Highlights
Shaw Project
•
Results of first program returned up to 61.3% Fe averaging 55.5% Fe from 7 rock-chip Banded Iron
Formation (BIF) samples
•
Second program identified two distinct BIF zones identified from recent fieldwork - Shaw Western BIF
Zone and Shaw Eastern BIF Zone
•
Shaw Western BIF Zone combined strike length of over 7km with mapped and interpreted BIF
unit widths over 100m
•
Shaw Eastern BIF Zone combined strike length of over 9km
•
32 samples were collected in September, results are expected in November 2024
Cooletha Project
•
First program results from 39 rock-chip Channel Iron Deposits (CID) sampling returned up to 62.6% Fe
averaging 54.9% Fe
•
Second program collected 189 rock chip samples of CID mineralisation
•
20m x 80m grid sampling completed over a 2km strike length of CID deposits covering a total area
approximately 300,000m2
•
Systematic sampling and mapping of CIDs will be used in a paleo-drainage interpretation and
reconstruction to develop new targets
Australian Critical Minerals (ASX: ACM, “Australian Critical Minerals” or “the Company”), a mineral exploration
company focused on the exploration and development of critical mineral projects in Western Australia, is pleased
to provide the following report on its activities for the quarter ended 30 September 2024. The Company is focused
on the iron and energy prospectivity of its large tenement package in the Pilbara.
SUMMARY OF ACTIVITIES
Pilbara – Cooletha and Shaw Projects
The Pilbara portfolio covers 453km2 and includes the Shaw and Cooletha Iron Ore Projects (Figure 1).
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 1 of 10
Figure 1 – Map of Pilbara projects
Shaw Project
The Shaw Project is prospective for Iron Ore hosted in Banded Iron Formation (BIF). The Shaw Project is located
adjacent to Hancock Prospecting’s Abydos Iron Ore Mine and south of Atlas Iron’s Miralga Creek Iron Ore Mine.
The Abydos host stratigraphy potentially extends into the Shaw tenements. The project benefits from its proximity
to the existing infrastructure at Abydos and Miralga Creek and its proximity to Port Hedland 100km to the north.
BIF Discovery Process
ACM has significantly advanced its understanding of the BIF occurrences at the Shaw Project. Several corridors
of BIF targets were identified through the integration of recent sampling data, mapping and multispectral remote
sensing interpretations.
During the quarter, ACM geologists conducted a first-round reconnaissance rock chip sampling program, which
successfully validated the presence of extensive, underexplored BIF occurrences.
In September, ACM completed its Phase 2 rock chip sampling program, collecting 32 samples with mapped BIF
occurrences with approximate widths of up to 100m (Figure 2). The delineation of these BIF units has been
significantly enhanced, and they will form the focus of a follow-up sampling program planned for late November
2024.
Geological observations indicate that the BIF lithologies at Shaw occur as linear, sub-parallel, folded and brecciated
units within the structurally complex western side of the tenement. The Western BIF Zone consists of up to three
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 2 of 10
sub-parallel horizons, with a combined strike length exceeding 7km. Similarly, the Eastern BIF Zone has a strike
length of approximately 6km, featuring sub-parallel BIF horizons (Figure 3).
Field observations continue to suggest that the BIF-bearing formations at Shaw are likely strike extensions of the
Cleaverville Formation, which hosts notable direct shipping ore (DSO) iron ore deposits, including those at the
Abydos and Miralga Creek Mines.
Figure 2 – Location of ACM Shaw Project’s BIF Zones and September 2024 reconnaissance sampling
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 3 of 10
Figure 3 – Shaw Project Western BIF Zone comprises up to 3 sub-parallel BIF horizons over a combined strike
length of +7km. RP42247/48 – laminated BIF with >80% hematitic layers
During the quarter, ACM partially reduced the tenement size at Shaw, as is the requirement of the tenement licence.
Those regions considered the most prospective for iron or energy metals were retained (Figure 4).
