Updated Cooletha Lithium and Rankin Dome Drilling
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
27 September 2023
Cooletha Lithium Project Sampling and Rankin Dome
Drilling Update
Australian Critical Minerals (ASX:ACM, “Australian Critical Minerals” or “the Company”) provides an update
to its announcement released 26 September 2023 “Cooletha Lithium Project Sampling and Rankin Dome Drilling
Update”. Updates include;
-
Additional disclosure added to figure 7 – Billy Creek Pegmatite Specimens under ultra violet light (refer
page 8 bold section); and
-
Addition of JORC table.
This release has been approved by the Board of Australian Critical Minerals Limited.
For further information, please contact:
Dean de Largie
Managing Director
Australian Critical Minerals Limited
E info@auscriticalminerals.com.au
T +61 (8) 6165 8858
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 1 of 1
ASX ANNOUNCEMENT
26 September 2023
Cooletha Lithium Project Sampling and Rankin Dome
Drilling Update
Highlights
Cooletha:
•
Phase 1 sampling at Cooletha completed with 251 rock samples collected
•
One quarter of the granted tenure was investigated with the remainder to be accessed in coming months
•
Four priority areas identified by the consulting geologist as having fractionation textures and
spodumene.
•
Individual pegmatites present as dykes and sills
•
Pegmatite sills have an extent of up to 40m wide and 400m long
•
Billy Creek Pegmatites observed to dip into and below the basal unconformity of the Fortescue Group
which substantially increases the available lithium pegmatite target size
•
Reverse circulation drilling planned to test this new potentially substantial target
•
Manganese rich shales 30cm to 1m thick identified near the base of the extensive Fortescue Group in
Eastern Cooletha
Rankin Dome:
•
Shallow Auger sampling program completed with 249 holes
•
900m Reverse Circulation Drilling currently in progress
•
Auger samples submitted to laboratory with results pending
Australian Critical Minerals (ASX:ACM, “Australian Critical Minerals” or “the Company”) is pleased to
announce that Phase 1 sampling of Cooletha has been completed with approximately 65 km2 covered. A higher
definition shallow auger program was completed at Rankin Dome which was followed by a 900m Reverse-circulation
drill program of 6 x 150m deep drillholes,
Managing Director, Dean de Largie said,
“We are pleased to update our shareholders of the encouraging observations from the Cooletha Project. Our
field investigations have increased the potential area of prospectivity for lithium pegmatites, identified four
prospects described as having large pavements of pegmatites and identified shale-hosted manganese.
Whilst lithium exploration will remain our priority, the addition of manganese to our portfolio of green energy
commodities will be received well by our shareholders. As foreshadowed previously, Rankin Dome has
progressed further with additional shallow auger sampling completed and RC drilling currently in progress.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 1 of 13
Cooletha Lithium Project, Pilbara
The Cooletha Lithium Project, ACM’s flagship lithium project, has over 100km2 of lithium prospectivity with
outcropping pegmatite swarms in the Pilbara lithium district. The Project is located south of significant discoveries at
Pilbara Minerals’ (ASX:PLS) Pilgangoora Lithium Project (223Mt @ 1.25% Li2O), MinRes’ (ASX:MIN) Wodgina
Lithium Project (259Mt @ 1.17% Li2O), and Global Lithium Resources’ (ASX:GL1) Archer Lithium Deposit at Marble
Bar (18Mt @ 1% L2iO) (Figure 1).
The Cooletha project also sits 30km south of the Tambourah Lithium Project owned by Trek Metals (ASX:TKM), which
has commenced its maiden 3,800m drill campaign following up on rock chip results up to 3.02% Li2O.
Figure 1 – The location of the Cooletha Lithium Project in the Pilbara region, Western Australia.
To date, Australian Critical Minerals has identified four areas named Bloodwood, Echo Valley, Burnt Ridge and Billy
Creek as priority future work areas.
The mapping and sampling program amassed 251 rock samples which have
been delivered to Labwest for analysis.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 2 of 13
Figure 2 – Four lithium pegmatite prospects have been identified as priority areas during recent sampling at
Cooletha.
The pegmatites occur as dykes and broad pavements striking for several hundred metres and often with substantial
widths (Figure 3). The pegmatites are hosted in the Tambourah Monzogranite which is a large domal batholith and
part of the Split Rock Supersuite which regionally hosts lithium and tantalum bearing pegmatites.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 3 of 13
Figure 3 Geology mapping at Cooletha showing several pegmatite priority areas.
