Flint Results Highlight Epithermal and Porphyry Potential
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
ASX ANNOUNCEMENT
9 September 2026
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Assay data confirms Epithermal and Porphyry
Potential at Flint
HIGHLIGHTS
• FL_DDH002 confirms a high-sulphidation epithermal target at Flint, with intense
Advanced Argillic Alteration and elevated Antimony, Arsenic, Tellurium and silver logged
between 0.0–54m
• New porphyry target identified: FL_DDH002 points toward a large-scale Cu-Mo(Au)
porphyry system, with strengthening Propylitic/Phyllic alteration, rising pyrite and low-
level Mo-Cu anomalism from 190–656m signalling proximity to its outer margin
• Two large-scale conductive targets identified in the AMT 3D model, potentially reflecting
a "Lithocap" cap over Porphyry Cu-Au mineralisation at depth in the underexplored
southern project area
• Flint's geophysical and geochemical signature is directly comparable to Andean
porphyry-epithermal systems that have delivered major discoveries, including
BHP/Lundin's Filo del Sol, Atex Resources' Valeriano and Mogotes Metals’ Filo Sur
projects
• A follow-up exploration program is being designed to test the newly identified porphyry
and epithermal targets and define priority drill sites at Flint
Australian Critical Minerals Ltd (ASX:ACM, “ACM” or “the Company”) is pleased to
provide an update on assay results specifically from drill hole FL_DDH002, and new
interpretation of the prospectivity of the project arising from the Phase 1 diamond drilling
program at the Flint Project in Peru.
The recently completed Phase 1, four-hole diamond drilling program totalled 1,773.3 metres
(Table 1, Appendix 2) and was designed to test resistivity anomalies beneath a quartz-alunite,
advanced argillic alteration with rock geochemical anomalies in the northern area of the
project, where historic mapping and rock chip sampling had been previously focused
(Figure 1). Hole FL_DDH002 was extended below original target depth to 656.7 m EOH due
to encouraging alteration vectors noted by Company geologists.
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Figure 1: Historic exploration data coverage highlighting the underexplored “Lithocap” and the
Southern High Sulphidation target area
Review of FL_DDH002 geological logging, down hole hyperspectral and assay data (Graphic
log 1: assay results and hyperspectral alteration), confirms that between 0.0 and 54.0m the
hole intercepted Advanced Argillic (AA) alteration with strongly anomalous epithermal
pathfinder elements (As Sb Te Tl) and ppb level Ag (Figure 2).
The AA alteration overlies a strong propylitic alteration that transitions down hole and through
to the EOH at 657.7m, into strong phyllic alteration in excess of 10% pyrite and low level but
anomalous Mo (peak 23 ppm) and Cu in the propylitic to phyllic zone typically 75 to 131 ppm
and localised ppb level Au. The alteration and low level geochemical vectors point to the
potential for near surface high sulphidation epithermal system and newly recognised
potential for deeper concealed porphyry mineralisation at the Flint project.
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Figure 2a: Alteration and Geochemical Model for porphyry and epithermal mineral systems.
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Figure 2b: ACM drill hole FL_DDH002 alteration and down hole Porphyry trace element vector trace
ACM has engaged Geoscience consultants Global Ore Discovery to undertake an integrated
analysis of results from this round of drilling, in conjunction with AMT geophysics and limited
historic rock chip sampling from the southern area of the project.
Initial review has highlighted the potential of two large conductive targets, Lithocap Target 1
(1000 by 500 m) and Lithocap Target 2 (800 by 400 m) (Figure 3) within ACM’s previously
reported (see ASX:ACM announcement dated 4 February 2026) AMT geophysical model.
These targets potentially represent the upper level of large“Lithocap”style alteration centres
that are typically “barren” Cu-Mo-Au at surface but can conceal significant porphyry
mineralisation at depth.
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Application of Porphyry Copper Deposit (PCD) trace element metal ratio analysis is used to
identify geochemical vectors toward concealed epithermal and porphyry mineralisation in
Lithocap settings.
Applying this approach to the Flint data (Figure 2b) shows an anomaly from historic rock chip
over the top of Lithocap Target 1, an additional but lower order anomaly coincident with
Lithocap Target 2 and a vector down hole in FL_DDH002 (Figure 3).
