Flint Drill Ready Gold-Silver Project Update
Released
Released
Announcement PDF
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
ASX ANNOUNCEMENT
January 29 2026
Flint Drill Ready Gold-Silver Project Update
HIGHLIGHTS
• Comprehensive review of recent NSAMT geophysics, geochemistry, mapping and IP
data completed.
• A large gold and silver geochemical anomaly has been defined from historic surface
rock samples and delineates a large halo of highly anomalous pathfinder elements
(incl arsenic and tellurium) indicative of a High Sulphidation Epithermal deposit
type.
• Subsurface modelling of electrical geophysics methods (IP and NSAMT) indicates
that the system has a strike length of 4km.
• Located 80km east of Trujillo, Peru (population +1M) in one of the world's most prolific
epithermal metallogenic belts with a gold inventory / production history of >50Moz Au.
• Initial program of 4 priority diamond drillholes for 1850m to commence this quarter.
Executive Chairman Dean de Largie said:
“Flint is now drill-ready, with permits in place and funding secured to commence our
maiden diamond drilling program this quarter. Importantly, the Project sits within a
highly endowed epithermal gold-silver province, reinforcing the potential scale and
significance of the system we are targeting.
The recently completed NSAMT survey has identified a series of resistive targets over a
strike length of approximately 4km, supporting the interpretation of a large high-
sulphidation epithermal gold-silver system. In combination with historic surface
geochemistry and mapping in the northern end of the project, these results provide
compelling high-priority drill targets for our initial program.
In the background, the team has signed surface access agreements, received approval
of the Company’s Environmental Permit, and informed the relevant authority of our
intention to commence drilling activities this quarter.”
Australian Critical Minerals Ltd (ASX:ACM, “ACM” or “the Company”) is pleased to
announce the results of the Flint gold-silver Project technical review and the provide the
updated Investor Presentation relating to exploration plans at Flint.
The Flint project is an undrilled high-sulphidation epithermal (HSE) gold/silver project
located 80 km east of Trujillo (pop +1M) in La Libertad, northern Peru, covering 2,200
hectares. The district is one of the world's most prolific epithermal metallogenic belts with
a gold inventory and production history exceeding 50 Moz Au (Figure 1).
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Figure 1. Flint location and positioning amongst Tier 1 gold – silver producers
The Company recently completed an NSAMT geophysics program on the Flint Project.
Modelling of the geophysics data in conjunction with historic mapping, surface
geochemistry, surface alteration and historic IP data covering the Northern portion of the
project, identified several large resistors separated by conductivity anomalies.
The Technical Review has recommended 5 drillholes in the Northern half of the Project. Four
of these are recommended for an initial high-priority drilling program of approximately 1850
metres. The targets are resistive anomalies coincident with surface geochemistry and
alteration indicative of a high-sulphidation epithermal (HSE) gold-silver system.
A large geochemical anomaly has been defined and delineates a large halo of highly
anomalous pathfinder elements indicative of the HSE deposit type.
Subsurface modelling of electrical geophysics methods (IP and NSAMT) indicates that the
system has a strike length of 4km
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Figure 2. Flint tenure, geophysics survey lines and location of historic samples
Geophysical and geological data compilation and validation
Drill targets are based on the compilation of project datasets, including company and state
cadastral information; processing of ALOS data to generate digital elevation models; a 26.5
line-km NSAMT geophysical survey (ACM) across 14 east–west oriented survey lines;
modelling of 9.2 line-km of historic IP and magnetic data across 10 survey lines; and
integration of historic geochemistry from surface rock samples (Figure 2).
Advanced NSAMT Geophysics
Interpretation of the NSAMT data has identified a large, continuous resistive body interpreted
to represent the silicified core of a high-sulphidation epithermal system. The resistive
anomalies show strong vertical continuity from approximately 100 metres to at least 300
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
metres below surface and correlate closely with historic surface geochemistry and alteration
mapping (Figure 3).
