Half Year Accounts
Released
Released
Announcement PDF
ABN 15 658 906 159
and its controlled entities
Half-year report for the
half-year ended
31 December 2024
Australian Critical Minerals Limited
TABLE OF CONTENTS
Corporate directory
1
Directors’ report
2
Auditor's independence declaration
8
Condensed Consolidated Statement of profit or loss and other comprehensive income
9
Condensed Consolidated Statement of financial position
10
Condensed Consolidated Statement of changes in equity
11
Condensed Consolidated Statement of cash flows
12
Condensed Notes to the half-year financial statements
13
Directors’ declaration
20
Independent auditor's review report
21
Australian Critical Minerals Limited
Corporate directory
Board of Directors
Mr Dean De Largie
Mr Michael Wright
Mr Gary Brabham
Managing Director
Non-Executive Chairman
Non-Executive Director
Company Secretaries
Mr Johnathon Busing
Mr Kieran Witt
Registered and Principal Office
168 Stirling Highway
Nedlands WA 6009
Tel:
+61 8 6165 8858
Website
www.auscriticalminerals.com.au
Auditors
Hall Chadwick WA Audit Pty Ltd
283 Rokeby Road Subiaco
WA 6008
Share Registry
Xcend Pty Ltd
Level 2, 477 Pitt Street
Haymarket NSW 2000
Tel:
+61 2 7208 8033
Stock Exchange
Australian Securities Exchange
Level 40, Central Park
152- 158 St Georges Terrace
Perth, Western Australia 6000
ASX Code
ACM
ACMOA
1
Australian Critical Minerals Limited
Directors’ report
The directors of Australian Critical Minerals Limited (the "Company”) present their report together with the
financial report of Australian Critical Minerals Limited and its controlled entities (“the Group”), for the halfyear ended 31 December 2024, and auditor's review report thereon. In order to comply with the provision of
the Corporations Act 2001, the directors report as follows:
Directors
The following people were Directors of ACM during the half year and up to the date of this report. Directors
were in the office for the entire period, unless otherwise stated.
Michael Wright – Non-Executive Chairman
Dean De Largie – Managing Director
Gary Brabham – Non-Executive Director
Operating results
The consolidated loss of the Group for the half-year, after providing for income tax, amounted to $725,270
(31 December 2023: $1,046,593). Further discussion on the Group’s operations is provided below.
Review of operations
The Company maintains a portfolio of three projects in the Pilbara and Southwest Goldfields regions of WA
including:
• Cooletha Iron and Lithium Project
• Shaw Iron and Uranium Project
• Rankin Dome Rare Earths Project
Pilbara – Cooletha and Shaw Projects
ACM’s Pilbara portfolio comprises the Cooletha and Shaw Projects and covers 494km 2. During the reporting
period, the Company achieved significant progress across at Shaw and Cooletha Projects, both of which
demonstrated high-grade iron ore potential and further strengthened the company’s strategic focus on
developing high-quality iron ore resources.
2
Australian Critical Minerals Limited
Figure 1 – Location map of ACM’s projects in Pilbara – Shaw and Cooletha Projects
Cooletha Iron Ore Project
At Cooletha, ACM holds 252km2 of granted tenure and 151km2 of tenement applications with approximately
half of this area containing the stratigraphy of the Fortescue Group, which is prospective for combined
channel iron deposits (CIDs).
The Cooletha Project is located north of Fortescue Metals (ASX: FMG) East Pilbara Complex and north-west
of Hancock Prospecting’s Roy Hill Mine. Cooletha is located at the southern contact of the Pilbara Craton and
the Fortescue Basin, with Channel Iron Deposits occurring above the Fortescue Group rock unit. These paleo
drainage systems have been identified over a strike length of 5kms at Cooletha East and 30kms between
Cooletha Central and Cooletha West. The size potential of the Cooletha CIDs is significant, drawing
comparisons to the nearby Bonnie Creek resource (BC Iron ASX:BCI), which has 89Mt at 54.1% Fe within
10kms of CIDs.
The Cooletha Project has excellent infrastructure with both FMG and Hancock Prospecting’s rail infrastructure
transecting the tenements.
