Australian Critical Minerals (ASX: ACM, “Australian Critical Minerals” or “the Company”), is pleased to provide
the following report on its activities for the quarter ended 31 March 2025.
SUMMARY OF ACTIVITIES
Pilbara – Cooletha and Shaw Projects
The Pilbara portfolio covers 401 km2 and includes the Shaw and Cooletha Iron Ore Projects (Figure 1).
Figure 1 – Map of Pilbara projects
Shaw Project – Iron Ore
The Shaw Project is prospective for Iron Ore hosted in Banded Iron Formation (BIF). The Shaw Project is located
adjacent to Hancock Prospecting’s Abydos Iron Mine and south of Atlas Iron’s Miralga Creek Iron Ore Mine. The
Abydos host stratigraphy potentially extends into the Shaw tenements. The project benefits from its proximity to the
existing infrastructure at Abydos and Miralga Creek and its proximity to Port Hedland 100km north.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 1 of 11
BIF Discovery Process
In the previous quarter, the Company completed a rock chip sampling program at the Shaw Project, following an
initial reconnaissance program undertaken in September 2024.
Sampling returned high-grade results, including multiple samples exceeding 60% Fe, and identified a high-priority
focus zone within a +3km-long mapped BIF.
BIF units are concentrated within the structurally complex western side of the tenement. The Western BIF Zone,
which is the higher priority target, comprises of up to three sub-parallel horizons extending over 7km. The Eastern
BIF Zone has a strike length of approximately 6km, and has sub-parallel chert and minor BIF horizons. The Focus
Zone which hosts the +60% Fe results covers more than 70,000m2 and features steeply dipping formations,
indicating a strong potential for high-quality iron mineralisation.
The high-grade Fe zone identified at Shaw will aid ongoing exploration and the significant high-grade samples will
provide the basis of drill target locations.
Figure 2 – Shaw Rock Sample Results Thematic
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 2 of 11
Figure 3 – Massive Hematite Rock Sample from Shaw
Shaw Project – Uranium, Thorium
Mapping in the northern Shaw tenement identified extensive areas of conglomerates and sandstones that exhibit
pervasive green, yellow and pink washes. These areas were initially highlighted through a radiometric study, and
float grab samples were collected from creeks that drained the target areas as part of a first pass program which
aimed to maximise coverage while minimizing field time due to adverse weather conditions.
Assay results remain pending, a more thorough follow-up sampling program is being planned to further assess the
area’s potential.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 3 of 11
Figure 4 – Radiometric anomalies and sample locations northern Shaw
Cooletha Project
At Cooletha, ACM holds 251km2 of granted tenure and 150km2 of tenement applications with approximately half of
this area containing the stratigraphy of the Fortescue Group, which is prospective for CIDs. The Project is
strategically located north of Fortescue Metals Group’s (ASX: FMG) East Pilbara Complex and north-west of
Hancock Prospecting’s Roy Hill Mine. The Cooletha Project benefits from excellent access with BHP, FMG and
Hancock Prospecting’s rail infrastructure transecting the tenements (Figure 5).
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 4 of 11
Figure 5 – Overview of Cooletha, named CIDs, results, and proximal rail, camp and airstrip infrastructure
Recent sampling results at Cooletha highlight strong potential for high-quality iron ore deposits with multiple
outcropping Channel Iron Deposits (CIDs) returning Fe grades between 56% and 62%. Notably, 63% of samples
report Fe grades above 55%, with an average phosphorus content of just 0.04% and low levels of deleterious
elements in samples exceeding 45% Fe. These results, spanning a combined strike length of 7.7 km, highlight the
project’s strong beneficiation potential and support its capacity to deliver high-grade ore.
