ASX ANNOUNCEMENT
31 July 2024
QUARTERLY ACTIVITIES REPORT
Quarter Ended 30 June 2024
Highlights
Cooletha and Shaw Project
•
Completed mapping and sampling program focused on iron ore prospectivity on Cooletha and Shaw
Projects in the Pilbara
•
Identified a 42km strike length of combined Channel Iron Deposits (‘CID’) stratigraphy at Cooletha
•
Confirmed over 9 km strike length of Banded Iron Formation (‘BIF’) at Shaw
•
Detected a 10km Radiometric Anomaly in the northern part of the Shaw tenement
•
Results from rock samples from Cooletha and Shaw expected in Q3 CY2024
•
Future exploration programs will include soil sampling and geophysics
•
Company focused on testing the iron and energy potential of the tenement package
Rankin Dome Project
•
Completed preliminary leachability testing of selected Rankin Dome RC drill samples conducted by
Australia’s Nuclear Science and Technology Organisation (ANSTO)
•
Magnetic Rare Earth Oxides (‘MREO’) comprise up to 23% of Total Rare Earth Oxides (‘TREO’)
Beverley Project
•
Results up to 2119 ppm TREO from moderately weathered granitic drill samples.
Australian Critical Minerals (ASX: ACM, “Australian Critical Minerals” or “the Company”) a mineral exploration
company focused on the exploration and development of critical mineral projects in Western Australia, is pleased
to provide the following report on its activities for the quarter ended 30 June 2024. The Company is focused on the
iron and energy prospectivity of its large tenement package.
SUMMARY OF ACTIVITIES
Pilbara – Cooletha and Shaw Projects
The Pilbara Portfolio covers 494km2 including the Shaw and Cooletha Projects (see Figure 1).
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 1 of 13
Figure 1 – Map of Pilbara projects
Cooletha Project
At Cooletha, ACM holds 252km2 of granted tenure and 151km2 of tenement applications with approximately half of
this area containing the stratigraphy of the Fortescue Group, which is prospective for CIDs. The Cooletha Project is
located north of Fortescue Metals (ASX: FMG) East Pilbara Complex and north-west of Hancock Prospecting’s Roy
Hill Mine. The Cooletha Project has excellent infrastructure with both FMG and Hancock Prospecting’s rail
infrastructure transecting the tenements.
Figure 2 – Channel iron and regolith iron targets at Cooletha.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 2 of 13
CID Discovery Process
Integrated multispectral remote sensing interpretation generated CID and ferruginous regolith targets for field
investigation. The initial reconnaissance sampling of these targets and field observations have identified that
Cooletha contains strongly cemented goethitic pisolitic CID. Follow-up field mapping and reconnaissance rock chip
sampling are planned to extend the known footprint of the CIDs.
Integrated field mapping, analysis and
reconstruction of paleo-drainage systems may lead to the discovery of CIDs concealed beneath overlying
sedimentary units of the Fortescue Group. Initial reconnaissance rock sampling is to be followed by additional
systematic grid sampling (50m x 100m) of the approximately 45km of CID prospective stratigraphy.
Analogue - Bonnie Creek - WA
Bonnie Creek is a CID that reported a 2008 Mineral Resource Estimate of 47.2 Mt @ 53.6% Fe (BC Iron Annual
Report, 2008). The Bonnie Creek CIDs are also hosted in the Fortescue Group stratigraphy and have a total CID
strike length of approximately 10km (BC Iron Press Release 2 April 2009).
Analogue – Solomon and Serenity – WA
In 2005, Fortescue Metals Group (FMG) discovered a buried CID paleochannel system through target generation
and early-stage reconnaissance sampling (Kepert et al., 2010). This discovery by FMG, of approximately 30km
strike length of CIDs concealed beneath cover units of the Mt Bruce Supergroup, was developed into a world class
deposit containing 2.9Gt of detrital and bedded iron ore mineralisation (Kepert et al., 2010).
ACM is investigating the parallels between the exploration rationale at Solomon and Serenity and its application to
the forward work program at Cooletha; in particular, FMG’s discovery success highlights the potential for CIDs to
be concealed beneath overlying units of the Fortescue Group and how important it is to understand the paleo
drainage system and its implications for the exploration targeting process.
