Outstanding Results from Pilbara Iron Exploration Programs
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
19 August 2024
Outstanding Results from Pilbara Iron Exploration
Programs
Highlights
Cooletha and Shaw Projects:
•
46 rock-chip sampling program completed across Cooletha and Shaw Projects in the Pilbara, WA
•
Shaw Project Banded Iron Formation (BIF) sampling returns up to 61.3% Fe averaging 55.5% Fe
•
Cooletha, Channel Iron Deposits (CID) sampling returns up to 62.6 % Fe averaging 54.9% Fe
•
Field Crew have mobilised to conduct extensive grid sampling program on the Cooletha Channel
Iron sites and sample traverses across Banded Iron Formation at Shaw
Australian Critical Minerals (ASX: ACM, “Australian Critical Minerals” or “the Company”) is pleased to provide
an update on results of the recent field sampling and mapping programs at the Shaw and the Cooletha Projects in
the Pilbara, Western Australia. A total of 39 rock chip samples have been taken from Cooletha and 7 rock chip
samples from Shaw. Cooletha CID samples averaged 54.9% Fe. Of note is the very low phosphorous content
which averages 0.08% at Cooletha.
Managing Director Dean de Largie commented:
“The impressive results returned from our Shaw and Cooletha Projects in the Pilbara are an early but important step
in realising the value proposition offered by our iron ore portfolio. It has been our belief that the iron ore product at
Shaw and Cooletha is of a quality that could be of interest to our surrounding neighbours, Fortescue Metals Group
and Roy Hill. In addition to these potentially commercial Fe grades, we are pleased to note that the samples have
a particularly low phosphorous concentration with an average 0.08% Phosphorous in the Cooletha samples. Based
on these very respectable Fe results we have commenced a large sampling program of approximately 800 rock
samples across the significant CIDs at Cooletha and the significant BIFs at Shaw.”
Shaw Project
The sampling and reconnaissance program at Shaw has established that the width of the BIF unit at surface outcrop
varies from approximately 10m to over 40m. It appears to be faulted and offset in the centre of the outcropping
unit. The BIF unit can be traced northward where it becomes strongly contorted and brecciated and changes
orientation from north-south to a westerly strike toward the Abydos Mining Complex (Fig 1). The extent of the BIF
on the western side of the tenement can be traced for over 5km (Figs 1 & 2).
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 1 of 15
Figure 1. Mapped Banded Iron outcropping at Shaw and recent BIF samples
Recent rock sampling at the Shaw BIF on the western side of the tenement has returned a peak result of 61.3% Fe
(Table 1). The sampling was focussed in an area of about a hectare. The results validate the Company’s modelling
around the structural events affecting the stratigraphy of the host rocks of the Abydos Mining Complex. A detailed
sampling program has been initialised which encompasses up to 32 traverses across the main BIF units on the
Shaw tenement. This will culminate with approximately 400 rock samples.
Table 1 Shaw Project Rock Sample Results
SampleID
E
N
Fe %
Al2O3 %
SiO2 %
P%
LOI %
8575
8576
8577
8579
731671
731717
731742
731663
7661605
7661555
7661633
7661596
61.3
46.7
28.1
58.6
0.53
2.49
2.31
1.23
1.97
21.35
51.98
5.82
0.01
0.03
0.03
0.03
10.28
8.706
4.367
8.709
The Shaw tenement is dominated by volcanic and sedimentary rocks of the De Grey Supergroup, as well as domal
granitic complexes, minor intrusions, and outliers of the Mount Bruce Supergroup (Fortescue Group). The tenement
has multiple opportunities for exploration success including Banded Iron formation (BIF), conglomerate hosted gold
and uranium mineralisation.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 2 of 15
ACM is targeting BIF iron deposits occurring west and south of the Lalla Rookh Sandstone Formation. The BIF
units are potentially related to the Abydos Iron Ore complex. The BIF unit outcrops in a NNW to NW direction for a
distance of 5km (Fig 2).
Figure 2. Shaw Project BIF with a 5.5km outcrop and insets of photos of the samples which graded up to
61.3% Fe.