Table 1 – Averages of Key Elements at Cooletha
Fe %
Al2O3%
SiO2%
P%
56.5
4.92
4.58
0.04
Key discoveries include Mesa A, a standout CID at Cooletha West, featuring a 2 km strike length, up to 130 m in
width, and rising over 5 m above the surrounding terrain. Mesa A averages 54% Fe, with nine samples exceeding
60% Fe and a peak grade of 62%. Mesa E in Central Cooletha boasts a 3 km strike length, widths up to 300 m, and
thickness exceeding 10 m. Additional mesas across Cooletha, with strike lengths ranging from 300 m to 1 km,
collectively form a significant CID package.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 5 of 11
Figure 6 – Cooletha West CIDs, results, aerial photography and select hand samples
Field studies indicate that the true thickness of the Cooletha CIDs may be understated due to scree-covered slopes
obscuring the lower portions. Additionally, iron-rich regolith extending beyond Mesa A and other mesas, present
further exploration opportunities. The project's proximity to major rail infrastructure operated by Roy Hill, Fortescue
Metals Group, and BHP continues to enhance its development potential and positions it well for future strategic
partnerships.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 6 of 11
Figure 7 – Mesa A: Fe assay thematic showing the extensive +55% Fe region
CORPORATE
Withdrawal from Farm-In Agreement
During the quarter, the Company advised its formal notification to Kula Gold Limited of its decision to withdraw from
the farm-in agreement relating to the Rankin Dome Rare Earths Project (E 77/2768). Under the terms of the
agreement, the Company had the right to earn up to a 51% interest in the Project; however, following a strategic
review of its exploration activities, the Company has elected not to proceed. This decision allows ACM to focus its
resources on advancing its high-potential Pilbara iron ore assets, where recent exploration success has provided a
strong platform for future growth.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 7 of 11
Acquisition and Option Opportunities
The Company is aware of the re-evaluation of copper and gold assets in the current market. During the quarter, the
Company continues to assess available opportunities to generate shareholder value.
Financial
The Company’s cash position at 31 March 2025 was $1,431,762.
Additional ASX Information
Summary of Exploration Expenditure (ASX Listing Rule 5.3.1)
In accordance with Listing Rule 5.3.1, the Company advises the cash outflows on its mining exploration activities
reported in 1.2(1) of its Appendix 5B for the March 2025 quarter and detailed above were, Cooletha $63,086, Rankin
Dome $6,215 and other $8,484.
Mining Production and Development (ASX Listing Rule 5.3.2)
There were no substantive mining production and development activities during the quarter.
Payment to Related Parties (ASX Listing Rule 5.3.5)
The Company advises the payments in section 6.1 of Appendix 5B for the quarter related to director, company
secretarial and accounting fees.
Finance and Use of Funds (ASX Listing Rule 5.34)
Pursuant to ASX Listing Rule 5.34, the Company provides a comparison of its actual expenditure to the estimated
expenditure as set out in section 4.6 of the Company’s Prospectus.
Activity Description
Funds allocated
Actual to date (15 months)
Exploration (2 yrs)
$3,500,100
$637,071
Administration (2 yrs)
$974,791
$960,612
Repayment of Borrowings
$147,005
$147,005
Expenses of the Offer
$546,757
$546,757
The mining tenement interests acquired or relinquished during the quarter and their location:
Tenement Number
Project
Status Update
E 77/2768
Rankin Dome
Withdrawn from JV
Table 2 – Tenement portfolio changes
This release has been approved by the Board of Australian Critical Minerals Limited.
For further information, please contact:
Dean de Largie
Managing Director
Johnathon Busing
Company Secretary
Australian Critical Minerals Limited
E info@auscriticalminerals.com.au
T +61 (8) 6165 8858
Australian Critical Minerals Limited
E info@auscriticalminerals.com.au
T +61 (8) 6165 8858
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 8 of 11
About Australian Critical Minerals
Australian Critical Minerals is an exploration company focused on developing a quality portfolio of critical minerals
projects in Western Australia. The key projects are the Shaw and Cooletha (Pilbara) Lithium/Iron Projects.
Battery metals, including rare earths and lithium, are fundamental in the clean energy transition to net zero
transmissions. ACM intends to be pivotal in delivering the processed minerals needed for a clean energy future.
ACM has established a highly experienced management team with a proven record of exploration and corporate
success in the mining industry.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 9 of 11
Reference to Previous Announcements
Investors can refer to the Company’s previous News releases for further disclosure on information in this Announcement
and all of the Company’s Projects.
Competent Persons Statement
The information in this report related to Exploration Targets and Exploration Results is based on information compiled by
Mr. Dean de Largie. Mr. de Largie is the Managing Director of Australian Critical Minerals Limited and is a Fellow of the
Australian Institute of Geoscientists and has sufficient experience relevant to the styles of mineralisation under
consideration and to the activity being reported to qualify as a Competent Person as defined in the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr. de Largie has verified
the data disclosed in this release and consented to including the matters based on the information in the form and context
in which it appears.