The pegmatites sampled consisted of coarse to very coarse grained orthoclase-albite-quartz-biotite rich crystalline
rocks within Tambourah Monzogranite (TMG). Some sampling of the basal Fortescue Group sedimentary rocks
was also carried out together with sampling of amphibolite rafts within the TMG. The pegmatite samples mainly
consisted of coarse to very coarse (up to 50cm size) crystalline orthoclase-quartz rich rocks often with graphic
textures which indicate that fractionation processes have been at play. Unconformably overlying the TMG are
basal units of the Fortescue Group: The unconformity between the TMG and the basal Tumbiana Formation of the
Fortescue Group is an irregular surface marked by ridges of pegmatitic TMG south of Redmont and in the Billy Ck
area SW of Redmont the upper level of the TMG is calcretised and boulders of pegmatite occur within the basal
Fortescue Group conglomerate (Figure 4).
Pegmatite morphology occurs as dykes and sills with sills occasionally presenting as extensive pavements. This
style is common on the western side of Cooletha (Figure 5).
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 4 of 13
Figure 4 - Graded bedding from cobbles to sandstone observed in boulder south of Redmont
Figure 5 – Billy Creek Pegmatite pavement
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 5 of 13
The observation that the pegmatite sills at Billy Creek dip below the Fortescue Group indicates that the lithium
pegmatite target may be larger than originally postulated. (Figure 6).
Figure 6 – Thick Billy Creek pegmatite sills (left side of photo) dip beneath the Fortescue Group rocks
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 6 of 13
Figure 7 – Billy Creek Pegmatite specimens under Ultra Violet light. The glowing pink is interpreted to be
spodumene (to be confirmed by assay analysis)
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 7 of 13
In relation to the pegmatite specimens in figure 7 the upper photo is sample No CR205 and was described
in the field as orthoclase-quartz graphic textured pegmatite outcrop 20m below the basal Fortescue
Group contact. The lower photo is sample NoCR230 and field described as orthoclase-quartz pegmatite
outcrop with strong N/S fabric. Field description are qualitative and named in order of relative abundance.
Precise abundances were not measured as at this stage of exploration the task is to identify fertile
pegmatite areas for more detailed investigation.
The Company expects the assay results from the collected rock chip samples in four weeks but may take
up to six weeks.
Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory
analyses where concentrations or grades are the factor of principal economic interest. Visual estimates
also potentially provide no information regarding impurities or deleterious physical properties relevant to
valuations.
Figure 8 – Pegmatite sills and irregular bodies at Bloodwood.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 8 of 13
Figure 9 - Amphibolite raft within the Tambourah monzogranite at Billy Hill with the Fortescue Group in
the background
Figure 10 – Manganiferous shale sample eastern Cooletha
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 9 of 13
Rankin Dome Project, Yilgarn
A 249 hole shallow auger soil program has completed at Rankin Dome (Figure 11). The auger program was
performed on a 100m x 100m grid over the northwestern portion of the REE anomaly previously reported. The
program will better define the REE anomaly geometry and provide improved orientation information to guide future
drilling. Sampling was standardised across the region with the interval 1m to 2m being sampled. This is anticipated
to provide a more robust geological interpretation when assays are received.
The area covered by the grid has scant outcrop and thus lacks bedrock depth information. The grid program
included 1 in 10 holes drilled to refusal to gain further information including bedrock depth.
Figure 11 – 100m gridded shallow auger at Rankin Dome
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 10 of 13
Strongly anomalous results from the work performed by Kula Gold (ASX: KGD) was on sample lines of various
orientations. To reduce interpretation bias resulting from the various sample line orientations ACM increased
sample density and used the 100m by 100m grid. Auger samples have been submitted and assays are awaited.
A 900m RC drill program is currently in progress on the NW section of Rankin Dome. Bedrock is close to surface
at this location. The RC drilling will test areas of REE anomalism in soils (Figure 12).
Figure 12 – RC Drillhole collar locations Rankin Dome
This release has been approved by the Board of Australian Critical Minerals Limited.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 11 of 13
For further information, please contact:
Dean de Largie
Managing Director
Ben Creagh
Investor and Media Relations
Australian Critical Minerals Limited
E info@auscriticalminerals.com.au
T +61 (8) 6165 8858
NWR Communications
E benc@nwrcommunications.com.au
T +61 417 464 233
About Australian Critical Minerals
Australian Critical Minerals is an exploration company focused on developing a quality portfolio of critical
minerals projects in Western Australia. The key projects are Cooletha (Pilbara) Lithium Project and Rankin Dome
(Southern Cross) Rare Earth Project.