Cooletha Project
Cooletha rock samples returned an average of 54.9% Fe from 39 samples from the central and eastern regions of
the Project (Table 2). The Cooletha Central CID sampled has an arcuate form with a length of approximately 4km
(Fig 3). The full thickness of this CID is obscured by the scree slope but is estimated to be in order of 30m. The
peak value of samples from this CID was 59.3% Fe. Fifteen samples were from this CID of which 13 returned an
assay greater than 50% Fe.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 3 of 15
Table 2 Cooletha Rock Sample Results
SampleID
8565
8566
8567
8569
8570
8571
8572
8573
8812
8813
8814
8815
8816
8817
8818
8551
8552
8553
8554
8555
8556
8557
8558
8559
8560
8561
8562
8563
8564
8801
8802
8803
8804
8805
8806
8807
8808
8809
8810
E
729865
728466
728567
728822
728710
728850
728882
728982
730039
730014
729505
729377
729416
729281
729025
742170
741790
741805
741778
742103
742114
742370
742241
742370
742372
742390
742408
742423
742441
741746
741744
742160
742457
742445
742403
742364
742382
742413
742399
N
7554683
7556011
7556007
7556138
7556066
7556163
7556192
7556296
7554825
7555006
7555468
7555822
7556066
7556407
7556476
7556450
7556540
7556540
7556419
7557291
7557324
7558136
7558393
7558921
7558952
7559040
7559166
7559329
7559494
7556194
7556353
7557412
7558157
7558259
7558345
7558438
7558559
7558724
7560021
Fe %
54.8
58.1
59.3
57.8
59.3
55.4
52.7
53.5
56.4
55.5
54.6
57.8
50.8
54.8
43.1
42.7
55.8
57.8
58.3
56.8
53.5
31.5
45.1
56.5
55.4
55.5
51.5
58.2
56.2
62.6
59.3
60.3
56.8
58.4
58.1
60.5
57.5
53.5
55.7
Al2O3 %
2.06
3.06
1.47
3.12
1.98
6.03
6.35
6.61
4.36
5.29
6.97
3.74
9.26
5.99
14.45
13.79
1.78
2.70
1.30
4.02
6.52
8.05
6.46
3.55
5.12
3.34
7.20
2.25
3.97
0.81
1.87
0.60
2.76
1.72
1.02
1.40
1.47
3.97
3.23
SiO2 %
6.39
4.02
2.42
3.08
1.86
6.12
7.14
5.82
4.00
5.20
4.06
2.07
3.04
4.73
5.56
10.90
8.81
2.76
4.21
3.44
3.61
28.22
13.92
7.23
6.05
5.52
7.14
4.06
4.49
1.90
3.12
2.93
4.66
5.37
3.36
3.38
3.12
5.37
3.42
P%
0.06
0.01
0.01
0.01
0.02
0.03
0.04
0.04
0.01
0.01
0.04
0.03
0.02
0.03
0.03
0.23
0.05
0.05
0.04
0.06
0.05
0.82
0.94
0.05
0.06
0.03
0.03
0.02
0.02
0.02
0.05
0.02
0.02
0.05
0.02
0.02
0.02
0.01
0.05
LOI %
10.85
9.22
10.33
10.34
10.20
10.20
9.90
10.33
10.51
10.26
11.59
10.85
13.59
10.33
15.50
11.34
9.40
11.15
10.40
10.54
12.09
14.48
12.41
8.13
9.64
10.98
12.52
9.63
10.69
7.89
9.46
10.33
10.42
9.28
11.43
8.63
12.00
13.36
13.15
Region
Central
Central
Central
Central
Central
Central
Central
Central
Central
Central
Central
Central
Central
Central
Central
East
East
East
East
East
East
East
East
East
East
East
East
East
East
East
East
East
East
East
East
East
East
East
East
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 4 of 15
Figure 3. Sample locations Cooletha Central and representative rock samples
Cooletha straddles the southern contact of the Pilbara craton and the Fortescue basin. Channel Iron Deposits occur
above the rock unit called the Fortescue Group. Conglomerate hosted gold and manganese shales occur at the
base of the Fortescue Group. The paleo drainage systems responsible for the Cooletha CIDs are extensive and
have been identified over a strike length of 5km at Cooletha East and 30km between Cooletha Central and Cooletha
West (Fig 4).