3
Australian Critical Minerals Limited
Figure 2 – Overview of Cooletha, named CIDs, results, and proximal rail, camp and airstrip
infrastructure
Iron Project
During the reporting period, ACM completed two sampling programs at Cooletha, with high-grade Channel
Iron Deposits (CIDs) returning assay results up to 62% Fe.
From the first program, rock samples returned an average iron content of 54.9% Fe from 39 samples taken
from the central and eastern regions. The Cooletha Central Channel Iron Deposit (CID) extends approximately
4kms in length and was estimated to have a thickness of around 30m, though the full thickness is obscured
by scree. Of the 15 samples taken from this CID, 13 returned assays exceeding 50% Fe, with a peak value of
59.3% Fe.
189 rock chip samples of CID mineralisation were collected during the second program, with nine very high
grade Fe assays of 62%, 61.3%, 61.1%, 60.8%, 2 of 60.4%, 60.3%, 60.1%, 60% Fe
The deposits at Cooletha span a combined strike length of nearly 8 km, with strike lengths of individual CIDs
up to 3km with widths up to 300m and featuring consistent iron concentrations and low impurity levels with
a phosphorus content of around 0.04%. These characteristics signal strong beneficiation potential and highquality ore yield.
(Refer ACM:ASX Announcement 27/11/24, “Significant +60% Fe Results from Pilbara Iron Exploration”)
Shaw Iron Ore and Uranium Project
The Shaw Project is prospective for Iron Ore, with potential in both Banded Iron Formation (BIF) and as
Channel Iron Deposits.
The Shaw Project is located adjacent to Hancock Prospecting’s Abydos Mine and south of Atlas Iron’s Miralga
Creek Iron Ore Mine. The Abydos host stratigraphy potentially extends into the Shaw tenements. The Shaw
tenement, characterised by volcanic and sedimentary rocks of the De Grey Supergroup, domal granitic
complexes, and minor intrusions, presents multiple exploration opportunities, including BIF, conglomeratehosted gold, and uranium mineralisation.
The project benefits from its proximity to existing infrastructure, including rail, and is located just 100km SSE
of Port Hedland.
4
Australian Critical Minerals Limited
During the reporting period, ACM completed two sampling programs, identifying high-grade iron results with
notable assays including 65% Fe, 61% Fe and 3 samples of 60% Fe. The project hosts extensive BIF zones,
including the Shaw Western BIF Zone, which extends over 7 km and features widths up to 100 meters. The
Eastern BIF Zone has a combined strike length of approximately 6 km.
A high-priority focus zone within the mapped BIF has been identified, featuring steeply dipping formations
and a surface footprint exceeding 70,000 square meters, demonstrating the potential for direct shipping ore
(DSO) with low phosphorus levels of approximately 0.055%.
(Refer ACM: ASX announcement 9/12/24 “High Grade up to 65% Iron Identified at Shaw. Direct Shipping Ore
(DSO) Potential Identified”).
Figure 3 – Shaw Rock Sample Results Thematic
Uranium
ACM identified a Uranium-Thorium radiometric anomaly within northern Shaw's pebble and boulder
conglomerates which is strongly analogous to the quartz-pebble conglomerate hosting the Canadian Elliot
Lake Uranium deposits.
The pebble-to-boulder conglomerate is 30m to 100m wide and extends for approximately 9km strike length
in an east-west orientation in northern Shaw.
Visual identification of the conglomerate unit coincides with the high uranium and thorium radiometric
anomaly. The size of this anomaly is significant, and a comparison with the size of the Elliot Lake resource is
detailed in the below figure.
5
Australian Critical Minerals Limited
Figure 4 - Radiometric anomalies in Northern Shaw and Elliot Lake geology and size comparison
Future Activities
Looking ahead, ACM plans to continue advancing exploration, including a targeted follow-up sampling
program at Shaw and systematic grid sampling across CID-prospective stratigraphy at Cooletha. Preparations
for drill access and future drilling programs are also underway, with activities planned to commence in early
2025, with drilling to focus on high-priority targets at Cooletha West.