This supports the exploration concept that the Conductive AMT Targets may be metal-poor
alteration Lithocaps to concealed porphyry centres and that FL_DDH002 vectors down hole
toward the east and was potentially drilled in the outer halo of a concealed porphyry system
underlying Lithocap Target 1.
Graphic Log 1: Drill Hole FL_DDH002 geochemical results and hyperspectral alteration mineralogy
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Figure 3: Left Panel - plan view of AMT geophysical conductors – Lithocap Targets. Right Panel grid
of Porphyry Index Grid derived from historic rock chip sample assay.
Exploration by ACM to date has highlighted a larger 4.8 sq km alteration system at Flint,
prospective for porphyry and epithermal mineralisation. In the context of the new
understanding of the prospectivity at Flint, an integrated exploration program is being
designed to deliver a cost-effective, systematic de-risking approach to drill target definition
for the attractive but conceptual Lithocap Targets 1 and 2 and the underexplored Southern
high sulphidation (HSE) target area that remains largely untested by modern systematic
exploration.
Flint Project Next Steps
World View 3 (WV3) satellite alteration mapping of the full alteration system to define higher
temperature alteration centres. Drone magnetic survey of the Lithocap and southern HSE
area to identify covered intrusive centres that may have acted as heat engines and metal
sources to epithermal and porphyry mineralisation. Key areas identified by the WV3 and
magnetics, as well as the existing conductive targets in the ACM AMT geophysics, will be
systematically tested with low detection limit soil and rock chip geochemistry and TerraSpec
alteration analysis. Priority coincident areas of anomalous geochemistry, TerraSpec
alteration, magnetic and AMT conductors will be selectively surveyed with deep penetrating
IP geophysics to refine and optimise drill testing.
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Executive Chairman Dean de Largie said:
“The Phase 1 drilling programme has materially improved ACM’s understanding of the Flint
hydrothermal system. It has strengthened the epithermal model and generated a credible
deeper porphyry-related target concept. Assays from FL_DDH002, together with downhole
hyperspectral data, confirm advanced argillic alteration and associated elevated epithermal
pathfinder elements, including arsenic and antimony, near surface. These results are
consistent with the high-sulphidation epithermal exploration model being evaluated at Flint”.
“At depth, FL_DDH002 intersected increasingly intense phyllic alteration with substantial
pyrite and low-level copper and molybdenum anomalism. These results provide encouraging
geological and geochemical vectors supporting the potential for a concealed porphyry-
related system within the broader Flint alteration footprint”.
“Importantly, the integration of drilling, hyperspectral alteration data, historic rock-chip
geochemistry and ACM’s AMT geophysical model has identified large, underexplored
conductive targets in thesouthern part of theproject. These targets, together with the broader
advanced-argillic alteration system, provide a compelling basis for systematic follow-up work
to derisk and refine targets for future exploration”.
“Flint is located in a prospective northern Peruvian epithermal–porphyry corridor, and the
Company’s next programme is designed to efficiently test the most prospective areas using
detailed alteration mapping, geochemistry, magnetics and targeted geophysics before
selecting priority drill targets.”
This release has been approved by the Board of Australian Critical Minerals Limited.
For further information, please contact:
Dean de Largie
Executive Chairman
Australian Critical Minerals Limited
E info@auscriticalminerals.com.au
T +61 (8) 6165 8858
About Flint
Flint is located within a prolific epithermal-porphyry corridor in northern Peru and lies approximately 60km
from the La Arena epithermal Au-Ag and porphyry Cu-Au system. The Project incorporates a substantial
inherited exploration database, including surface geochemistry, alteration mapping, historical induced
polarisation and magnetic datasets, which ACM has integrated with its more recent work to define drill
targets across the broader hydrothermal corridor.
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
ABOUT US
Australian Critical Minerals (ASX:ACM) is a resource exploration company focused on developing a high-
grade portfolio of gold, silver, copper and critical mineral projects, with a core focus on Peru.
In 2025, ACM acquired a suite of highly prospective Peruvian assets spanning over 25,000 hectares. These
assets are strategically positioned to supply the critical metals driving global electrification, clean energy,
and industrial growth.