Forward-Looking Statement
This news release contains “forward-looking information” within the meaning of applicable securities laws. Generally, any
statements that are not historical facts may contain forward-looking information. Forward looking information can be
identified by the use of forward-looking terminology such as “plans”, “expects”, or “does not expect”, “is expected”,
“budget” “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations
of such words and phrases or indicates that certain actions, events or results “may”, “could”, “would”, “might” or “will be”
taken, “occur” or “be achieved.” Forward-looking information is based on certain factors and assumptions management
believes to be reasonable at the time such statements are made, including but not limited to continued exploration
activities, commodity prices, the estimation of initial and sustaining capital requirements, the estimation of labour
costs, the estimation of mineral reserves and resources, assumptions concerning currency fluctuations, the timing
and amount of future exploration and development expenditures, receipt of required regulatory approvals, the
availability of necessary financing for the project, permitting and such other assumptions and factors as set out
herein.
Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the
actual results, level of activity, performance or achievements of the Company to be materially different from those
expressed or implied by such forward-looking information, including but not limited to: risks related to changes in
commodity prices; sources and cost of power and water for the Project; the estimation of initial capital requirements; the
lack of historical operations; the estimation of labour costs; general global markets and economic conditions; risks
associated with exploration of mineral deposits; the estimation of initial targeted mineral resource tonnage and grade
for the project; risks associated with uninsurable risks arising during the course of exploration; risks associated with
currency fluctuations; environmental risks; competition faced in securing experienced personnel; access to adequate
infrastructure to support exploration activities; risks associated with changes in the mining regulatory regime governing
the Company and the Project; completion of the environmental assessment process; risks related to regulatory and
permitting delays; risks related to potential conflicts of interest; the reliance on key personnel; financing, capitalisation and
liquidity risks including the risk that the financing necessary to fund continued exploration and development activities at
the project may not be available on satisfactory terms, or at all; the risk of potential dilution through the issuance of
additional common shares of the Company; the risk of litigation.
Although the Company has attempted to identify important factors that cause results not to be as anticipated, estimated,
or intended, there can be no assurance that such forward-looking information will prove to be accurate, as actual results
and future events could differ materially from those anticipated in such information. Accordingly, readers should not place
undue reliance on forward-looking information. Forward-looking information is made as of the date of this announcement.
The Company does not undertake to update or revise any forward-looking information included herein except in
accordance with applicable securities laws.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 10 of 11
TENEMENT INFORMATION (ASX Listing Rule 5.3.3)
The table below shows the interest in tenements held by Australian Critical Minerals and its wholly owned
subsidiaries and is provided in accordance with ASX Listing Rule 5.3.3.
COOLETHA PROJECT
Tenement ID
E 45/4990
E 45/5228
E 45/5052
E 45/6375
HOLDER
PROTEROZOIC GOLD PTY LTD
PROTEROZOIC GOLD PTY LTD
PROTEROZOIC GOLD PTY LTD
PROTEROZOIC GOLD PTY LTD
INTEREST
100%
100%
100%
100%
STATUS
GRANTED
GRANTED
PENDING
PENDING
24/10/2019
29/07/2019
-
GRANT DATE
AREA BLOCKS
39
40
5
42
SHAW PROJECT
Tenement ID
E 45/5006
HOLDER
INTEREST
STATUS
GRANT DATE
AREA
BLOCKS
PROTEROZOIC GOLD PTY LTD
100%
GRANTED
4/07/18
29
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 11 of 11
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Australian Critical Minerals Limited
ABN
Quarter ended (“current quarter”)
15 658 906 159
31 MARCH 2025
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(9 months)
$A’000
-
-
(109)
-
(507)
(c) production
-
-
(d) staff costs
(83)
(322)
(e) administration and corporate costs
(144)
(451)
(a) exploration & evaluation
(b) development
-
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
-
41
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (GST Refund)
40
73
1.9
Net cash from / (used in) operating
activities
(296)
(1,166)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) exploration & evaluation
-
-
(e) investments
-
-
(f)
-
-
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(9 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (cash balance of subsidiaries on
acquisition)
-
-
2.6
Net cash from / (used in) investing
activities
-
-
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
3.9
Other – Repayment of lease liability
Other – Cash items from financing activities
-
-
3.10
Net cash from / (used in) financing
activities
-
-
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
1,728
2,598
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(296)
(1,166)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
-
-
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(9 months)
$A’000
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
-
4.5
Effect of movement in exchange rates on
cash held
-
-
4.6
Cash and cash equivalents at end of
period
1,432
1,432
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
1,432
1,728
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,432
1,728
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
84
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(296)
8.4
Cash and cash equivalents at quarter end (item 4.6)
1,432
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
1,432
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
4.84
-
$A’000
(296)
-
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
n/a
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
n/a
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
n/a
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
30 April 2024
Authorised by: By the Board
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5
Share your feedback
Discover