Analogue – Miralga Creek Project – WA
At Miralga Creek, the Banded Iron Deposits (BID) are up to 100m thick, consisting of units of BIF chert, shale and
sandstone segregated by thick layers of quartzites and meta-felsic sandstones. The operator views Miralga Creek
as an extension of the Abydos Mining Complex. This stratigraphic sequence passes through the northern part of
the Shaw tenement, where BIF units were identified during reconnaissance.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 4 of 10
In the structurally complex western side of the Shaw tenement, BIF units occur as linear, folded and brecciated
formations. The western side hosts approximately 7km of BIF stratigraphy, while the eastern side contains over
3km (Figure 2). Field reconnaissance and preliminary spectral analysis have identified that the Shaw tenement
may contain at least nine satellite BIFs. Field observations at the Shaw Fe targets are analogous to the descriptions
of Miralga Creek stratigraphy.
Shaw U Targets
ACM has identified a Uranium-Thorium radiometric anomaly within northern Shaw's pebble and boulder
conglomerates. This anomaly is strongly analogous to the quartz-pebble conglomerate hosting the Canadian Elliot
Lake Uranium deposits. The pebble-to-boulder conglomerate is 30m to 100m wide and extends for approximately
9km strike length in an east-west orientation in northern Shaw.
Visual identification of the conglomerate unit coincides with a high uranium and thorium radiometric anomaly. The
size of this anomaly is significant, and a comparison with the Elliot Lake resource is shown in Figure 4. Australia
currently supplies 8% of global uranium production from three mines and holds about one-third of global uranium
resources. Public sentiment in Australia is increasingly recognising the potential role of nuclear energy in the
country's future energy generation.
Figure 4 – Shaw Project U-Th Radiometric Targets and BIF areas
Cooletha Project
At Cooletha, ACM holds 252km2 of granted tenure and 151km2 of tenement applications with approximately half of
this area containing the stratigraphy of the Fortescue Group, which is prospective for CIDs. The Cooletha Project is
located north of Fortescue Metals Group’s (ASX: FMG) East Pilbara Complex and north-west of Hancock
Prospecting’s Roy Hill Mine. The Cooletha Project has excellent infrastructure with both FMG and Hancock
Prospecting’s rail infrastructure transecting the tenements.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 5 of 10
CID Discovery Process
An integrated multispectral remote sensing interpretation successfully generated CID and ferruginous regolith
targets for field investigation. Initial reconnaissance sampling and field observations undertaken during the quarter
confirmed the presence of strongly cemented, goethitic pisolitic CIDs at Cooletha.
As part of the ongoing exploration during Phase 2, ACM's team collected an additional 189 rock chip samples
targeting CID mineralisation. The potential for concealed CIDs beneath Tertiary or Quaternary sediments will be a
key focus of further investigation, pending the results from the current round of rock chip sampling.
Figure 5 – Cooletha CID targets sampled during the Quarter
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 6 of 10
Analogue - Bonnie Creek - WA
Bonnie Creek is a CID with a reported 2008 Mineral Resource Estimate of 47.2 Mt @ 53.6% Fe (BC Iron Annual
Report, 2008). The Bonnie Creek CIDs are also hosted in the Fortescue Group stratigraphy and have a total CID
strike length of approximately 10km (BC Iron Press Release, 2 April 2009).
Analogue – Solomon and Serenity – WA
In 2005, FMG discovered a buried CID paleochannel system through target generation and early-stage
reconnaissance sampling (Kepert et al., 2010). This discovery by FMG, of approximately 30km strike length of
CIDs concealed beneath cover units of the Mt Bruce Supergroup, was developed into a world-class deposit
containing 2.9Gt of detrital and bedded iron ore mineralisation (Kepert et al., 2010).
ACM is investigating the parallels between the exploration rationale at Solomon and Serenity and its application to
the forward work program at Cooletha; in particular, FMG’s discovery success highlights the potential for CIDs to
be concealed beneath overlying units of the Fortescue Group and how important it is to understand the paleo
drainage system and its implications for the exploration targeting process.
