Lithium Prospectivity Continues at Cooletha
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
01 March 2024
Lithium Prospectivity Continues at Cooletha
Highlights
Cooletha:
•
Rock sampling reconnaissance and field checking of twelve multi-spectral targets completed at
Cooletha Project further develop the scale potential of the Cooletha Pegmatite Fields (CPFs).
•
Results from 169 rock samples collected in a second rock chip sampling program have enhanced
geological understanding.
•
Geological exploration model developing with newly recognised pegmatites identified at surface.
•
Favourable regional-scale geological settings conducive to hosting lithium pegmatites identified.
•
Systematic soil sampling planned on a regional scale (1 km x 0.5 km grid) across the Goldilocks Zone.
•
Follow-up in-fill soils targeting regional soil anomalies and subdued topography between silica ridges.
Australian Critical Minerals (ASX: ACM, “Australian Critical Minerals” or “the Company”) is pleased to
advise a second rock chip sampling program has been completed at the Cooletha Lithium Project in
Western Australia.
Managing Director, Dean de Largie said:
“The team endured the intense heat in the Pilbara in January to complete a second round of
rock chip sampling at our Cooletha Project. The observations from the sampling program
continue to provide further information to support the geological exploration model being
developed at Cooletha.
The model we have developed indicates that within ACM’s Cooletha project the subdued
topography between outcropping silica ridges represents the weathered inner zones of
pegmatite intrusions. These zones have been identified over several prospective areas,
including reconnaissance targets identified from previous integrated multispectral targeting
analysis. These localised subdued areas have encouraging geological characteristics
including pegmatitic material within muscovite-rich soils. These pegmatitic soils will form
one of the targets of the next phase of work at Cooletha.”
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 1 of 20
Rock Sampling and Reconnaissance Program
The Cooletha Project, ACM’s flagship lithium project, has over 100km2 of lithium prospectivity in the Pilbara lithium
district. The Project is located south of significant discoveries at Pilbara Minerals’ (ASX:PLS) Pilgangoora Lithium
Project (223Mt @ 1.25% Li2O) and MinRes’ (ASX:MIN) Wodgina Lithium Project (259Mt @ 1.17% Li2O) (Figure 1).
Figure 1 – The location of the Cooletha Lithium Project in the Pilbara region, Western Australia.
ACM’s team of three geologists and a field assistant undertook field exploration activity at the Cooletha Project from
8-13 January 2023. The team was based out of the Auski Roadhouse and travelled to the project area using a
helicopter, which allowed the team to visit remote areas with limited vehicle access. The team was also supported
by two light vehicles stationed at a central point in the project area, where preliminary analysis of the samples was
conducted using PXRF and LIBS. Instruments.
The 2024 rock chip sampling program collected a total of 169 rock samples and confirmed the presence of several
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 2 of 20
pegmatite fields. These newly recognised pegmatite fields are located in and adjacent to areas identified by the
recent Cooletha Integrated Multispectral Interpretation study.
The geochemistry of these most recent rock chip samples will be investigated by a thorough geochemical analysis,
looking at the fertility and fractionation of the sampled pegmatites.
Figure 2 shows the distribution of pegmatites identified in the 2024 rock chip program and the sample locations
from ACM’s 2023 rock chip program. Geological and geomorphological similarities between ACM’s Cooletha
Pegmatite Fields (CPF) and other advanced, fertile (mineralised) pegmatite fields, such as the Bynoe Pegmatite
Field, are compelling. There are multiple targets within Cooletha to ground truth and/or assess with a regional 1 km
x 0.5 km soil grid program planned to further delineate the extents of the pegmatite fields.
Figure 2 – The location of the Pegmatite Fields and sampling at the Cooletha Lithium Project.
The exploration process for lithium pegmatites is a science-based process; once a favourable geological setting
has been identified, it is essential to follow through systematically to test pegmatite geometry, abundance, fertility
and lithium endowment because pegmatite chemistry / fractionation / fertility can vary substantially within as little
as several kilometres and can generate variable early-stage geochemical results.