The Company is assessing follow up programs for the Pilbara Projects which may include:
•
•
•
•
•
Grid sampling of the CID outcrops and scree slopes at Cooletha
Systematic sampling of the extensive broad BIF horizons identified recently at Shaw
Field investigation of the Shaw radiometric anomaly
Initial sampling and possibly ground geophysics at the northern Shaw radiometric anomaly
Reduction of the tenement size at Shaw to focus on areas that have higher prospectivity
ACM aims to build upon its recent discoveries and continue progressing towards its development goals,
ultimately creating significant value for its shareholders.
Relinquished Tenement Interests
Kaolin Projects
Following a strategic review completed during the reporting period and due to weakened investor sentiment,
ACM reduced its focus on kaolin and relinquished tenements.
Rankin Dome Rare Earth Project
The Rankin Dome Project comprises three exploration licences in the Youanmi Terrane near Southern Cross.
6
Australian Critical Minerals Limited
ACM has a farm-in agreement with Kula Gold Limited (ASX: KGD) with a 51% interest in the project.
There was no activity at Rankin Dome during the reporting period as the Company focused on the potential
of the iron prospects in the Pilbara.
Corporate
ACM appointed Stuart Robinson as Technical Advisor in December 2024. Mr. Robinson has bought extensive
expertise from his 18-year tenure at Fortescue Metals Group (FMG), where he played a crucial role in
transforming FMG into a globally significant iron ore producer. His experience will provide ACM with ongoing
support with the goal of deriving full value for its iron ore assets.
Principal activities
The principal activities of the Group were to explore for, discover and then proceed to develop mineral
deposits. No significant change in these activities occurred during the period.
After balance sheet date events
In January 2025, the Company formally withdrew its interest in exploration licence E77/2768, effectively
terminating all further obligations under the Farm-In Agreement with Kula Gold Limited.
No other matters or circumstances have arisen since the end of the period which significantly affected or may
significantly affect the operations of the Group, the results of those operations, or the state of affairs of the
Group in future financial years.
Significant changes in state of affairs
There have been no significant changes in state of affairs of the Group since 31 December 2024.
Likely developments and expected results of operations
The Company will continue with its exploration activities, whilst at the same time, will continue to review
other corporate opportunities to drive shareholder wealth.
Auditor’s independence declaration
A copy of the auditor's independence declaration under section 307C of the Corporations Act 2001 in relation
to the audit for the financial period is provided with this report.
Signed in accordance with a resolution of the directors.
Dean De Largie
Managing Director
14 March 2025
Perth, Western Australia
7
To the Board of Directors,
AUDITOR’S INDEPENDENCE DECLARATION UNDER SECTION 307C OF THE
CORPORATIONS ACT 2001
As lead audit director for the review of the financial statements of Australian Critical Minerals Limited and its
controlled entities for the period ended 31 December 2024, I declare that to the best of my knowledge and
belief, there have been no contraventions of:
•
the auditor independence requirements of the Corporations Act 2001 in relation to the review; and
•
any applicable code of professional conduct in relation to the review.
Yours Faithfully,
HALL CHADWICK WA AUDIT PTY LTD
Dated this 14th day of March 2025
Perth, Western Australia
MARK DELAURENTIS CA
Director
Australian Critical Minerals Limited
Condensed Consolidated statement of profit or loss and other comprehensive
income for the half-year ended 31 December 2024
31-Dec-24
$
31-Dec-23
$
40,747
(36,155)
(130,750)
(21,345)
(541)
(225,065)
(48,668)
(21,724)
91,000
(372,769)
(725,270)
6,116
(91,421)
(140,846)
(15,942)
(900)
(140,583)
(645)
(6,146)
(656,226)
(1,046,593)
Income tax expense
Loss after income tax
(725,270)
(1,046,593)
Other comprehensive income
Total comprehensive loss
(725,270)
(1,046,593)
(1.67)
(2.40)
Note
Continuing operations
Interest income
Administration Expenses
Consulting Expenses
Compliance costs
Depreciation
Directors Fees
Exploration Expenses
Professional Fees
Share-based payments
Exploration and evaluation expenditure written off
Loss before income tax
5
10
6
Loss per share:
Basic and diluted (cents per share)
The accompanying notes form part of these financial statement.