The NSAMT results confirm Flint as a large, coherent hydrothermal systemwith a strike extent
exceeding four kilometres. The survey has significantly expanded the project’s exploration
footprint beyond the limits of previous induced polarisation data and has refined multiple
high-priority drill targets. The inversion models define several coherent line-to-line trends of
elevated resistivity within the upper few hundred metres of the subsurface. A high resistivity
“basement” appears to approach the surface toward the southwest of the survey area.
Figure 3. High-priority drill-targets based on comprehensive modelling of recent
NSAMT geophysics with multiple historical geological and geophysical datasets
Drill Permitting and Drill Readiness
All regulatory clearances to commence drilling on the northern portion of the Flint Project
within the Gaya103 concession have been granted. Approved drill pads are positioned such
that drillholes will transect the core NSAMT resistive zones and maximise the probability of
intersecting mineralised structures.
Drilling preparations are well advanced and planned as part of an initial drill program
designed to test the geometry, depth extent and metal endowment of the system.
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Environmental approvals for the southern concessions are well progressed, supporting a
staged expansion of drilling across the broader project area.
This release has been approved by the Board of Australian Critical Minerals Limited.
Competent Person Statement
The information in this report that relates to Exploration Results is based on information
compiled by Mr. Dean de Largie, a Competent Person who is a Fellow of the Australian Institute
of Geoscientists. Mr. de Largie is the Executive Chairman of Australian Critical Minerals Limited.
Mr. de Largie has sufficient experience that is relevant to the style of mineralisation and type of
deposit under consideration and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves’. Mr. de Largie consents to the inclusion in the
report of the matters based on his information in the form and context in which it appears.
For further information, please contact:
Dean de Largie Paul Berson
Executive Chairman Investor and Media Relations
Australian Critical Minerals Limited Corporate Storytime
E info@auscriticalminerals.com.au E paul@corporatestorytime.com
T +61 (8) 6165 8858 T +61 421 647 445
About Australian Critical Minerals
Australian Critical Minerals (ASX: ACM) is an exploration company developing a diversified portfolio of
precious and base metal projects in Peru and Western Australia. The Company’s strategy is to advance
high-grade, district-scale projects through disciplined exploration, responsible operations, and community
engagement to create sustained shareholder value.
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
JORC CODE 2012 EDITION, TABLE 1
Section 1. Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques Nature and quality of sampling (e.g., cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure
sample representativity and the appropriate
calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that
are Material to the Public Report.
In cases where ‘industry standard’ work has been
done this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases, more
explanation may be required, such as where there
is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation
types (eg submarine nodules)
may warrant disclosure of detailed information.
No unreported sampling has been reported in this
press release. Historic geochemistry results were
previously reported June 12, 2025 in “Australian
Critical Minerals to acquire significant gold and
copper portfolio in mineral rich Peru”
Drilling
techniques Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (eg core diameter, triple or standard
tube, depth of diamond tails, face- sampling bit or
other type, whether core is oriented and if so, by
what method, etc).
No drilling has been reported.
Drill sample
recovery Method of recording and assessing core and chip
sample recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
No drilling has been reported.
Logging
Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
No drilling has been reported.
No resource estimate has been reported.
Historic surface rock chip samples were qualitatively
logged. .
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the relevant
intersections logged.
Sub- sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether quarter,
half or all core taken.
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
For all sample types, the nature, quality, and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain
size of the material being sampled.
No sampling has been reported
Quality of
Assay data
and laboratory
tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used
in determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures adopted
(eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have
been established.
Surface rock chip QAQC protocols were previously
reported in the above-mentioned June 12 2025
press release.