Battery metals, including rare earths and lithium are fundamental in the clean energy transition to net zero
transmissions. ACM intends to play a pivotal role in delivering the processed minerals needed for a clean energy
future.
ACM has established a highly experienced management team with a proven track record of exploration and
corporate success in the mining industry.
Reference to Previous Announcements
Investors can refer to the Company’s Prospectus for further disclosure on information in this Announcement and all of the
Company’s Projects. Investors should also refer to the Company’s release 28 August 2023 “Cooletha Exploration Update” for
more information on the pegmatite outcrops (and relevant samples).
Competent Persons Statement
The information in this report that relates to Exploration Targets and Exploration Results is based on information compiled by
Mr. Dean de Largie. Mr. de Largie is the Managing Director of Australian Critical Minerals Limited and is a Fellow of the Australian
Institute of Geoscientists and has sufficient experience relevant to the styles of mineralisation under consideration and to the
activity being reported to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves. Mr. de Largie have verified the data disclosed in this release and
consent to the inclusion in this release of the matters based on the information in the form and context in which it appears.
Forward Statement
This news release contains “forward-looking information” within the meaning of applicable securities laws. Generally, any
statements that are not historical facts may contain forward-looking information, and forward looking information can be identified
by the use of forward-looking terminology such as “plans”, “expects” or “does not expect”, “is expected”, “budget” “scheduled”,
“estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases
or indicates that certain actions, events or results “may”, “could”, “would”, “might” or “will be” taken, “occur” or “be achieved.”
Forward-looking information is based on certain factors and assumptions management believes to be reasonable at the time
such statements are made, including but not limited to, continued exploration activities, commodity prices, the estimation of initial
and sustaining capital requirements, the estimation of labour costs, the estimation of mineral reserves and resources,
assumptions with respect to currency fluctuations, the timing and amount of future exploration and development expenditures,
receipt of required regulatory approvals, the availability of necessary financing for the project, permitting and such other
assumptions and factors as set out herein.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 12 of 13
Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual
results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied
by such forward-looking information, including but not limited to: risks related to changes in commodity prices; sources and cost
of power and water for the Project; the estimation of initial capital requirements; the lack of historical operations; the estimation
of labour costs; general global markets and economic conditions; risks associated with exploration of mineral deposits; the
estimation of initial targeted mineral resource tonnage and grade for the project; risks associated with uninsurable risks arising
during the course of exploration; risks associated with currency fluctuations; environmental risks; competition faced in securing
experienced personnel; access to adequate infrastructure to support exploration activities; risks associated with changes in the
mining regulatory regime governing the Company and the Project; completion of the environmental assessment process; risks
related to regulatory and permitting delays; risks related to potential conflicts of interest; the reliance on key personnel; financing,
capitalisation and liquidity risks including the risk that the financing necessary to fund continued exploration and development
activities at the project may not be available on satisfactory terms, or at all; the risk of potential dilution through the issuance of
additional common shares of the Company; the risk of litigation.
Although the Company has attempted to identify important factors that cause results not to be as anticipated, estimated or
intended, there can be no assurance that such forward-looking information will prove to be accurate, as actual results and future
events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance
on forward-looking information. Forward looking information is made as of the date of this announcement and the Company
does not undertake to update or revise any forward-looking information this is included herein, except in accordance with
applicable securities laws.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 13 of 13
JORC Code, 2012 Edition – Table 1 report template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg
cut channels, random chips, or
specific specialised industry
standard measurement tools
appropriate to the minerals under
investigation, such as down hole
gamma sondes, or handheld XRF
instruments, etc). These examples
should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures
taken to ensure sample
representivity and the appropriate
calibration of any measurement
tools or systems used.
• Aspects of the determination of
mineralisation that are Material to
the Public Report.
• In cases where ‘industry standard’
work has been done this would be
relatively simple (eg ‘reverse
circulation drilling was used to
obtain 1 m samples from which 3
kg was pulverised to produce a 30
g charge for fire assay’). In other
cases more explanation may be
required, such as where there is
coarse gold that has inherent
sampling problems. Unusual
commodities or mineralisation types
(eg submarine nodules) may
warrant disclosure of detailed
information.