9
Australian Critical Minerals Limited
Condensed Consolidated statement of financial position as at 31 December 2024
Note
31-Dec-24
$
30-Jun-24
$
1,728,531
49,759
39,850
1,818,140
1,098,155
28,385
4,136
1,500,000
2,630,676
420,281
2,144
422,425
2,240,565
420,281
2,687
422,968
3,053,644
Current liabilities
Trade and other payables
Borrowings
Total current liabilities
157,842
157,842
154,651
154,651
Non-Current liabilities
Total non-current liabilities
Total liabilities
157,842
154,651
2,082,723
2,898,993
6,397,232
1,492,475
(5,806,984)
2,082,723
6,397,232
1,583,475
(5,081,714)
2,898,993
Current assets
Cash and cash equivalents
Other receivables
Prepayments
Other assets
Total current assets
7
Non-current assets
Exploration and evaluation expenditure
Fixed Assets
Total non-current assets
Total assets
6
Net assets
Equity
Issued capital
Reserves
Accumulated losses
Total equity
8
9
The accompanying notes form part of these financial statements.
10
Australian Critical Minerals Limited
Condensed Consolidated statement of changes in equity for the half-year ended 31
December 2024
Issued capital
Accumulated
losses
Reserve
Total equity
$
6,397,232
-
$
1,583,475
-
$
(5,081,714)
(725,270)
$
2,898,993
(725,270)
Total comprehensive loss for the
period
-
-
(725,270)
(725,270)
Share-based payments
-
(91,000)
-
(91,000)
Balance as at 31 December 2024
6,397,232
1,492,475
(5,806,984)
2,082,723
Balance at 1 July 2023
Loss for the period
6,869,855
-
1,755,912
-
(2,361,071)
(1,046,593)
6,264,696
(1,046,593)
-
-
(1,046,593)
(1,046,593)
Share issue costs
Issue of listed options
Share-based payments
(472,623)
-
87,063
132,500
-
(472,623)
87,063
132,500
Balance as at 31 December 2023
6,397,232
1,975,475
(3,407,664)
4,965,043
Balance at 1 July 2024
Loss for the period
Total comprehensive loss for the
period
The accompanying notes form part of these financial statements.
11
Australian Critical Minerals Limited
Condensed Consolidated statement of cash flows for the half-year ended 31
December 2024
Note
31-Dec-24
$
31-Dec-23
$
Cash flows from operating activities
Interest received
Payments to suppliers and employees
Payments for exploration, evaluation, and development
Net cash (used in) operating activities
40,747
(534,578)
(375,793)
(869,624)
6,116
(494,914)
(638,156)
(1,126,954)
Cash flows from investing activities
Acquisition, net of cash acquired
Payment for tenement acquisition
Loan to third party
Cash transferred to term deposits
Net cash provided by / (used in) investing activities
1,500,000
1,500,000
(2,500,000)
(2,500,000)
Cash flows from financing activities
Proceeds from issue of options
Payments for share issue costs
Repayment of short-term loans
Net cash provided by financing activities
-
87,063
(557,964)
(147,005)
(617,906)
Net increase in cash and cash equivalents
630,376
(4,244,860)
1,098,155
1,728,531
5,002,565
757,705
Cash and cash equivalents at the beginning of the period
Cash and cash equivalents at the end of the period
The accompanying notes form part of these financial statements.
12
Australian Critical Minerals Limited
Condensed notes to the half-year financial statements
NOTE 1: GENERAL INFORMATION
Australian Critical Minerals Limited (ASX:ACM) (“the Company”) is a listed public company incorporated in
Australia. The addresses of its registered office and principal place of business are disclosed in the corporate
directory to the financial report.
The principal activities of the Company and its controlled entities (“the Group”) are described in the directors’
report.
NOTE 2: STATEMENT OF MATERIAL ACCOUNTING POLICIES
The financial report is for the entity Australian Critical Minerals Limited and its controlled entities (“the
Group”). Australian Critical Minerals Limited is a company limited by shares, incorporated, and domiciled in
Australia. The half-year financial report is a general-purpose financial report prepared in accordance with the
Corporations Act 2001 and AASB 134 ‘Interim Financial Reporting’. The Group is a for-profit entity for financial
reporting purposes under Australian Accounting Standards. Compliance with AASB 134 ensures compliance
with International Financial Reporting Standard IAS 34 ‘Interim Financial Reporting’.