Shaw Project
The Shaw Project is prospective for Iron Ore, with potential in both Banded Iron Formation and as Channel Iron
Deposits. The Shaw Project is located adjacent to Hancock Prospecting’s Abydos Mine and south of Atlas Iron’s
Miralga Creek Iron Ore Mine. The Abydos host stratigraphy potentially extends into the Shaw tenements. The
project benefits from its proximity to existing infrastructure, including rail, and is located just 100km SSE of Port
Hedland.
BIF Discovery Process
ACM has further validated the extent of Shaw's BIF occurrences at the Shaw Project. Recent and historical
mapping, integrated with multispectral remote sensing interpretation, has identified several corridors of BIF targets
at Shaw. Consequently, ACM has been able to downgrade parts of the tenure and is now in a position to reduce
the tenement size at Shaw, as required by the tenement conditions.
During the quarter, ACM geologists conducted a first-round reconnaissance rock chip sampling program, confirming
the validity of the identified targets and that Shaw contains extensive BIF occurrences that are underexplored.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 3 of 13
Figure 3 – Shaw overview shows recent rock sample areas, the extent of BIF and U, Th radiometric anomaly
Figure 4 - Shaw BIF extent and rock samples showing both planar and brecciated BIF occurrences
Analogue – Miralga Creek Project – WA
At Miralga Creek, the Banded Iron Deposits (‘BID’) are up to 100m thick, consisting of units of BIF chert, shale and
sandstone segregated by thick layers of quartzites and meta-felsic sandstones. The operator views Miralga Creek
as an extension of the Abydos Mining Complex. This stratigraphic sequence passes through the northern part of
the Shaw tenement, where BIF units were identified during reconnaissance.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 4 of 13
In the structurally complex western side of the Shaw tenement, BIF units occur as linear, folded, and brecciated
formations. The western side hosts approximately 6km of BIF stratigraphy, while the eastern side contains over
3km (Figure 3). Field reconnaissance and preliminary spectral analysis have identified that the Shaw tenement may
contain at least nine satellite BIFs. Field observations at the Shaw Fe targets are analogous to the descriptions of
Miralga Creek Stratigraphy.
Shaw U Targets
ACM has identified a Uranium-Thorium radiometric anomaly within northern Shaw's pebble and boulder
conglomerates. This anomaly is strongly analogous to the quartz-pebble conglomerate hosting the Canadian Elliot
Lake Uranium deposits. The pebble-to-boulder conglomerate is 30m to 100m wide and extends for approximately
9km strike length in an east-west orientation in northern Shaw.
Visual identification of the conglomerate unit coincides with the high uranium and thorium radiometric anomaly. The
size of this anomaly is significant, and a comparison with the size of the Elliot Lake resource is shown in Figure 5.
Australia currently supplies 8% of global uranium production from three mines and holds about one-third of global
uranium resources. Public sentiment in Australia is increasingly recognizing the potential role of nuclear energy in
the country's future energy generation.
Figure 5 – Radiometric anomalies in Northern Shaw and Elliot Lake geology and size comparison
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 5 of 13
Future Works for Pilbara projects
The Company will assess follow-up work programs at Shaw and Cooletha that may include:
•
Grid sampling of the CID outcrops and scree slopes at Cooletha
•
Systematic sampling of the extensive broad BIF horizons identified recently at Shaw
•
Field investigation of the Shaw radiometric anomaly
•
Initial sampling and possibly ground geophysics at the northern Shaw radiometric anomaly
•
Reduction of the tenement size at Shaw to focus on areas that have higher prospectivity
Rankin Dome Rare Earth Project
The Rankin Dome Project comprises three exploration licences in the Youanmi Terrane near Southern Cross. ACM
has a farm-in agreement with Kula Gold Limited (ASX: KGD) to earn a 51% joint venture interest.
During the quarter, the Company announced preliminary leach test results from Australia’s Nuclear Science and
Technology Organisation (ANSTO) on selected samples from the RC drilling completed at Rankin Dome in
September 2023 (Figure 6).
Figure 6 – Location of Rankin Dome RC holes and summary ANTSO leach TREO results
Seven head samples (four composites and three individual samples) were prepared from 18 samples provided by
ACM. The seven head samples were crushed to pass 1mm, then a 400g subsample of each was pulverised, and
80g portions were selected for leach tests.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 6 of 13
Sample head grades ranged from 1148ppm to 1674ppm TREOs, with oxides of MREOs (Pr, Nd, Dy TB) comprising
21-23 per cent of TREOs (Table 1) significant for potential cost-effective magnetic separation recovery.