Rankin Dome Project
After regional exploration and observations ACM has informed Kula Gold Limited that the Company wishes to
remove the two southern most tenements from the option agreement with Kula Gold.
Kaolin Projects
ACM has conducted a strategic review of its kaolin assets within its tenement portfolio, including the Kojonup,
Kondinin and Beverly projects. Since ACM’s listing in July 2023, most ASX-listed peers have experienced
substantial declines, particularly in kaolin assets. Many have shifted their focus to commodities with higher current
and projected demand, such as rare earths, uranium and lithium, and have relinquished or disposed of their kaolin
assets.
Due to weakened investor sentiment for kaolin, ACM recognised the diminishing support for the exploration and
development of its kaolin assets. Consequently, ACM has relinquished its tenements and increased its emphasis
on energy sectors, battery minerals, and higher-value projects, including iron ore.
Upcoming Exploration Activities
ACM is set to advance exploration at both the Cooletha and Shaw Projects with a series of focused programs
designed to build on recent discoveries:
•
A targeted follow-up sampling program at Shaw is scheduled for November 2024, focusing on newly delineated
BIF zones, particularly within the Western and Eastern BIF zones. This will include further geological mapping
and analysis to define the extent and grade of mineralisation.
•
Additional field mapping and reconnaissance rock chip sampling at Cooletha is planned to extend the known
footprint of CID. Systematic grid sampling will continue across approximately 45km of CID-prospective
stratigraphy, with ongoing paleo-drainage analysis aimed at uncovering potential concealed deposits.
•
ACM is awaiting the results of 221 samples collected during September 2024 from both the Cooletha and Shaw
projects. These results will guide further exploration and target refinement. Specifically, the ACM team is
returning to Shaw to continue sampling and defining the extensions of the BIF horizons in mid-November.
These activities will continue to build ACM’s understanding of the geological potential of the tenements and refine
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 7 of 10
exploration strategies as the company progresses toward its development goals.
CORPORATE
The Company’s cash position at 30 September 2024 was $2.22 Million.
Additional ASX Information
Summary of Exploration Expenditure (ASX Listing Rule 5.3.1)
In accordance with Listing Rule 5.3.1, the Company advises the cash outflows on its mining exploration activities
reported in 1.2(1) of its Appendix 5B for the September 2024 quarter and detailed above were, Cooletha $57,128,
Rankin Dome $12,715, Shaw $66,655 and other $46,957.
Mining Production and Development (ASX Listing Rule 5.3.2)
There were no substantive mining production and development activities during the quarter.
Payment to Related Parties (ASX Listing Rule 5.3.5)
The Company advises the payments in section 6.1 of Appendix 5B for the quarter related to director, company
secretarial and accounting fees.
Finance and Use of Funds (ASX Listing Rule 5.34)
Pursuant to ASX Listing Rule 5.34, the Company provides a comparison of its actual expenditure to the estimated
expenditure as set out in section 4.6 of the Company’s Prospectus.
Activity Description
Funds allocated
Actual to date (15 months)
Exploration (2 yrs)
$3,500,100
$1,011,622
Administration (2 yrs)*
$974,791
$775,918
Repayment of Borrowings
$147,005
$147,005
Expenses of the Offer
$546,757
$546,757
* Includes some staff costs which were not allocated to Exploration at the time of preparation
The mining tenement interests acquired or relinquished during the quarter and their location:
Tenement Number
Project
Status Update
E 70/5772
Kojonup
Relinquished
E 70/5773
Kojonup
Relinquished
E 70/5774
Kojonup
Relinquished
E 70/5775
Kojonup
Relinquished
E 70/5608
Kondinin
Relinquished
E 70/5609
Kondinin
Relinquished
E 70/5610
Kondinin
Relinquished
E 70/5574
Beverley
Relinquished
E 70/6148
Beverley
Relinquished
E 77/2709
Rankin Dome
Removed from Option
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 8 of 10
E 77/2753
Rankin Dome
Removed from Option
Table 1 – Tenement portfolio changes
This release has been approved by the Board of Australian Critical Minerals Limited.