ACM also holds iron ore projects in Western Australia’s Pilbara region, offering long-term exposure to
bulk commodity demand.
Backed by an experienced team with proven exploration and corporate success, ACM is unlocking value
across some of the world’s most richly endowed mineral belts.
Competent Persons Statement
The information in this report related to Exploration Results is based on information compiled by Mr Dean
de Largie. Mr de Largie is the Executive Chairman of Australian Critical Minerals Limited and is a Fellow of
the Australian Institute of Geoscientists and has sufficient experience relevant to the styles of
mineralisation under consideration and to the activity being reported to qualify as a Competent Person as
defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves. Mr. de Largie has verified the data disclosed in this release and consented to including
the matters based on the information in the form and context in which it appears.
Forward Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not
limited to, statements concerning Australian Critical Minerals Limited’s planned exploration program and
other statements that are not historical facts. When used in this document, words such as "could," "plan,"
"expect," "intend," "may”, "potential," "should," and similar expressions are forward-looking statements.
Although ACM believes that its expectations reflected in these forward- looking statements are reasonable,
such statements involve risks and uncertainties and no assurance can be given that further exploration
activities will result in the actual values, results or events expressed or implied in this document.
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Appendix 1
JORC CODE 2012 EDITION, TABLE 1
Section 1. Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques Nature and quality of sampling (e.g., cut
channels, random chips, or specific specialised
industry standard measurement tools appropriate
to the minerals under investigation, such as down
hole gamma sondes, or handheld XRF
instruments, etc). These examples should not be
taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure
sample representativity and the appropriate
calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation
that are Material to the Public Report.
In cases where ‘industry standard’ work has been
done this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In
other cases, more explanation may be required,
such as where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types
(eg submarine nodules) may warrant disclosure
of detailed information.
Diamond Drilling
• HQ sized Diamond Core drilling.
• Samples collected using ½ core at ~2m
intervals through intervals of potentially
prospective alteration and veining.
• Samples were sent to ALS Laboratories in
Lima where they are logged, crushed,
pulverised and then analysed by fire
assay (30g) with an atomic absorption
spectroscopy (AAS) finish for gold (ALS
code: Au-AA-23); and four acid digestion
(0.25 grams) with a combined Inductively
Coupled Plasma-Atomic Emission
Spectroscopy (ICP-AES) and Inductively
Coupled Plasma-Mass Spectrometry
(ICP-MS) finish (ALS code: ME-MS61).
Drilling
techniques Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is
oriented and if so, by what method, etc).
• HQ Diamond Core Drilling, oriented and down-
hole surveyed with a gyro.
Drill sample
recovery Method of recording and assessing core and chip
sample recoveries and results assessed.
Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential loss/gain
of fine/coarse material.
• Core recovery is measured at the drill site by
measuring the length of drill core recovered
against the advance length of the drill string.
• Core recovery was generally between 90%
and 100% with the average for FL_DDH002
being 96.9%.
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Criteria JORC Code explanation Commentary
Logging
Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the relevant
intersections logged.
• Core logging on site is qualitative and
quantitative with regards to sulphides.
• Logging is being completed to a level of detail
that will support any future Mineral Resource
estimation, mining studies and metallurgical
studies. All drill core is being photographed on
site prior to transport.
• Drill core is being logged with advanced multi-
sensor scanning at Xcout’s facility in Lima
using the ANCORELOG scanning system
developed by the DMT group in Germany.
ANCORELOG is a multi-sensor analytical core
logging platform that combines continuous
hyperspectral imaging and high-resolution
imaging to measure the mineralogical and
textural properties of drill core.
Sub-
sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether quarter,
half or all core taken.
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
For all sample types, the nature, quality, and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the
grain size of the material being sampled.
• Drill core is halved longitudinally using a
diamond core saw. The sampled half core is
cut longitudinally again using a diamond core
saw into quarter for duplicate samples.
• The same side of the drill core is always
sampled.
• Drill core samples are interpreted to be the
highest quality and most
appropriate/representative sampling technique
due to the relatively continuous rock sample
(not homogenised), excellent recovery and the
ability to maintain half core samples for later
verification/reanalysis purposes.