Figure 4. Cooletha CIDs occur over an extensive area. Included is a size comparison of BC Irons’ Bonnie
Creek Resource.
A size comparison of the Bonnie Creek 89Mt at 54.1% Fe resource within 10km of CIDs and the approximately
25km of Cooletha CIDs provides some early guidance on size potential of the Cooletha project (Fig 4). ACM
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 5 of 15
considers that there is potential for regolith hosted iron mineralisation throughout Cooletha and plans to investigate
this during our exploration campaigns (Figs 5, 6 and 7).
Figure 5. Regolith hosted iron mineralisation is an additional targeted resource at Cooletha
Figure 6. Regolith hosted iron mineralisation is an additional targeted resource at Cooletha
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 6 of 15
Figure 7. Cooletha East rock sample locations, representative samples and regolithic iron target for
subsequent evaluation
2
2
ACM has a significant tenure of 252km of granted and 151km of tenement applications at Cooletha. Approximately
half of the tenure contains the stratigraphy of the Fortescue Group, which is prospective for CIDs. The Company
looks forward to updating shareholders with the progress of the current grid and traverse sampling at Cooletha and
Shaw.
For further information, please contact:
Dean de Largie
Ben Creagh
Managing Director
Investor and Media Relations
Australian Critical Minerals Limited
NWR Communications
E info@auscriticalminerals.com.au
E benc@nwrcommunications.com.au
T +61 (8) 6165 8858
T +61 417 464 233
About Australian Critical Minerals
Australian Critical Minerals is an exploration company focused on developing a quality portfolio of critical minerals
projects in Western Australia. The key projects are the Cooletha (Pilbara) Lithium Project, the Cooletha and Shaw
iron projects and the Rankin Dome (Southern Cross) Rare Earth Project.
Battery metals, including rare earths and lithium, are fundamental in the clean energy transition to net zero
transmissions. ACM intends to be pivotal in delivering the processed minerals needed for a clean energy future.
ACM has established a highly experienced management team with a proven record of exploration and corporate
success in the mining industry.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 7 of 15
Competent Persons Statement
The information in this report that relates to Exploration Targets and Exploration Results is based on information compiled by
Mr. Dean de Largie. Mr. de Largie is the Managing Director of Australian Critical Minerals Limited and is a Fellow of the Australian
Institute of Geoscientists and has sufficient experience relevant to the styles of mineralisation under consideration and to the
activity being reported to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves. Mr. de Largie has verified the data disclosed in this release and
consented to including the matters based on the information in the form and context in which it appears.
Forward Statement
This news release contains “forward-looking information” within the meaning of applicable securities laws. Generally, any
statements that are not historical facts may contain forward-looking information. Forward looking information can be identified
by the use of forward-looking terminology such as “plans”, “expects”, or “does not expect”, “is expected”, “budget” “scheduled”,
“estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases
or indicates that certain actions, events or results “may”, “could”, “would”, “might” or “will be” taken, “occur” or “be achieved.”
Forward-looking information is based on certain factors and assumptions management believes to be reasonable at the time
such statements are made, including but not limited to continued exploration activities, commodity prices, the estimation of initial
and sustaining capital requirements, the estimation of labour costs, the estimation of mineral reserves and resources,
assumptions concerning currency fluctuations, the timing and amount of future exploration and development expenditures,
receipt of required regulatory approvals, the availability of necessary financing for the project, permitting and such other
assumptions and factors as set out herein.
Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual
results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied
by such forward-looking information, including but not limited to: risks related to changes in commodity prices; sources and cost
of power and water for the Project; the estimation of initial capital requirements; the lack of historical operations; the estimation
of labour costs; general global markets and economic conditions; risks associated with exploration of mineral deposits; the
estimation of initial targeted mineral resource tonnage and grade for the project; risks associated with uninsurable risks arising
during the course of exploration; risks associated with currency fluctuations; environmental risks; competition faced in securing
experienced personnel; access to adequate infrastructure to support exploration activities; risks associated with changes in the
mining regulatory regime governing the Company and the Project; completion of the environmental assessment process; risks
related to regulatory and permitting delays; risks related to potential conflicts of interest; the reliance on key personnel; financing,
capitalisation and liquidity risks including the risk that the financing necessary to fund continued exploration and development
activities at the project may not be available on satisfactory terms, or at all; the risk of potential dilution through the issuance of
additional common shares of the Company; the risk of litigation.
Although the Company has attempted to identify important factors that cause results not to be as anticipated, estimated or
intended, there can be no assurance that such forward-looking information will prove to be accurate, as actual results and future
events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance
on forward-looking information. Forward-looking information is made as of the date of this announcement, and the Company
does not undertake to update or revise any forward-looking information this is included herein, except in accordance with
applicable securities laws.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 8 of 15
JORC CODE 2012 EDITION, TABLE 1
Section 1. Sampling Techniques and Data
This Table 1 refers to the 2024 mapping and rock chip sampling completed by Australian Critical Minerals (ACM) and historical
exploration data at the Company’s Cooletha and Shaw projects.
Results reported here are not being used towards Mineral Resource Estimate or Reserve calculations.
Criteria
Sampling
techniques
JORC Code explanation
•
•
•
•
Drilling
techniques
Drill sample
recovery
Commentary
Nature and quality of sampling (e.g., cut
•
channels, random chips, or specific specialised
industry standard measurement tools
appropriate to the minerals under investigation, •
such as down hole gamma sondes, or handheld
XRF instruments, etc). These examples should •
not be taken as limiting the broad meaning of
sampling.
•
Include reference to measures taken to ensure
sample representativity and the appropriate
•
calibration of any measurement tools or
systems used.
•
Aspects of the determination of mineralisation
that are Material to the Public Report.
In cases where ‘industry standard’ work has
been done this would be relatively simple (eg
‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases, more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
ACM rock chip outcrop samples were taken at the discretion of the
supervising geologist and given a sample number correlating with
the observation point ID.
Outcrop samples were taken of Channel Iron Deposits (CID) at
Cooletha and Banded Iron Formation (BIF) at Shaw project areas
Sample spacing is variable due to the irregular distribution of
outcrops and is determined by the supervising geologist.
A total of 39 rock chip samples were taken from Cooletha and 7 rock
chip samples from Shaw at the time of this release.
Rock samples were taken by hammer and chisel of rock outcrop as
single samples.
Samples were localised, and care was taken to achieve a
representative sample of each site.
•
Drill type (eg core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, facesampling bit or other type, whether core is
oriented and if so, by what method, etc).
•
Drilling results are not included in the report to which this table
relates.
•
•
Method of recording and assessing core and
chip sample recoveries and results assessed.
Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential loss/gain
of fine/coarse material.
Drilling results are not included in the report to which this table
relates
•
•
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 9 of 15
Criteria
Logging
JORC Code explanation
•
•
•
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the relevant
intersections logged.
Commentary
•
•
•
•
•
•
•
Sub- sampling
techniques and
•
sample
preparation
•
•
•
•
Quality of Assay
data and
laboratory tests
•
•
•
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality, and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the
grain size of the material being sampled.
•
•
The nature, quality and appropriateness of the •
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
•
determining the analysis including instrument
•
make and model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures adopted
(eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (ie lack of bias) and precision
have been established.
•
•
•
•
Rock chip samples were logged in the field during sampling by an
appropriately experienced geologist.
Geological information for rock chip samples was recorded
qualitatively, including colour, rock type, weathering, dominant
minerals and mineralisation form.
Sample type was recorded as an outcrop, subcrop, float or
continuous rock chip.
Each sample was given a unique sample ID.
Most samples were photographed on top of the sample bag with the
sample ID showing.
None of the information in the report to which this table relates is
intended to support a Mineral Resource Estimate.
Samples were submitted to LabWest, an ISO-certified contract
laboratory in Perth.
Sample preparation for the Cooletha and Shaw samples comprised
drying, crushing, splitting and pulverisation prior to analysis (PREP02).