ACM has started systematic exploration at Cooletha and programs are beginning to yield results indicating the
presence, scale and geochemistry of the CPF. The 2024 sampling campaign has had the benefit of an integrated
multi-spectral interpretation to focus the field program, a weathered pegmatite model and the experience of a
seasoned grassroots pegmatite exploration geologist leading the team and has delivered three newly recognised
pegmatite fields and an improved understanding of the project’s potential. Fifteen high and moderate priority multispectral target areas are yet to be explored by ACM.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 3 of 20
The scale of the CPF and surface expression similarities to other advanced and fertile pegmatite fields, are
compelling, and ACM’s CPF mineral system scale is not at all systematically tested at present. Several pegmatites
identified during the most recent rock chip sampling campaign and fifteen high to moderate multi-spectral based
targets within Cooletha remain to be ground truthed and/or assessed with soil programs, geochemical analysis and
follow up drill testing.
Figure 3 – Silica rich pegmatite ridges forming the lateral extents of a weathered subdued topographic low
representing the inner zone of the pegmatite intrusion. The soil between the silica ridges was noted as muscovite
rich at several locations.
Target Area F shown in Figure 3 is an example of coincident multispectral anomalism and photo-interpreted quartz
ridges. This area provides an example of a recessed pegmatite. The pegmatite formed a flattened hilltop, with two
Quartz Rich Border Zones (QRBZ) on the hill's flanks. Sample 10110 is of the QRBZ and is typified by a rock
composed of coarse-grained quartz with minor feldspar and/or mica.
Kaolinitic clays, quartz scree and muscovite flakes are often observed on a weathered pegmatite's surface; at this
location, quartz scree was dominant with lesser feldspar. This pegmatite geometry can be clearly seen in Photo A;
here, the pegmatite and QRBZ have a lozenge shape that is commonly observed in many pegmatite fields. Photo
B demonstrates the anastomosing nature of the pegmatite; here, the pegmatite pinches down, and the two QRBZ
coalesce into one quartz ridge.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 4 of 20
Figure 4 – Conceptual Recessed Pegmatite Block Model
The exploration model (Figure 4) displays a recessive pegmatite forming a flattened topographic feature or flat
hilltop; the surface material observed at these weathered pegmatites is typically composed of kaolinitic clays, quartz
scree and flakes of muscovite.
The Quartz Rich Border Zone (QRBZ) typically occurs on the contact of the pegmatite with the host rocks. These
QRBZ produce resistive ridges that form topographic highs and hold up the recessive pegmatites. The inverse of
this scenario was also observed within the CPF, where a pegmatite lacking prominent QRBZ formed a subtle
topographic high sub-cropping on a gently sloping plain. The borders of this pegmatite are only defined by the
cessation of the quartz, kaolin and mica gravels, sands and clays that litter the surface. Systematic soil sampling
programs are one tried and tested method to define the true near-surface footprint and provide geochemical data
to assess the fertility of a recessed pegmatite.
Pegmatites often occur in swarms or clusters, and this conceptual exploration model presents an example of a
buried pegmatite adjacent to the exposed pegmatite. Concealed pegmatites like those shown in the conceptual
block model require drill testing to be discovered. They are often intersected by drilling that targets an adjacent
pegmatite exposed at the surface.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 5 of 20
Future Plans
The next work programs at Cooletha are pragmatic steps to:
•
Implement systematic soil sampling programs on a regional scale (1 km x 0.5 km grid) across the
Goldilocks Zone to identify and rank anomalous CPF targets.
•
Infill anomalous soil results with a close-spaced soil sampling program (100 m x 50 m grid).
•
Conduct a thorough geochemical analysis of the soil and rock chip data to determine the fertility of CPF
and to vector towards areas of higher fractionation.
•
Surface investigation of the soil anomalies, map and collect rock chip samples from any exposed
pegmatites.