For further information, please contact:
Dean de Largie
Managing Director
Ben Creagh / Andrew Willis
Investor and Media Relations
Australian Critical Minerals Limited
E info@auscriticalminerals.com.au
T +61 (8) 6165 8858
NWR Communications
E benc@nwrcommunications.com.au
E awillis@nwrcommunications.com.au
About Australian Critical Minerals
Australian Critical Minerals is an exploration company focused on developing a quality portfolio of critical minerals
projects in Western Australia. The key projects are the Shaw and Cooletha (Pilbara) Lithium/Iron Projects and the
Rankin Dome (Southern Cross) Rare Earth Project.
Battery metals, including rare earths and lithium, are fundamental in the clean energy transition to net zero
transmissions. ACM intends to be pivotal in delivering the processed minerals needed for a clean energy future.
ACM has established a highly experienced management team with a proven record of exploration and corporate
success in the mining industry.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 9 of 10
TENEMENT INFORMATION (ASX Listing Rule 5.3.3)
The table below shows the interest in tenements held by Australian Critical Minerals and its wholly owned
subsidiaries and is provided in accordance with ASX Listing Rule 5.3.3.
COOLETHA PROJECT
Tenement ID
E 45/4990
E 45/5228
E 45/5052
E 45/6375
HOLDER
PROTEROZOIC GOLD PTY LTD
PROTEROZOIC GOLD PTY LTD
PROTEROZOIC GOLD PTY LTD
PROTEROZOIC GOLD PTY LTD
INTEREST
100%
100%
100%
100%
STATUS
GRANTED
GRANTED
PENDING
PENDING
24/10/2019
29/07/2019
-
GRANT DATE
AREA BLOCKS
39
40
5
42
STATUS
GRANT DATE
AREA
BLOCKS
GRANTED
26/03/2021
36
AREA
BLOCKS
29
RANKIN DOME PROJECT
Tenement ID
HOLDER
E 77/2768
INTEREST
EARNING
51%
KULA GOLD LIMITED
SHAW PROJECT
Tenement ID
E 45/5006
HOLDER
INTEREST
STATUS
GRANT DATE
PROTEROZOIC GOLD PTY LTD
100%
GRANTED
4/07/18
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 10 of 10
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Australian Critical Minerals Limited
ABN
Quarter ended (“current quarter”)
15 658 906 159
30 SEPTEMBER 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(3 months)
$A’000
-
-
(183)
-
(183)
(c) production
-
-
(d) staff costs
(79)
(79)
(e) administration and corporate costs
(126)
(126)
(a) exploration & evaluation
(b) development
-
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
3
3
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (GST Refund)
10
10
1.9
Net cash from / (used in) operating
activities
(375)
(375)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) exploration & evaluation
-
-
(e) investments
-
-
(f)
-
-
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(3 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (cash balance of subsidiaries on
acquisition)
-
-
2.6
Net cash from / (used in) investing
activities
-
-
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
3.9
Other – Repayment of lease liability
Other – Cash items from financing activities
-
-
3.10
Net cash from / (used in) financing
activities
-
-
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
2,598
2,598
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(375)
(375)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
-
-
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(3 months)
$A’000
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
-
4.5
Effect of movement in exchange rates on
cash held
-
-
4.6
Cash and cash equivalents at end of
period
2,223
2,223
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
2,223
2,598
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
2,223
2,598
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
73
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(375)
8.4
Cash and cash equivalents at quarter end (item 4.6)
2,223
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
2,223
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
5.94
-
$A’000
(375)
-
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
n/a
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
n/a
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
n/a
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
31 October 2024
Authorised by: By the Board
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5
Share your feedback
Discover