Compliance with Australian Accounting Standards ensures that the financial statements and notes of the
Group comply with International Financial Reporting Standards (‘IFRS’) issued by the International Accounting
Standards Board.
The half-year financial report was approved by the directors as at the date of the directors' report.
The following specific accounting policies, which are consistent with the previous year unless otherwise
stated, have been adopted in the preparation of this report:
(a) Basis of preparation of the financial report
The half-year report has been prepared on an accrual basis and are based on historical cost convention.
(b) Going concern
The half-year report has been prepared on a going concern basis, which contemplates the continuity of
normal business activity and the realisation of assets and the settlement of liabilities in the ordinary course
of business.
The Group incurred a loss for the period ended 31 December 2024 of $725,270 and net cash outflows from
operating activities of $869,624. At 31 December 2024, the Group had working capital of $1,660,298 and cash
balance of $1,728,531.
The directors have reviewed the business outlook and cash flow forecasts and are of the opinion that the use
of the going concern basis of accounting is appropriate.
13
Australian Critical Minerals Limited
NOTE 2: STATEMENT OF MATERIAL ACCOUNTING POLICIES (Cont’d)
(c) Principles of consolidation
The consolidated financial statements incorporate all assets, liabilities, and results of the parent and all of its
subsidiaries. Subsidiaries are entities the parent controls. The parent controls an entity when it is exposed to,
or has rights to, variable returns from its involvement with the entity and has the ability to affect those returns
through its power over the entity.
The assets, liabilities and results of all subsidiaries are fully consolidated into the financial statements of the
Group from the date on which control is obtained by the Group. The consolidation of a subsidiary is
discontinued from the date that control ceases. Intercompany transactions, balances and unrealised gains or
losses on transactions between entities are fully eliminated on consolidation. Accounting policies of
subsidiaries have been changed and adjustments made where necessary to ensure uniformity of the
accounting policies adopted by the Group.
NOTE 3: NEW ACCOUNTING STANDARDS AND INTERPRETATIONS ISSUED BUT NOT OPERATIVE
(a) Standards and Interpretations applicable to 31 December 2024
In the half-year ended 31 December 2024, the Directors have reviewed all of the new and revised Standards
and Interpretations issued by the AASB that are relevant to the Group’s operations and effective for annual
reporting periods beginning on or after 1 July 2024. As a result of this the Directors have determined that
there is no impact, material or otherwise, of the new and revised standards and interpretations on the
Group’s business and, therefore, no change is necessary to the Group’s accounting policies.
(b) Standards and Interpretations in issue not yet adopted
The Directors have also reviewed all new Standards and Interpretations in issue not yet adopted for the halfyear ended 31 December 2024. As a result of this the Directors have determined that there is no impact,
material or otherwise, of the standards and interpretations in issue not yet adopted on the Group’s business
and, therefore, no change is necessary to the Group’s accounting policies.
NOTE 4: CRITICAL ACCOUNTING ESTIMATES AND JUDGEMENTS
Certain accounting estimates include assumptions concerning the future, which, by definition, will seldom
represent actual results. Estimates and assumptions based on future events have a significant inherent
risk, and where future events are not as anticipated there could be a material impact on the carrying
amounts of the assets and liabilities discussed below:
The Group assesses impairment at the end of each reporting period by evaluating the conditions and
events specific to the Group that may be indicative of impairment triggers. Recoverable amounts of
relevant assets are reassessed using valueinuse calculations which incorporate various key assumptions.
14
Australian Critical Minerals Limited
NOTE 4: CRITICAL ACCOUNTING ESTIMATES AND JUDGEMENTS (Cont’d)
Impairment of capitalised development costs
Capitalised development costs is reviewed for impairment if there is any indication that the carrying amount
may not be recoverable.
The directors are required to exercise judgement on future events and the likelihood of defining an economic
reserve. Assumptions made are altered as development continues and more information becomes available.
Where it is evident that the value of development costs cannot be recovered, the capitalised amount will be
impaired through the statement of profit or loss and other comprehensive income.