•
Plan an RC drilling program to test the most prospective surface geochemical anomalism.
•
Advance exploration efforts over the areas within both Cooletha and Shaw which are prospective for
Channel Iron Deposits and Banded Iron Formation.
For further information, please contact:
Dean de Largie
Ben Creagh
Managing Director
Investor and Media Relations
Australian Critical Minerals Limited
NWR Communications
E info@auscriticalminerals.com.au
E benc@nwrcommunications.com.au
T +61 (8) 6165 8858
T +61 417 464 233
About Australian Critical Minerals
Australian Critical Minerals is an exploration company focused on developing a quality portfolio of critical minerals
projects in Western Australia. The key projects are Cooletha (Pilbara) Lithium Project and Rankin Dome (Southern
Cross) Rare Earth Project.
Battery metals, including rare earths and lithium are fundamental in the clean energy transition to net zero
transmissions. ACM intends to play a pivotal role in delivering the processed minerals needed for a clean energy
future.
ACM has established a highly experienced management team with a proven track record of exploration and
corporate success in the mining industry.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 6 of 20
Reference to Previous Announcements
Investors can refer to the Company’s Prospectus for further disclosure on information in this Announcement and all of the
Company’s Projects. Investors should also refer to the Company’s release 28 August 2023 “Cooletha Exploration Update” for
more information on the pegmatite outcrops (and relevant samples).
Competent Persons Statement
The information in this report that relates to Exploration Targets and Exploration Results is based on information compiled by
Mr. Dean de Largie. Mr. de Largie is the Managing Director of Australian Critical Minerals Limited and is a Fellow of the Australian
Institute of Geoscientists and has sufficient experience relevant to the styles of mineralisation under consideration and to the
activity being reported to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves. Mr. de Largie have verified the data disclosed in this release and
consent to the inclusion in this release of the matters based on the information in the form and context in which it appears.
Forward Statement
This news release contains “forward-looking information” within the meaning of applicable securities laws. Generally, any
statements that are not historical facts may contain forward-looking information, and forward looking information can be identified
by the use of forward-looking terminology such as “plans”, “expects” or “does not expect”, “is expected”, “budget” “scheduled”,
“estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases
or indicates that certain actions, events or results “may”, “could”, “would”, “might” or “will be” taken, “occur” or “be achieved.”
Forward-looking information is based on certain factors and assumptions management believes to be reasonable at the time
such statements are made, including but not limited to, continued exploration activities, commodity prices, the estimation of initial
and sustaining capital requirements, the estimation of labour costs, the estimation of mineral reserves and resources,
assumptions with respect to currency fluctuations, the timing and amount of future exploration and development expenditures,
receipt of required regulatory approvals, the availability of necessary financing for the project, permitting and such other
assumptions and factors as set out herein.
Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual
results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied
by such forward-looking information, including but not limited to: risks related to changes in commodity prices; sources and cost
of power and water for the Project; the estimation of initial capital requirements; the lack of historical operations; the estimation
of labour costs; general global markets and economic conditions; risks associated with exploration of mineral deposits; the
estimation of initial targeted mineral resource tonnage and grade for the project; risks associated with uninsurable risks arising
during the course of exploration; risks associated with currency fluctuations; environmental risks; competition faced in securing
experienced personnel; access to adequate infrastructure to support exploration activities; risks associated with changes in the
mining regulatory regime governing the Company and the Project; completion of the environmental assessment process; risks
related to regulatory and permitting delays; risks related to potential conflicts of interest; the reliance on key personnel; financing,
capitalisation and liquidity risks including the risk that the financing necessary to fund continued exploration and development
activities at the project may not be available on satisfactory terms, or at all; the risk of potential dilution through the issuance of
additional common shares of the Company; the risk of litigation.