Two leach tests were conducted on each of the samples:
1. a desorption test comprising a leach at pH 4 and ambient temperature, using ammonium sulphate
as a lixiviant, typical of commercial rare earth extraction from ionic clay deposits in China and Myanmar;
2. an acid leach using 25g/L hydrochloric acid at 30°C for six hours.
Desorption tests revealed low TREO recoveries, indicating most rare earths are likely locked in refractory forms.
Table 1 – Rankin Dome RC Drilling, TREO Leach Diagnostics Summary
The results show that the samples had negligible proportions of ionically adsorbed REE, i.e. extractions very low
at pH 4. The TREE extractions were increased under acidic condition (Cl matrix, 25 g/L free acidity) except for
231-752-753 and 231-758-759 suggesting a different refractory mineralogy of those two samples. Although REE
extraction was increased significantly under 25 g/L acidity, the overall extractions were still low; with max
extraction of ~ 31% (231-167). The dissolution of gangue elements increased as the acidity was increased from
pH 4 to 25 g/L, with gangue dissolution at 25 g/L which is a relatively low value.
Future Works
Future work will focus on further investigation into rare earth mineralogy, variations in the weathering profile, and
the potential for beneficiation and concentration methods, such as magnetic separation, to improve rare earth
recoveries before applying more aggressive leach conditions.
Beverley Project
During the quarter, ACM reported results from historic aircore samples at the Beverley Project, aiming to evaluate
rare earth element enrichment in the slightly weathered zone beneath the kaolin-rich surface layer and down to the
mildly weathered bedrock. Previously only the kaolin-rich sections were analysed due to their commercial
significance.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 7 of 13
A total of 92 samples from 13 air-core drill holes were examined, with the best result being 1m at 2119ppm TREO
in drill hole BV015 from 18m depth. The average TREO value across all samples was 89 ppm (Figure 7 and Table
2).
Figure 7 – Location of Beverley Project historic aircore sampling and significant results
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 8 of 13
Table 2 – Beverley Project historic aircore sampling significant results
Future Works
The results from the historic aircore samples offer valuable insights that bolster the rationale for investigating subkaolin layers for rare earth oxide occurrences.
Kaolin Projects
ACM has conducted a strategic review of its kaolin assets within its tenement portfolio, including the Kojonup,
Kondinin and Beverly projects. Since ACM’s listing in July 2023, most ASX-listed peers evaluating kaolin projects
have experienced substantial declines in value. Many have shifted their focus to commodities with higher current
and projected demand, such as rare earths, uranium and lithium, and have relinquished or disposed of their kaolin
assets.
Due to weakened investor sentiment for kaolin, ACM recognises diminishing support for the exploration and
development of its kaolin assets. Consequently, ACM plans to reduce its focus on kaolin and increase its emphasis
on energy sectors, battery minerals and higher-value projects, including iron ore.
CORPORATE
The Company’s cash position at 30 June 2024 was $2,598,000
On 28 June 2024, the Company announced the appointment of Mr Kieran Witt as Joint Company Secretary,
replacing Ms Sylvie Broadway.
Additional ASX Information
Summary of Exploration Expenditure (ASX Listing Rule 5.3.1)
In accordance with Listing Rule 5.3.1, the Company advises the cash outflows on its mining exploration activities
reported in 1.2(1) of its Appendix 5B for the June 2024 quarter and detailed above were, Cooletha $53,584, Rankin
Dome $21,577, Shaw $25,602 and other $28,014.
Mining Production and Development (ASX Listing Rule 5.3.2)
There were no substantive mining production and development activities during the quarter.
Payment to Related Parties (ASX Listing Rule 5.3.5)
The Company advises the payments in section 6.1 of Appendix 5B for the quarter related to director, company
secretarial and accounting fees.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 9 of 13
Finance and Use of Funds (ASX Listing Rule 5.34)
Pursuant to ASX Listing Rule 5.34, the Company provides a comparison of its actual expenditure to the estimated
expenditure as set out in section 4.6 of the Company’s Prospectus.