NOTE 5: REVENUE
Interest Income
31-Dec-24
$
40,747
40,747
31-Dec-23
$
6,116
6,116
31-Dec-24
$
420,281
372,769
(372,769)
30-Jun-24
$
1,738,315
1,107,993
(224,000)
(2,202,027)
420,281
420,281
NOTE 6: EXPLORATION AND EVALUATION EXPENDITURE
Carried forward exploration and evaluation expenditure
Expenditure incurred during the period
Impairment of acquisition costs – performance rights(i)
Impairment of exploration and evaluation expenditure (ii)
Carrying value at end of the period
(i)
Management estimates that the performance milestones for PR class A-Vendor, B-Vendor and
C-Vendor are not likely to be achieved. The $224,000 value of the performance rights was
reversed against reserves during the 2024 financial year.
(ii)
An impairment expense of $372,769 has been recognised in profit or loss for the half-year
ended 31 December 2024 (30 June 2024: $2,202,027). This is consistent with the Group’s
policy on exploration and evaluation expenditure.
Exploration expenditure per subsidiary
31-Dec-24
$
420,281
420,281
Bayzephyr Pty Ltd
Evextra Pty Ltd
Newnation Holdings Pty Ltd
Proterozoic Gold Pty Ltd
15
30-Jun-24
$
420,281
420,281
Australian Critical Minerals Limited
NOTE 6: EXPLORATION AND EVALUATION EXPENDITURE (Cont’d)
In accordance with the Group’s Accounting Policy the acquired exploration and evaluation expenditure has
been capitalised in the Consolidated Statement of Financial Position.
NOTE 7: OTHER ASSETS
31-Dec-24
$
-
30-Jun-24
$
1,500,000
1,500,000
31-Dec-24
$
30-Jun-24
$
6,397,232
6,397,232
No.
31-Dec-24
$
No.
30-Jun-24
$
43,531,260
43,531,260
6,397,232
6,397,232
43,531,260
43,531,260
6,869,855
(472,623)
6,397,232
31-Dec-24
$
1,583,475
(91,000)
1,492,475
30-Jun-24
$
1,755,912
(224,000)
(168,000)
87,063
132,500
1,583,475
Term Deposit
NOTE 8: ISSUED CAPITAL
(a) Issued and fully paid 43,531,260
ordinary shares
(b) Movement in ordinary shares
Balance at beginning of period
Share issue costs
Balance at end of period
NOTE 9: RESERVES
Balance at the beginning of the period
Issue of performance rights to vendors
Issue of performance rights to managing director(i)
Issue of listed options
Issue of listed options
Carrying value at end of the period
(i)
Management estimates that the performance milestones for B-MD performance rights is not likely
to be achieved, therefore, the value of the share-based payment was reversed during the period.
16
Australian Critical Minerals Limited
NOTE 9: RESERVES (Cont’d)
Options and Performance Rights
Details of the Company’s unissued shares or interests under options or performance rights as at the date of
this report are:
Grant date
Number of
option
Class of
shares
Issue
Price
Exercise
price of
option
Vesting date
Expiry date of
options
02 Dec 2022
1,000,000
Ordinary
NIL
$0.30
29 June 2023
29 June 2026
02 Dec 2022
3,281,250
Ordinary
NIL
$0.30
29 June 2023
29 June 2026
02 Dec 2022
2,500,000
Ordinary
NIL
$0.30
29 June 2023
29 June 2026
01 May 2023
750,000
Ordinary
NIL
$0.30
29 June 2023
29 June 2026
29 Jun 2023
5,000,000
Ordinary
NIL
$0.30
29 June 2023
29 June 2026
29 Jun 2023
6,000,000
Ordinary
NIL
$0.30
29 June 2023
29 June 2026
3 Nov 2023
17,412,504
Ordinary
$0.005
$0.30
3 Nov 2023
29 June 2026
27 Nov 2023
2,500,000
Ordinary
NIL
$0.30
27 Nov 2023
29 June 2026
Grant date
2-Dec-22
2-Dec-22
12-May-23
12-May-23
12-May-23
Number of
Performance Rights
700,002
699,993
700,000
700,000
700,000
Class of
Performance Rights
Class B Vendor
Class C Vendor
Class A-MD
Class B-MD
Class C-MD
Vesting date
29 June 2023
29 June 2023
29 June 2023
29 June 2023
29 June 2023
Expiry date of
Performance Rights
29 Sept 2025
29 Sept 2027
29 Sept 2025
29 Mar 2025
29 Sept 2025
The performance rights vest on the date that the performance milestone relating to each class has been
satisfied.