• QA/QC protocols including sample duplicates,
blanks and certified reference (standards)
samples appropriate for the mineralisation
style will be utilised at the sampling stage.
QA/QC insertion rate was approximately 1
standard, blank and duplicate at least every 50
routine samples.
Quality of
Assay data
and
laboratory
tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used
in determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures adopted
(eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable levels
• Samples were sent to ALS Laboratories in
Lima where they are logged, crushed,
pulverised and then analysed by fire assay
(30g) with an atomic absorption
spectroscopy (AAS) finish for gold (ALS
code: Au-AA-23); and four acid digestion
(0.25 grams) with a combined Inductively
Coupled Plasma-Atomic Emission
Spectroscopy (ICP-AES) and Inductively
Coupled Plasma-Mass Spectrometry (ICP-
MS) finish (ALS code: ME-MS61).
• This is considered an industry standard
analysis suite for this style of mineralisation.
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Criteria JORC Code explanation Commentary
of accuracy (ie lack of bias) and precision have
been established.
• ALS Laboratory in Lima is an ISO certified
commercial laboratory.
• ME-MS61 is considered a near total
digestion technique.
• ALS quality control procedures include the
use of blanks, duplicates and certified
reference material (CRMs or often referred to
as Standards).
• Analysis of assay results from ACM’s and
ALS Laboratory QA/QC samples indicate the
assay data is of acceptable accuracy and
precision.
Verification
of sampling
and
assaying
The verification of significant intersections by
either independent or alternative company
personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, and data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
• Significant intervals of alteration mineralogy
were logged by onsite geologists and then
logged using hyperspectral scanning.
• As you would expect, this alteration spatially
coincides well with the geochemical
anomalism reported in this release.
• This is a phase 1 drill program and no holes
were twinned.
• No adjustments were made to assay data.
Location of
data points Accuracy and quality of surveys used
to locate drill holes (collar and down- hole
surveys), trenches, mine workings and other
locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
• Drill collar locations have been measured with
handheld GPS to collect position information in
the WGS84 zone 17 South Datum.
• Handheld GPS devices commonly have an
elevation accuracy of +10metres. Therefore,
elevation of each drill hole has been better
estimated using topographic data.
• Elevation data is adequate for this early stage
of exploration.
Data
spacing and
distribution
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
Whether sample compositing has been applied.
• Drilling is spaced at between 300 and 400
metres along strike.
• More work needs to be done in order to
understand if this spacing is sufficient
to establish the degree of geological and grade
continuity appropriate for Mineral Resource
and Ore Reserve estimation
• No Mineral Resource and Ore Reserve
estimation is reported in this news release.
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
If the relationship between the drilling orientation
and the orientation of key mineralised
• Drill hole orientation is approximately
perpendicular to the perceived geological
structure and orientation of the hydrothermal
system.
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Criteria JORC Code explanation Commentary
structures is considered to have introduced a
sampling bias, this should be assessed and
reported if material.
Sample
security The measures taken to ensure sample security. • Drill core tray covers are individually secured
to each drill core tray. Drill core trays are
secured to pallets and the palleted trays are
fully covered with plastic.
• Core is photographed on site and then on
delivery to the core scanning and cutting
facility in Lima.
• Samples are hand delivered to the ALS
laboratory in Lima by field staff.
Audits or
reviews The results of any audits or reviews of sampling
techniques and data.
• No audits or reviews of sampling techniques
and data have been completed due to the
early stage of exploration.
Section 2. Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status
Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a licence
to operate in the area.
• Flint has 3 licences. Gaya 103 is held by
Pegoco SAC which is a 100% owned
subsidiary of ACM. El Perseverante and
Cerro Pedernal are held through a 100%
option to purchase by Latin Gold SAC.
• Tenure is in good standing.
• There are no native title interests
Exploration done by
other parties Acknowledgment and appraisal of
exploration by other parties.
• Southern Rock Geophysics modelled the
NSAMT data and remodelled the
historical IP data.
Geology
Deposit type, geological setting, and style
of mineralisation.
• Flint is regarded as a high-sulphidation
epithermal system overprinting a porphyritic
hydrothermal system.