Activity Description
Funds allocated
Actual to date (12 months)
Exploration (2 yrs)
$3,500,100
$1,068,309
Administration (2 yrs)
$974,791
$649,448*
Repayment of Borrowings
$147,005
$147,005
Expenses of the Offer
$546,757
$551,112
*Includes some staff costs which were not allocated to Exploration at the time of preparation
The mining tenement interests acquired or relinquished during the quarter and their location
Not applicable.
This release has been approved by the Board of Australian Critical Minerals Limited.
For further information, please contact:
Dean de Largie
Managing Director
Ben Creagh / Andrew Willis
Investor and Media Relations
Australian Critical Minerals Limited
E info@auscriticalminerals.com.au
T +61 (8) 6165 8858
NWR Communications
E benc@nwrcommunications.com.au
E awillis@nwrcommunications.com.au
About Australian Critical Minerals
Australian Critical Minerals is an exploration company focused on developing a quality portfolio of critical minerals
projects in Western Australia. The key projects are the Cooletha (Pilbara) Lithium Project and the Rankin Dome
(Southern Cross) Rare Earth Project. Battery metals, including rare earths and lithium are fundamental in the clean
energy transition to net zero transmissions. ACM intends to play a pivotal role in delivering the processed minerals
needed for a clean energy future. ACM has established a highly experienced management team with a proven track
record of exploration and corporate success in the mining industry.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 10 of 13
Reference to Previous Announcements
Investors can refer to the Company’s previous News releases for further disclosure on information in this Announcement
and all of the Company’s Projects.
Competent Persons Statement
The information in this report related to Exploration Targets and Exploration Results is based on information compiled by
Mr. Dean de Largie. Mr. de Largie is the Managing Director of Australian Critical Minerals Limited and is a Fellow of the
Australian Institute of Geoscientists and has sufficient experience relevant to the styles of mineralisation under
consideration and to the activity being reported to qualify as a Competent Person as defined in the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr. de Largie has verified
the data disclosed in this release and consented to including the matters based on the information in the form and context
in which it appears.
Forward-Looking Statement
This news release contains “forward-looking information” within the meaning of applicable securities laws. Generally, any
statements that are not historical facts may contain forward-looking information. Forward looking information can be
identified by the use of forward-looking terminology such as “plans”, “expects”, or “does not expect”, “is expected”,
“budget” “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations
of such words and phrases or indicates that certain actions, events or results “may”, “could”, “would”, “might” or “will be”
taken, “occur” or “be achieved.” Forward-looking information is based on certain factors and assumptions management
believes to be reasonable at the time such statements are made, including but not limited to continued exploration
activities, commodity prices, the estimation of initial and sustaining capital requirements, the estimation of labour
costs, the estimation of mineral reserves and resources, assumptions concerning currency fluctuations, the timing
and amount of future exploration and development expenditures, receipt of required regulatory approvals, the
availability of necessary financing for the project, permitting and such other assumptions and factors as set out
herein.
Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the
actual results, level of activity, performance or achievements of the Company to be materially different from those
expressed or implied by such forward-looking information, including but not limited to: risks related to changes in
commodity prices; sources and cost of power and water for the Project; the estimation of initial capital requirements; the
lack of historical operations; the estimation of labour costs; general global markets and economic conditions; risks
associated with exploration of mineral deposits; the estimation of initial targeted mineral resource tonnage and grade
for the project; risks associated with uninsurable risks arising during the course of exploration; risks associated with
currency fluctuations; environmental risks; competition faced in securing experienced personnel; access to adequate
infrastructure to support exploration activities; risks associated with changes in the mining regulatory regime governing
the Company and the Project; completion of the environmental assessment process; risks related to regulatory and
permitting delays; risks related to potential conflicts of interest; the reliance on key personnel; financing, capitalisation and
liquidity risks including the risk that the financing necessary to fund continued exploration and development activities at
the project may not be available on satisfactory terms, or at all; the risk of potential dilution through the issuance of
additional common shares of the Company; the risk of litigation.
Although the Company has attempted to identify important factors that cause results not to be as anticipated, estimated,
or intended, there can be no assurance that such forward-looking information will prove to be accurate, as actual results
and future events could differ materially from those anticipated in such information. Accordingly, readers should not place
undue reliance on forward-looking information. Forward-looking information is made as of the date of this announcement.