All samples were analysed for S by µ-wave assisted HF based multiacid digest with ICP-OES finish (MMA-04) and Al2O3, Fe, P, SiO2 by
alkaline salt (lithium meta/tetraborate) fusion followed by dissolution
in nitric acid for determination of major rock-forming elements by ICPOES and resistate traces by ICP-MS (Lab Code: AF02).
The analytical technique is considered a total extraction method
All samples were submitted for analysis of Al, Ca, Fe, K, Mg, Mn, Na,
P, Si, Ti, LoI by AF-02 which the code for a Labwest method where
the pulverised sample is fused with an alkaline salt at high
temperature then dissolved in acid. Elemental determination is
performed using ICP-OES and ICP-MS to give low detection limits
and complete recoveries for major oxides, resistant traces and Rare
Earth Elements.
CRMs were inserted into the sample string
Quality control procedures included CRMs OREAS 24P, 45h, 461
and 464, blanks and repeats. OREAS 24P was not certified with the
assay method and therefore was excluded from the QAQC review.
Lab standards were inserted at a rate of 19.6 in every 100 samples.
The Standards were assayed for key elements Al, Fe, Si and P.
Lab blanks were inserted at a rate of 17.39 in every 100 samples.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 10 of 15
Criteria
JORC Code explanation
Commentary
•
•
•
•
•
•
•
Verification of
sampling and
assaying
•
•
•
•
The verification of significant intersections by
either independent or alternative company
personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, and data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
•
•
•
•
Location of data
points
•
•
•
Data spacing and
distribution
•
•
•
•
Orientation of
data in relation to
Accuracy and quality of surveys used to locate
drill holes (collar and down- hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
•
•
•
The CRM’s utilised (OREAS 45h, 461 and 464) are certified using
Borate/Peroxide Fusion ICP finish and they are reviewed as follows.
Oreas 24-p was certified for fusion XRF only and therefore
considered not suitable.
OREAS 45h and OREAS 461 returned results within 3SD for all
elements reviewed Al, Fe, P and Si.
LabWest completed 24 repeat analyses of the sample pulps. The
repeats were reviewed for the elements Fe, Al, Si and P. Fe returned
within the acceptable 10% percent difference for all samples.
Three lab blanks were analysed for Al, Fe, P, and Si and returned
below detection results or at detection limit results for all elements.
All CRMs returned values within 3 SD for Fe P and Si. Oreas 464
had two Al results returned outside 3SD.
All Blanks were acceptable.
Results from Repeats were considered acceptable
No verification of significant results has been completed by ACM.
Location data was recorded using a Garmin 62 series GPS and
transferred to a Microsoft Excel spreadsheet.
All data is stored on a private cloud NAS server featuring multi-site
replication (Resilio Connect), redundancy (RAID), and onsite and
offsite backups (via tape and cloud backup). These servers are
protected via FortiGate Firewalls with IPS/IDS, with least privilege
access, regular security patching, and proactive security monitoring,
including regular audits by the consultant IT team.
No adjustments have been made to the assay data received from
LabWest.
The grid system used is GDA94 datum and MGA Zone 50 map
projection for easting/northing/RL.
Garmin GPSMAP 62 series handheld GPS was used to record
observation and sample points with an accuracy of +/- 4m.
RLs were obtained using a Garmin GPSMAP 62 series handheld
GPS, which is adequate for the reconnaissance nature of the
exploration.
Data spacing for reporting of Exploration
No Mineral Resource and Ore Reserve estimation is reported in this
Results.
release.
Whether the data spacing and distribution is
sufficient to establish the degree of geological
•
Data spacing is variable due to the irregular distribution of outcrops
and grade continuity appropriate for the Mineral
and determined by the supervising geologist.
Resource and Ore Reserve estimation
•
The report to which this table relates does not contain any Mineral
procedure(s) and classifications applied.
Resource or Ore Reserve estimates
Whether sample compositing has been applied.
•
No sample compositing has been applied.