Although the Company has attempted to identify important factors that cause results not to be as anticipated, estimated or
intended, there can be no assurance that such forward-looking information will prove to be accurate, as actual results and future
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 7 of 20
events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance
on forward-looking information. Forward looking information is made as of the date of this announcement and the Company
does not undertake to update or revise any forward-looking information this is included herein, except in accordance with
applicable securities laws.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 8 of 20
JORC CODE 2012 EDITION, TABLE 1
Section 1. Sampling Techniques and Data
This Table 1 refers to the 2024 mapping and rock chip sampling completed by Australian Critical Minerals (ACM)
at the companies Cooletha Projects
Criteria
Sampling
techniques
JORC Code explanation
▪
Nature and quality of sampling (e.g., cut
Commentary
ACM Cooletha Mapping
channels, random chips, or specific specialised ▪
industry standard measurement tools
appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld
▪
structural compass.
ACM Rock Chip
XRF instruments, etc). These examples should Rock chip outcrop samples were taken at the discretion of the
supervising geologist and given a sample number correlating with
not be taken as limiting the broad meaning of
the observation point ID.
sampling.
Outcrop and sub-crop were taken from a 1x1m, 2x2m or
Include reference to measures taken to ensure ▪
sample representativity and the appropriate
4x4m area and are representative of the described and
calibration of any measurement tools or
recorded lithology where possible; samples were taken at
intervals 50m apart.
systems used.
▪
Aspects of the determination of mineralisation
▪
In cases where ‘industry standard’ work has
been done this would be relatively simple (eg
‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
ACM Cooletha Rock Chip Assays
▪
sampling problems. Unusual commodities or
Sample preparation for the Cooletha samples comprised
drying, crushing, splitting and pulverisation prior to analysis
(PREP-02).
▪
Samples have been submitted for Low-level detection of
trace elements Microwave digest, HF/multi-acid: 62 elements
mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
Samples have been submitted to LabWest, an ISO-certified
contract laboratory in Perth.
▪
cases, more explanation may be required, such
as where there is coarse gold that has inherent
Data spacing is variable due to the inherent irregular nature
of outcrops and is determined by the supervising geologist.
that are Material to the Public Report.
▪
Structural measurements were obtained using a Brunton
including REEs by ICP-MS/OES (MMA-04)
Sampling
▪
Rock samples were taken by hammer and chisel of rock
outcrop.
▪
Samples were localised, and care was taken to achieve a
representative sample of each site.
▪
▪
Samples were placed in a numbered calico sample bag.
Secured in Polyweave sacks and delivered for assay by
ACM personnel
Drilling
techniques
▪
Drill type (eg core, reverse circulation, open-
▪
No drilling has been reported.
hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, facesampling bit or other type, whether core is
oriented and if so, by what method, etc).
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 9 of 20
Criteria
Drill sample
recovery
JORC Code explanation
▪
Method of recording and assessing core and
Commentary
▪
No drilling has been reported.
chip sample recoveries and results assessed.
▪
Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
▪
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential loss/gain
of fine/coarse material.
Logging
▪
Whether core and chip samples have been
None of the information in this announcement is intended to
geologically and geotechnically logged to a level support a Mineral Resource Estimation.
of detail to support appropriate Mineral
Resource estimation, mining studies and
ACM Cooletha Mapping
▪
▪
Whether logging is qualitative or quantitative in
metallurgical studies.
▪
nature. Core (or costean, channel, etc)
At each location, the following was recorded where possible:
rock type, grain size, textures, weathering, mineralisation,
alteration, veining, and structures.
photography.
▪
Mapping observations were made in a qualitative manner.
▪
The total length and percentage of the relevant
intersections logged.
Photos of specimens and outcrop were recorded at the
geologist’s discretion.
ACM Cooletha Rock Chip Sampling
▪
Rock chip samples were logged in the field at the time the
samples were collected by an appropriately experienced
geologist.
▪
Geological information for rock chip samples was recorded
qualitatively, including colour, rock type, weathering,
dominant alteration mineral and mineralisation.
▪
Sample type was recorded as an outcrop, subcrop, float or
continuous rock chip.