The Company does not undertake to update or revise any forward-looking information included herein except in
accordance with applicable securities laws.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 11 of 13
TENEMENT INFORMATION (ASX Listing Rule 5.3.3)
The table below shows the interest in tenements held by Australian Critical Minerals and its wholly owned
subsidiaries and is provided in accordance with ASX Listing Rule 5.3.3.
COOLETHA PROJECT
Tenement ID
E 45/4990
E 45/5228
E 45/5052
E 45/6375
HOLDER
PROTEROZOIC GOLD PTY LTD
PROTEROZOIC GOLD PTY LTD
PROTEROZOIC GOLD PTY LTD
PROTEROZOIC GOLD PTY LTD
INTEREST
100%
100%
100%
100%
STATUS
GRANTED
GRANTED
PENDING
PENDING
24/10/2019
29/07/2019
-
GRANT DATE
AREA BLOCKS
39
40
5
42
STATUS
GRANT DATE
AREA
BLOCKS
GRANTED
8/10/2021
55
GRANTED
8/10/2021
22
GRANTED
26/03/2021
36
AREA
BLOCKS
29
RANKIN DOME PROJECT
Tenement ID
HOLDER
E 77/2709
KULA GOLD LIMITED
E 77/2753
KULA GOLD LIMITED
E 77/2768
KULA GOLD LIMITED
INTEREST
EARNING
51%
EARNING
51%
EARNING
51%
SHAW PROJECT
Tenement ID
E 45/5006
HOLDER
INTEREST
STATUS
GRANT DATE
PROTEROZOIC GOLD PTY LTD
100%
GRANTED
4/07/18
BEVERLEY PROJECT
Tenement ID
HOLDER
INTEREST
STATUS
GRANT DATE
E 70/5574
NEWNATION HOLDINGS PTY LTD
100%
GRANTED
24/03/2021
AREA
BLOCKS
34
E 70/6148
NEWNATION HOLDINGS PTY LTD
100%
GRANTED
22/08/2022
5
KONDININ PROJECT
Tenement ID
HOLDER
INTEREST
STATUS
GRANT DATE
E 70/5608
EVEXTRA PTY LTD
100%
GRANTED
28/04/2021
AREA
BLOCKS
10
E 70/5609
EVEXTRA PTY LTD
100%
GRANTED
28/04/2021
19
E 70/5610
EVEXTRA PTY LTD
100%
GRANTED
28/04/2021
45
KOJONUP PROJECT
Tenement ID
HOLDER
INTEREST
STATUS
GRANT DATE
E 70/5772
BAYZEPHYR PTY LTD
100%
GRANTED
16/07/2021
AREA
BLOCKS
22
E 70/5773
BAYZEPHYR PTY LTD
100%
GRANTED
16/07/2021
54
E 70/5774
BAYZEPHYR PTY LTD
100%
GRANTED
19/07/2021
5
E 70/5775
BAYZEPHYR PTY LTD
100%
GRANTED
19/07/2021
43
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 12 of 13
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 13 of 13
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Australian Critical Minerals Limited
ABN
Quarter ended (“current quarter”)
15 658 906 159
30 June 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(12 months)
$A’000
-
-
(129)
(1,068)
(b) development
-
-
(c) production
-
-
(d) staff costs
(71)
(288)
(e) administration and corporate costs
(117)
(584)
-
-
32
103
(a) exploration & evaluation
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (GST Refund)
31
121
1.9
Net cash from / (used in) operating
activities
(254)
(1,716)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
(41)
(c) property, plant and equipment
-
-
(d) exploration & evaluation
-
-
(e) investments
-
-
(f)
-
-
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (cash balance of subsidiaries on
acquisition)
-
-
2.6
Net cash from / (used in) investing
activities
-
(41)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
87
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(587)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
(147)
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
3.9
Other – Repayment of lease liability
Other – Cash items from financing activities
-
-
3.10
Net cash from / (used in) financing
activities
-
(647)
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
2,852
5,003
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(254)
(1,716)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
-
(41)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(12 months)
$A’000
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
(647)
4.5
Effect of movement in exchange rates on
cash held
-
-
4.6
Cash and cash equivalents at end of
period
2,598
2,598
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
2,598
2,853
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
2,598
2,853
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
84
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(254)
8.4
Cash and cash equivalents at quarter end (item 4.6)
2,598
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
2,598
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
10.22
-
$A’000
(254)
-
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
n/a
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
n/a
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
n/a
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow re
Share your feedback
Discover