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
•
Rock chip sampling was conducted along the strike of targeted
structures or outcrops determined by the supervising geologist and
assisted by GPS and GIS polygons.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 11 of 15
Criteria
JORC Code explanation
geological
structure
•
Sample security
•
the extent to which this is known, considering
the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
Commentary
•
•
The measures taken to ensure sample security. •
•
•
Audits or reviews
The results of any audits or reviews of sampling •
techniques and data.
Sampling was also conducted perpendicular to the strike of the
targeted structures to explore for parallel structures.
No drilling was performed.
ACM site personnel with appropriate experience and knowledge
manage the chain of custody protocols for rock chip samples from
site to laboratory.
Samples were placed in numbered calico sample bags, secured in
polyweave sacks, and delivered by ACM personnel to LabWest for
analysis.
No audits or reviews undertaken.
Section 2. Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Mineral tenement
and land tenure
status
JORC Code explanation
•
•
Commentary
Type, reference name/number, location and
The Greater Cooletha exploration area is currently made up of
ownership including agreements or material
two licences E45/4990 (Cooletha) and E45/5228 (Cooletha South)
issues with third parties such as joint ventures, E45/4990 (Cooletha)
partnerships, overriding royalties, native title
•
E45/4990 was granted to Proterozoic Gold on the 24th of
interests, historical sites, wilderness or national
October 2019 for a period of 5 years. The licence at granting
park and environmental settings.
consisted of 39 blocks.
The security of the tenure held at the time of
•
On 27/03/2023, 100% of E45/4990 was acquired by Australian
reporting along with any known impediments to
Critical Minerals Ltd (ACM).
obtaining a licence to operate in the area.
•
The licence is currently due to expire on the 23 October 2024.
E45/5228 (Cooletha South)
•
•
•
E45/5228 was granted to Proterozoic Gold, a 100% subsidiary
of Great Southern Gold Pty, on 29 July 2019 for a period of 5
years. The licence at granting consisted of 40 blocks.
On 27/03/2023, 100% of E45/4990 was acquired by Australian
Critical Minerals Ltd (ACM).
The licence is currently due to expire on the 28th of July 2024.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 12 of 15
Criteria
JORC Code explanation
Commentary
E45/5006 (Shaw)
•
•
•
E45/5006 was granted to Proterozoic Gold, a 100% subsidiary
of Great Southern Gold Pty, on 4 July 2018 for a period of 5
years. An application was for renewal was accepted in 2023 for
a further 5 year period. The licence currently consists of 29
blocks.
On 27/03/2023, 100% of E45/4990 was acquired by Australian
Critical Minerals Ltd (ACM).
The licence is currently due to expire on the 3rd of July 2028.
Additionally, ACM has the following licences in applications.
•
•
•
Exploration done
by other parties
Geology
E45/5052 (Cooletha North), consisting of 5 blocks, is currently
in application. The application was submitted on 23 Oct 2017.
E45/6375 (Cooletha East), consisting of 42 blocks, is currently
in application. The application was submitted on 12 Oct 2022.
No impediments to granted tenure exist.
•
Acknowledgment and appraisal of exploration
by other parties.
Historical work conducted at Cooletha and Shaw that has been
reported to DMIRS was documented in the ACM IPO prospectus –
ASX:ACM 29 June 2023.
•
Deposit type, geological setting, and style of
mineralisation.
Cooletha Project
•
•
•
Deposit types – Lithium Caesium Tantalum (LCT) pegmatite,
Channel Iron Deposits.
Geological Setting – The project area straddles the southern
contact of the Pilbara craton and the Fortescue basin. The Split
Rock Supersuite and East Pilbara granitoid rocks are proposed
to be the likely source of the pegmatites that have been
emplaced into the mafic sequences of the Pilbara Supergroup
and Soansville group.
Style of Mineralisation – Li and Ta mineralisation is targeted in
highly fractionated pegmatites. Channel Iron Deposits above
the Fortescue Group and conglomerate hosted gold and
manganese shales at the base of the Fortescue Group.
Shaw Project
•
•
•
Deposit types – Banded Iron formation (BIF), conglomerate
hosted gold, Uranium
Geological Setting –
Share your feedback
Discover