• Drill type (eg core, reverse
circulation, open-hole hammer,
rotary air blast, auger, Bangka,
sonic, etc) and details (eg core
diameter, triple or standard tube,
depth of diamond tails, facesampling bit or other type, whether
core is oriented and if so, by what
method, etc).
• Rock sample are taken by hammer
and chisel of rock outcrop.
Samples were localized and care
was taken to achieve a
representative sample of each site.
Samples were placed in a
numbered calico sample bag.
Secured in Polyweave sacks and
delivered for assay by ACM
personnel.
• Method of recording and assessing
core and chip sample recoveries
and results assessed.
• Measures taken to maximise
sample recovery and ensure
representative nature of the
• Sample recovery was 100% and
representative. No assays have
been reported in this press release.
Drilling
techniques
Drill sample
recovery
1
• Reverse Circulation drilling used a
4½” diameter“ RC hammer with a
5½ “drillbit performed by Stark
Drilling
• Auger drilling used a 4” diameter
soil auger and performed by
Sahara Sahara Operations
Australia custom equipment for
open auger drilling
Criteria
Logging
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
JORC Code explanation
Commentary
samples.
• Whether a relationship exists
between sample recovery and
grade and whether sample bias
may have occurred due to
preferential loss/gain of fine/coarse
material.
• Whether core and chip samples
have been geologically and
geotechnically logged to a level of
detail to support appropriate
Mineral Resource estimation,
mining studies and metallurgical
studies.
• Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of
the relevant intersections logged.
• If core, whether cut or sawn and
whether quarter, half or all core
taken.
• If non-core, whether riffled, tube
sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted
for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the
sampling is representative of the in
situ material collected, including for
instance results for field
duplicate/second-half sampling.
• Whether sample sizes are
appropriate to the grain size of the
material being sampled.
• The nature, quality and
appropriateness of the assaying
and laboratory procedures used
and whether the technique is
considered partial or total.
• For geophysical tools,
spectrometers, handheld XRF
instruments, etc, the parameters
used in determining the analysis
including instrument make and
model, reading times, calibrations
factors applied and their derivation,
etc.
• Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory
checks) and whether acceptable
levels of accuracy (ie lack of bias)
and precision have been
established.
2
• Rock chip samples and soil
samples have been, and, are being
logged in the field at the time the
samples have been collected by an
appropriately experienced
geologist. Logging is qualitative.
• UV light fluorescence in Figure 7 is
qualiatative and although indicative
of spodumene, lithium
concentration is to be confirmed by
assay. Results are pending.
• RC samples are being collected on
1-meter intervals through an RC
cyclone.
• Duplicates were taken of all 1m
intervals for future requirements.
• No assays have been reported
Criteria
JORC Code explanation
Commentary
Verification
of sampling
and
assaying
• No assays have been reported
Sample
security
• The verification of significant
intersections by either independent
or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data,
data entry procedures, data
verification, data storage (physical
and electronic) protocols.
• Discuss any adjustment to assay
data.
• Accuracy and quality of surveys
used to locate drill holes (collar and
down-hole surveys), trenches, mine
workings and other locations used
in Mineral Resource estimation.
• Specification of the grid system
used.
• Quality and adequacy of
topographic control.
• Data spacing for reporting of
Exploration Results.
• Whether the data spacing and
distribution is sufficient to establish
the degree of geological and grade
continuity appropriate for the
Mineral Resource and Ore Reserve
estimation procedure(s) and
classifications applied.
• Whether sample compositing has
been applied.
• Whether the orientation of sampling
achieves unbiased sampling of
possible structures and the extent
to which this is known, considering
the deposit type.
• If the relationship between the
drilling orientation and the
orientation of key mineralised
structures is considered to have
introduced a sampling bias, this
should be assessed and reported if
material.
• The measures taken to ensure
sample security.
Audits or
reviews
• The results of any audits or reviews
of sampling techniques and data.
• No audits or reviews. Stark
industry procedures of drilling and
sampling were used
Location of
data points
Data
spacing
and
distribution
Orientation
of data in
relation to
geological
structure
• Location data was recorded using
UTM coordinates in the GDA94
zone 50 grid
• No mineral resource has been
estimated as current program is at
an early exploration stage
• Where identifiable structures were
apparent, samples were taken
across said structure.