• The volcanic host rock has not been
formally dated, however it is interpreted to
be of approximately Miocene age.
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Criteria JORC Code explanation Commentary
Drill
hole Information A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes: easting and northing of the drill
hole collar elevation or RL, dip and
azimuth of the hole, down hole length
and interception depth, hole length. If
the exclusion of this information is
justified on the basis that the
information is not Material and this
exclusion does not detract from the
understanding of the report, the
Competent Person should clearly
explain why this is the case.
• Drill hole collar details are provided in the
Appendix 2 of the announcement (Table
1).
• Details of intervals interpreted to be
geochemically significant are provided in
Graphic Log 1 in the body of this
Announcement and also detailed in
Appendix 2 (Table 2).
Data aggregation
methods In reporting Exploration Results, weighting
averaging techniques, maximum
and/or minimum grade truncations
(eg cutting of high grades) and cut-off
grades are usually Material and should
be stated.
Where aggregate intercepts incorporate
short lengths of high-grade results and
longer lengths of low-grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
The assumptions used for any reporting of
metal equivalent values should be
clearly stated.
• No economic assay intervals are included
in this release.
• Only intervals of anomalous pathfinder
elements reported and detailed in Table
2.
• Drillcore was sampled on 2m intervals.
Relationship
between
mineralisation,
widths and intercept
lengths
These relationships are particularly
important in the reporting of Exploration
Results.
If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
If it is not known and only the down hole
lengths are reported, there should be a
clear statement to this effect (e.g., down
hole length, true width not known’).
Appropriate maps and sections
• Drill hole angles are between 60 and 72
degrees.
• Assay results of anomalous pathfinder
elements in Table 2 are downhole depths.
• Geometry of any mineralisation is
undetermined at this stage.
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Criteria JORC Code explanation Commentary
Diagrams
Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These
should include, but not be limited to a plan
view of drill hole collar locations
and appropriate sectional views.
• A drill hole plan map and cross-section of
FL_DDH002 is provided in the body of the
announcement (Figure 2 and 3).
Balanced Reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
• No economic grade intervals have been
announced in this report.
Other substantive
exploration data Other exploration data, if meaningful and
material, should be reported, including
(but not limited to): geological
observations; geophysical survey results;
geochemical survey results; bulk samples
– size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
Porphyry Index (MPIx_L) gridding and
interpretation:
• The MDRU Porphyry Index–Lateral
(“MPIx_L”) was calculated for each rock-
chip sample using whole-rock multi-
element geochemical assay results. The
index is a ratio designed to assess
relative lateral geochemical position
within advanced-argillic alteration and
lithocap environments above, or
peripheral to, porphyry systems:
• MPIx_L=(5×Sb)+(20×Tl)+As/(Zn/10)+(M
n/50)
• Antimony (Sb), thallium (Tl) and arsenic
(As) comprise the numerator because
they are characteristically enriched in
shallow, lithocap and epithermal portions
of porphyry systems. Zinc (Zn) and
manganese (Mn) comprise the
denominator because they are generally
more laterally dispersed and may be
relatively enriched in more distal settings.
Element weighting factors normalise the
relative contribution of individual
elements to the ratio.
• The MPIx_L calculation produces a
relative exploration vector only; it is not a
measure of copper, gold, lithium or other
metal grade, and does not demonstrate
the presence, depth, size or economic
significance of a porphyry deposit.
Elevated values are interpreted as
indicating areas with a relatively stronger
shallow porphyry/lithocap geochemical
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Criteria JORC Code explanation Commentary
signature, subject to geological context,
alteration type, sample medium,
analytical detection limits and spatial
distribution of samples.
• MPIx_L values were assigned to their
respective sample locations and
interpolated/gridded. The resulting grid
was contoured to identify coherent
relative highs. Areas where elevated
MPIx_L responses coincide with rock-
chip geochemical anomalies and AMT
conductivity anomalies were considered
higher-priority targets for follow-up
exploration.
• The index was applied as a
reconnaissance-scale targeting tool and
is intended to be evaluated with
geological mapping, alteration
mineralogy, structural interpretation,
geophysical data and, u
Share your feedback
Discover