No other options over unissued shares or interests in the Company were granted during or since the end of
the period.
Each Performance Right is a right of the holder to acquire one fully paid ordinary share in the capital of the
Company subject to the below terms and conditions:
17
Australian Critical Minerals Limited
NOTE 9: RESERVES (Cont’d)
Class of
Performance
Rights
Number of
Performance
Rights to be
issued
Class B Vendor
700,002
Class C Vendor
699,993
Class A-MD
700,000
Class B-MD
700,000
Class C-MD
700,000
Total
3,499,995
Milestone
Vesting upon completion of a
scoping study in respect of kaolin
production at one or more of the
Projects that represents a >30%
IRR and >200tpa production over
15 years.
Vesting upon grant of a mining
lease in respect of one or more
of the Projects for kaolin.
Vesting upon reporting of
exploration results from a cut
channel or drilling of at least 10m
at no less than 1% Li2O
Equivalent (where "Li2O
Equivalent” metals include Li, Ta,
Ce and Sn)
Vesting upon reporting of 3
drilling intersections of at least
15m at 1% TREO on the Rankin
Dome Project.
Vesting upon reporting a JORC
compliant inferred mineral
resource of 100,000,000 tonnes
Fe
at the Shaw or Cooletha Projects
at a cut-off grade of >58% Fe.
Probability
of
Achievement
Milestone
Satisfaction
Date
Expiry
Date
0%
29 June 2025
29 Sept
2025
0%
29 June 2027
29 Sept
2027
1%
29 June 2025
29 Sept
2025
0%
29 Dec 2024
29 Mar
2025
5%
29 June 2025
29 Sept
2025
NOTE 10: SHARE-BASED PAYMENTS
Recognised in profit and loss (Issue of shares and options) (i)
Recognised in equity (capital raising costs)
Gross share-based payments
(i)
31-Dec-24
$
(91,000)
(91,000)
31-Dec-23
$
132,500
132,500
Management estimates that the performance milestone for B-MD performance rights is not likely
to be achieved, therefore, the value of the share-based payment was reversed during the period.
18
Australian Critical Minerals Limited
NOTE 11: COMMITMENTS AND CONTINGENT LIABILITIES
The directors are not aware of any contingencies at the reporting date.
NOTE 12: COMMITMENTS FOR EXPLORATION
There have been no significant changes in the commitments since 30 June 2024.
NOTE 13: EVENTS SUBSEQUENT TO REPORTING DATE
In January 2025, the Company formally withdrew its interest in exploration licence E77/2768, effectively
terminating all further obligations under the Farm-In Agreement with Kula Gold Limited.
There has been no other matter or circumstance which has arisen since 31 December 2024 that has
significantly affected or may significantly affect:
(a)
the operations, in half-year subsequent to 31 December 2024, of the Group, or
(b)
the results of those operations, or
(c)
the state of affairs, in half-year subsequent to 31 December 2024, of the Group
19
Australian Critical Minerals Limited
In the Directors’ opinion:
(a)
the attached financial statements and notes thereto comply with the Corporations Act 2001, including
compliance with accounting standard AASB 134 ‘Interim Financial Reporting’, the Corporations
Regulations 2001 and other mandatory professional reporting requirements;
(b)
the attached financial statements and notes thereto give a true and fair view of the Group’s financial
position as at 31 December 2024 and of its performance for the half-year ended on that date;
(c)
there are reasonable grounds to believe that the Group will be able to pay its debts as and when they
become due and payable; and
(d)
the attached financial statements and notes thereto are in accordance with International Financial
Reporting Standards issued by the International Accounting Standards Board.
Signed in accordance with a resolution of directors made pursuant to section 295(5)(a) of the Corporations
Act 2001.
On behalf of the directors
Dean De Largie
Managing Director
14 March 2025
Perth, Western Australia
20
INDEPENDENT AUDITOR’S REVIEW REPORT
TO THE MEMBERS OF AUSTRALIAN CRITICAL MINERALS LIMITED
Conclusion
We have reviewed t