▪
▪
Each sample was given a unique sample ID.
Most samples were photographed on top of the sample bag
with the sample ID showing.
Sub- sampling
techniques and
sample
preparation
▪
▪
If core, whether cut or sawn and whether
ACM Cooletha Rock Chip Sampling
quarter, half or all core taken.
▪
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
▪
For all sample types, the nature, quality, and
and block hammer at the supervising geologist’s discretion.
▪
recorded lithology where possible; samples were taken at
technique.
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
▪
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
▪
Whether sample sizes are appropriate to the
grain size of the material being sampled.
Outcrop and sub-crop were taken from a 1x1m, 2x2m or
4x4m area and are representative of the described and
appropriateness of the sample preparation
▪
Outcrop and sub-crop samples were taken using a geopick
intervals 50m apart.
▪
Data spacing is variable due to the inherent irregular nature
of outcrops and is determined by the supervising geologist.
▪
▪
▪
Samples range between 3-5kg in weight.
No Field duplicates were taken.
Certified Reference Material (CRM) materials were inserted
into the sampling sequence at a rate of 4.14 in 100.
▪
▪
No Coarse Blanks were inserted
Lab West, an ISO-certified contract laboratory, provided
sample preparation.
▪
Lab West preparation codes for analyses were PREP-02.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 10 of 20
Criteria
Quality of Assay
data and
laboratory tests
JORC Code explanation
▪
The nature, quality and appropriateness of the ACM Cooletha Rock Chip Sampling
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
▪
For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
▪
Commentary
Nature of quality control procedures adopted
(eg standards, blanks, duplicates, external
▪
Samples are photographed on top of the sample bag with the
sample number displayed.
▪
QA/QC analytical standards are photographed, and the
Standard ID is removed before it is placed into a sample bag.
▪
Samples have been submitted to LabWest, an ISO-certified
contract laboratory in Perth.
▪
Sample preparation comprised drying, crushing, splitting and
pulverisation prior to analysis (PREP-02).
▪
Samples have been submitted for Low-level detection of
trace elements Microwave digest, HF/multi-acid: 62 elements
laboratory checks) and whether acceptable
levels of accuracy (ie lack of bias) and precision ▪
have been established.
including REEs by ICP-MS/OES (MMA-04)
LabWest quality control procedures include blanks,
standards, pulverisation repeat assays, weights and sizings.
Insertion Rate Per 100 Samples
Analytical
Standards
(CRMs)
Blank
#Orig
#Orig+QC
ALW008548
32
0
167
169
ALW0084548A
4
0
2
6
Lab Batch #
Verification of
sampling and
assaying
▪
The verification of significant intersections by
ACM Cooletha Mapping
either independent or alternative company
▪
personnel.
▪
▪
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, and data storage
(physical and electronic) protocols.
▪
Discuss any adjustment to assay data.
Structural measurements were obtained using a Brunton
structural compass.
▪
▪
2 field observations were recorded at Cooletha.
Data was recorded using a combination of Field Notebook
and a Windows tablet.
▪
Data was transferred or transcribed onto Microsoft Excel
spreadsheets.
▪
▪
Suitably qualified geologist completed mapping.
A supervising geologist has verified the geological
interpretation and mapping points reported here. Due to the
inherent weathering process of outcropping lithologies,
mineral identification was not always possible.
ACM Cooletha Rock Chip Sampling
▪
Location data was recorded using a Garmin 62 series GPS
and transferred to a Microsoft Excel spreadsheet.
▪
All data is stored on a private cloud NAS server featuring
multi-site replication (Resilio Connect), redundancy (RAID),
and onsite and offsite backups (via tape and cloud backup).
These servers are protected via FortiGate Firewalls with
IPS/IDS, with least privilege access, regular security
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 11 of 20
Criteria
JORC Code explanation
Commentary
patching, and proactive security monitoring, including regular
audits by the consultant IT team.
