Significant NSAMT anomalies exist
in the southern sector and so, IP is
planned in this region to further
define sub-surface conductors.
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Appendix 2
Figure 1 References
• Tantahuatay:
https://www.sec.gov/Archives/edgar/data/1013131/000141057824000577/tmb-
20231231xex96d9.pdf
• Cerro Corona:
https://www.goldfields.com/pdf/investors/quarterly-reports/2012/quarter-ended-30-
june-2012/presentation.pdf
• La Zanja:
https://s24.q4cdn.com/382246808/files/doc_downloads/reserves/Reserves-
Resources-for-Posting_Final.pdf
• Minas Conga:
https://s24.q4cdn.com/382246808/files/doc_financials/annual/2009_Annual_Report.p
df
• Michiquillay:
https://minedocs.com/22/Southern-Copper-Form-10K-2021.pdf
• Yanacocha:
Longo A A, Dilles J H, Grunder A L and Duncan R, 2010 - Evolution of Calc-Alkaline
Volcanism and Associated Hydrothermal Gold Deposits at Yanacocha, Peru : in Econ.
Geol. v.105 pp. 1191-1241
• Colpyoc:
https://announcements.asx.com.au/asxpdf/20140131/pdf/42mgk1877xcygh.pdf
• Igor:
https://framerusercontent.com/assets/m13wgL4uyKlpumTZVDR8aoPyL2U.pdf
• Shahuindo:
https://www.sec.gov/Archives/edgar/data/1510400/000106299316007314/exhibit99-
1.htm
• La Arena:
https://www.zijinmining.com/news/news-detail-121535.htm
• Alto Chicama:
https://s25.q4cdn.com/322814910/files/doc_financial/annual_reports/2010/Barrick-
Annual-Report-2010.pdf
• La Virgen:
https://propertyfile.gov.bc.ca/reports/PF676882.pdf
Share your feedback