Verification of
sampling and
assaying
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
No sampling and no assays have been
reported
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Documentation of primary data, data entry
procedures, data verification, and data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
Location of
data points Accuracy and quality of surveys used to locate drill
holes (collar and down- hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
NSAMT geophysics reported in the is release
was acquired in the wgs84 z 17S datum. The
NSAMT geophysics survey data was acquired
on a 300m line spacing. Historic IP in the
northern half of the project surveyed using a
100m line spacing
Data spacing
and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
Whether sample compositing has been applied.
No Mineral Resource and Ore Reserve
estimation is reported in this release.
Orientation of
data in
relation to
geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
If the relationship between the drilling orientation
and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
Geophysics survey lines are approximately
perpendicular to the strike of the hydrothermal
system
Sample
security The measures taken to ensure sample security. No new or unreported sampling has been reported
Audits or
reviews The results of any audits or reviews of sampling
techniques and data.
No new or unreported sampling or assay data is in
this press release. The geophysics program is in
progress and will be modelled and reviewed upon
completion.
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Section 2. Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral tenement and land
tenure status Type, reference name/number, location
and ownership including agreements or
material issues with third parties such
as joint ventures, partnerships,
overriding royalties, native title
interests, historical sites, wilderness or
national park and environmental
settings.
The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence
to operate in the area.
Flint has 3 licences. Gaya 103 is held by
Pegoco SAC which is a 100% owned
subsidiary of ACM. El Perseverante and
Cerro Pedernal are held through a 100%
option to purchase by Latin Gold SAC.
Tenure is in good standing.
There are no native title interests
Exploration done by other
parties Acknowledgment and appraisal of
exploration by other parties.
Southern Rock Geophysics modelled the
NSAMT data and remodelled the historical IP
data.
Geology
Deposit type, geological setting, and
style of mineralisation. Flint is regarded as high-sulphidation
epithermal property. The volcanic host rock
has not been formally dated, however it is
considered to be of approximately Miocene
age.
Drill hole Information
A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes: easting and northing of the drill
hole collar elevation or RL, dip and
azimuth of the hole, down hole length
and interception depth, hole length. If
the exclusion of this information is
justified on the basis that the
information is not Material and this
exclusion does not detract from the
understanding of the report, the
Competent Person should clearly
explain why this is the case.
▪ No drilling reported
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Data aggregation methods
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (eg cutting of high grades)
and cut-off grades are usually Material
and should be stated.
Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should
be shown in detail.
The assumptions used for any reporting
of metal equivalent values should be
clearly stated.
No unreported sampling or assays are
included in this release
Relationship between
mineralisation, widths and
intercept lengths
These relationships are particularly
important in the reporting of Exploration
Results.
If the geometry of the mineralisation
with respect to the drill hole angle is
known, its nature should be reported.
If it is not known and only the down
hole lengths are reported, there should
be a clear statement to this effect (e.g.,
down hole length, true width not
known’).
Appropriate maps and sections
▪ No drilling has been reported
Diagrams
Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These
should include, but not be limited to a
plan view of drill hole collar locations
and appropriate sectional views.
▪ No sampling has been reported
Balanced Reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting
of Exploration Results.
▪ No previously unreported assays have been
reported
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Other substantive
exploration data Other exploration data, if meaningful
and material, should be
reported, including (but not limited to):
geological observations; geophysical
survey results; geochemical survey
results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
A 3D inversion model of NSAMT data has
been presented. Inversion modelling shows
several resistivity anomalies extending from
a depth of approximately 100m to below
300m.
Further work
The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions, or large-scale step-
out drilling).
Diagrams clearly highlighting the areas
of possible extensions, including the
main geological interpretations and
future drilling areas, provided this
information is not commercially
sensitive.
o Next steps include a diamond drilling
program of 4 drillholes for approximately
1850m. Historically the southern half of the
project has had less surface geology and
alteration mapping compared to the northern
sector. This is expected to be addressed
concurrently with the planned drilling
campaign. Significant NSAMT anomalies
exist in the southern sector. l IP is planned in
this region to further define sub-surface
conductors.
Share your feedback
Discover