▪
Certified Reference Material (CRM) materials were inserted
into the sampling sequence at a rate of 4.14 in 100.
Location of data
points
▪
Accuracy and quality of surveys used to locate ACM Cooletha Rock Chip and Channel Sampling
drill holes (collar and down- hole surveys),
▪
trenches, mine workings and other locations
used in Mineral Resource estimation.
▪
▪
Data spacing and ▪
distribution
▪
map projection for easting/northing/RL.
▪
Specification of the grid system used.
Garmin GPSMAP 62 series was used to record observation
and sample points with an accuracy of +/-4m.
Quality and adequacy of topographic control.
▪
Data spacing for reporting of Exploration
None of the information in this announcement is intended to
Results.
support a Mineral Resource Estimation.
Whether the data spacing and distribution is
ACM Cooletha Mapping
sufficient to establish the degree of geological
and grade continuity appropriate for the Mineral
▪
procedure(s) and classifications applied.
No topographic control was recorded.
Data spacing is variable due to the inherent irregular nature
of outcrops and is determined by the supervising geologist.
Resource and Ore Reserve estimation
▪
The grid system used is GDA94 datum and MGA Zone 55
ACM Cooletha Rock Chip Sampling
Whether sample compositing has been applied. ▪
Data spacing is variable due to the inherent irregular nature
of outcrops and determined by the supervising geologist.
▪
▪
Orientation of
▪
data in relation to
geological
structure
▪
Samples are taken at a spacing of 50m.
No sample compositing has been applied.
Whether the orientation of sampling achieves
ACM Cooletha Mapping
unbiased sampling of possible structures and
▪
the extent to which this is known, considering
the deposit type.
If the relationship between the drilling
orientation and the orientation of key
possible.
ACM Cooletha Rock Chip Sampling
▪
Rock chip sampling is conducted along strike of targeted
structures or outcrops determined by the supervising
mineralised structures is considered to have
geologist and assisted by GPS and GIS polygons.
introduced a sampling bias, this should be
assessed and reported if material.
Representative structural measurements were taken where
▪
Sampling was also conducted perpendicular to the strike of
the targeted structures to explore for parallel structures.
Sample security
▪
The measures taken to ensure sample security. ▪
Sample security protocols adopted by ACM are documented.
ACM site personnel with the appropriate experience and
knowledge manage the chain of custody protocols for rock
chip samples from site to laboratory.
Audits or reviews ▪
The results of any audits or reviews of sampling ▪
No audits or reviews undertaken.
techniques and data.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 12 of 20
Section 2. Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Mineral tenement
and land tenure
status
JORC Code Explanation
▪
Comments
Type, reference name/number, location
The Greater Cooletha exploration area is currently made up of
and ownership including agreements or
two licences E45/4990 (Cooletha) and E45/5228 (Cooletha
material issues with third parties such as
South)
joint ventures, partnerships, overriding
royalties, native title interests, historical
E45/4990 (Cooletha)
sites, wilderness or national park and
E45/4990 was granted to Proterozoic Gold, a 100% subsidiary of
environmental settings.
Great Southern Gold Pty, on the 24th of October 2019 for a
period of 5 years. The licence at granting consisted of 39 blocks.
▪
The security of the tenure held at the time
On 27/03/2023, 100% of E45/4990 was acquired by Australian
of reporting along with any known
Critical Minerals Ltd (ACM).
impediments to obtaining a licence to
The licence is currently due to expire on the 23 October 2024.
operate in the area.
E45/5228 (Cooletha South)
E45/5228 was granted to Proterozoic Gold, a 100% subsidiary of
Great Southern Gold Pty, on 29 July 2019 for a period of 5 years.
The licence at granting consisted of 40 blocks.
On 27/03/2023, 100% of E45/4990 was acquired by Australian
Critical Minerals Ltd (ACM).
The licence is currently due to expire on the 28th of July 2024.
Additionally, ACM has the following licences in applications.
E45/5052 (Cooletha
Share your feedback