• Samples were secured in cable tied
poly-weave sacks locked in ACM
vehicles or facilities and remained
in ACM custody from site to
delivery to assay laboratory
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
• Type, reference name/number,
location and ownership including
agreements or material issues
• No results have been reported
• Cooletha tenements are owned by
3
Criteria
JORC Code explanation
Commentary
land tenure
status
with third parties such as joint
ventures, partnerships, overriding
royalties, native title interests,
historical sites, wilderness or
national park and environmental
settings.
• The security of the tenure held at
the time of reporting along with
any known impediments to
obtaining a licence to operate in
the area.
• Acknowledgment and appraisal
of exploration by other parties.
an ACM subsidiary Proterozoic
Gold Pty Ltd.
• Rankin Dome Project is a 51%
earn-in agreement with Kula Gold
Ltd ASX:KGD
• No impediments to tenure exist
• Deposit type, geological setting
and style of mineralisation.
• A summary of all information
material to the understanding of
the exploration results including a
tabulation of the following
information for all Material drill
holes:
o easting and northing of the
drill hole collar
o elevation or RL (Reduced
Level – elevation above sea
level in metres) of the drill
hole collar
o dip and azimuth of the hole
o down hole length and
interception depth
o hole length.
• If the exclusion of this information
is justified on the basis that the
information is not Material and
this exclusion does not detract
from the understanding of the
report, the Competent Person
should clearly explain why this is
the case.
• Cooletha Project is prospective
• In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (eg cutting of high
grades) and cut-off grades are
usually Material and should be
stated.
• Where aggregate intercepts
incorporate short lengths of high
grade results and longer lengths
of low grade results, the
procedure used for such
• No results have been reported,in
this press release.
Exploration
done by other
parties
Geology
Drill hole
Information
Data
aggregation
methods
4
• Kula Gold Auger results are
reflected in the figures within this
update and disclosed in the ACM
Prospectus
• Shallow auger sampling (251
locations) and RC drilling collar
locations (6) are identifiable in the
figures within this update.
• RC Drilling is in progress and
therefore no downhole information
is available.
• Tabulated drill collar location,
orientation and downhole data and
assays will be available in
approximately 6 weeks after
submittal of samples to the lab.
This information is currently not
available as RC drilling is in
progress.
• Auger sampling was conducted on
a 100m by 100m grid. Tabulated
data will be provided when assays
are received by the laboratory.
• Not including the tabulated
locations of the gridded shallow
auger sampling program at this
stage does not detract from the
understanding of the update as key
information relating to area of auger
sampling to previous auger results
has been explained in the this
update and the locations of auger
samples identifiable in the
associated figures in this update.
Criteria
JORC Code explanation
•
Relationship
between
mineralisation
widths and
intercept
lengths
•
•
•
Diagrams
•
Balanced
reporting
•
Other
substantive
exploration
data
•
Further work
•
•
Commentary
aggregation should be stated and
some typical examples of such
aggregations should be shown in
detail.
The assumptions used for any
reporting of metal equivalent
values should be clearly stated.
These relationships are
particularly important in the
reporting of Exploration Results.
If the geometry of the
mineralisation with respect to the
drill hole angle is known, its
nature should be reported.
If it is not known and only the
down hole lengths are reported,
there should be a clear statement
to this effect (eg ‘down hole
length, true width not known’).
Appropriate maps and sections
(with scales) and tabulations of
intercepts should be included for
any significant discovery being
reported These should include,
but not be limited to a plan view
of drill hole collar locations and
appropriate sectional views.
Where comprehensive reporting
of all Exploration Results is not
practicable, representative
reporting of both low and high
grades and/or widths should be
practiced to avoid misleading
reporting of Exploration Results.
Other exploration data, if
meaningful and material, should
be reported including (but not
limited to): geological
observations; geophysical survey
results; geochemical survey
results; bulk samples – size and
method of treatment;
metallurgical test results; bulk
density, groundwater,
geotechnical and rock
characteristics; potential
deleterious or contaminating
substances.
The nature and scale of planned
further work (eg tests for lateral
extensions or depth extensions
or large-scale step-out drilling).
Diagrams clearly highlighting the
areas of possible extensions,
including the main geological
interpretations and future drilling
areas, provided this information
is not commercially sensitive.
5
• No downhole data reported and
drilling currently is in progress.
• Appropriate diagrams have been
included in the report reflecting the
work being performed.
• No geochemistry has been reported
• All material information has been
reported in the press release.
Tabulated information will be
provided when assays are
received.
• Further sampling is planned at
Cooletha. Final versions of the
plan will be determined after
assays are received and reviewed.
Share your feedback
Discover