ASX ANNOUNCEMENT
29 April 2024
QUARTERLY ACTIVITIES REPORT
Quarter Ended 31 March 2024
Highlights
Cooletha Project
•
Scale potential of the Cooletha Pegmatite Fields (CPFs) developing following rock sampling
reconnaissance and field checking of twelve multi-spectral targets completed at Cooletha Project
•
169 rock samples collected in a second rock chip sampling program advancing geological
understanding
•
Pegmatites identified at surface contributing to the ongoing development of our geological exploration
model
•
Favourable regional-scale geological settings conducive to hosting lithium pegmatites identified
•
Systematic soil sampling planned on a regional scale (1 km x 0.5 km grid) across the Goldilocks Zone
•
Follow-up in-fill soils targeting regional soil anomalies and subdued topography between silica ridges
Rankin Dome Project
•
Preliminary leachability testing of selected Rankin Dome RC drill samples completed by Australia’s
Nuclear Science and Technology Organisation (ANSTO)
•
Magnetic Rare Oxides (MREO) comprise up to 23% of Total Rare Earth Oxides (TREO)
Beverley Project
•
Results up to 2119 ppm TREO from moderately weathered granitic drill samples
Australian Critical Minerals (ASX: ACM, “Australian Critical Minerals” or “the Company”) a mineral exploration
company focused on the exploration and development of critical mineral projects in Western Australia, is pleased
to provide the following report on its activities for the quarter ended 31 March 2024.
SUMMARY OF ACTIVITIES
Cooletha Lithium Project
The Cooletha Project is the Company’s flagship lithium project, with over 100km 2 of prospective ground in the
Pilbara. The Project is located south of significant discoveries at Pilbara Minerals’ (ASX:PLS) Pilgangoora Lithium
Project (223Mt @ 1.25% Li2O), MinRes’ (ASX:MIN) Wodgina Lithium Project (259Mt @ 1.17% Li2O), and Global
Lithium Resources’ (ASX:GL1) Archer Lithium Deposit at Marble Bar (18Mt @ 1% L2iO) (Figure 1). The central
and eastern side of the Cooletha Project covers the southern extension of the Soansville Group which hosts both
Pilbara Minerals Pilgangoora and Mineral Resources Wodgina Lithium Projects.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 1 of 13
Figure 1 – The location of the Cooletha Lithium Project in the Pilbara region, Western Australia.
During the quarter, ACM’s geological exploration team undertook a second rock chip reconnaissance sampling
program at Cooletha. The team utilised a helicopter to access the remote terrain, supported by complementing
strategically stationed vehicles where preliminary analysis of the samples was conducted using PXRF and LIBS.
Results from the 169 rock samples collected confirmed the presence of multiple pegmatite fields, situated within
and proximal to areas pinpointed by the recent Cooletha Integrated Multispectral Interpretation study. Further,
geochemical analysis, looking at the fertility and fractionation of the sampled pegmatites, is warranted.
The distribution of pegmatites identified in the 2024 rock chip program with sample locations from ACM's 2023
sampling program is shown in Figure 2. A regional 1km x 0.5km soil grid program is planned to test multiple targets
and delineate the extents of the pegmatite fields.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 2 of 13
Figure 2 – The location of the Pegmatite Fields and sampling at the Cooletha Lithium Project
The results from the systematic exploration programs at Cooletha indicate the scale and geochemistry of the CPF.
Leveraging an integrated multi-spectral interpretation, a weathered pegmatite model, and the expertise of a
seasoned exploration geologist specializing in pegmatites, the 2024 sampling campaign has unearthed three
previously unidentified pegmatite fields. This has significantly enhanced our comprehension of the project's
potential.
The scale of the CPF, coupled with surface expression similarities to other advanced pegmatite fields, presents a
compelling case for further investigation. Currently, ACM's CPF mineral system scale remains largely unexplored.
Multiple pegmatites occurrences and fifteen multi-spectral based targets await ground truthing and assessment
through soil programs, geochemical analysis, and subsequent drill testing.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 3 of 13
Figure 3 – Silica rich pegmatite ridges forming the lateral extents of a weathered subdued topographic low
representing the inner zone of the pegmatite intrusion.
Target Area F (Figure 3) is an example of coincident multispectral anomalism and photo-interpreted quartz ridges.
This area provides an example of a recessed pegmatite. The pegmatite formed a flattened hilltop, with two Quartz
Rich Border Zones (QRBZ) on the hill's flanks. Sample 10110 is of the QRBZ and is typified by a rock composed
of coarse-grained quartz with minor feldspar and/or mica.
Kaolinitic clays, quartz scree and muscovite flakes are often observed on a weathered pegmatite's surface; at this
location, quartz scree was dominant with lesser feldspar. This pegmatite geometry can be clearly seen in Photo A;
here, the pegmatite and QRBZ have a lozenge shape that is commonly observed in many pegmatite fields. Photo
B demonstrates the anastomosing nature of the pegmatite; here, the pegmatite pinches down, and the two QRBZ
coalesce into one quartz ridge.
The exploration model (Figure 4) displays a recessive pegmatite forming a flattened topographic feature or flat
hilltop; the surface material observed at these weathered pegmatites is typically composed of kaolinitic clays, quartz
scree and flakes of muscovite.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 4 of 13
Figure 4 – Conceptual Recessed Pegmatite Block Model
The Quartz Rich Border Zone (QRBZ) typically occurs on the contact of the pegmatite with the host rocks. These
QRBZ produce resistive ridges that form topographic highs and hold up the recessive pegmatites. The inverse of
this scenario was also observed within the CPF, where a pegmatite lacking prominent QRBZ formed a subtle
topographic high sub-cropping on a gently sloping plain. The borders of this pegmatite are only defined by the
cessation of the quartz, kaolin and mica gravels, sands and clays that litter the surface. Systematic soil sampling
programs are one tried and tested method to define the true near-surface footprint and provide geochemical data
to assess the fertility of a recessed pegmatite.
Pegmatites often occur in swarms or clusters, and this conceptual exploration model presents an example of a
buried pegmatite adjacent to the exposed pegmatite. Concealed pegmatites like those shown in the conceptual
block model require drill testing to be discovered. They are often intersected by drilling that targets an adjacent
pegmatite exposed at the surface.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 5 of 13
Future Works
The Company will assess follow-up work programs that may include:
•
Systematic soil sampling programs on a regional scale (1 km x 0.5 km grid) across the Goldilocks Zone to
identify and rank anomalous CPF targets.
•
Infill anomalous soil results with a close-spaced soil sampling program (100 m x 50 m grid).
•
Geochemical analysis of the soil and rock chip data to determine the fertility of CPF and to vector towards
areas of higher fractionation.
•
Surface investigation of the soil anomalies, map and collect rock chip samples from any exposed pegmatites.
•
RC drilling program to test the most prospective surface geochemical anomalism.
•
Advance exploration efforts over the areas within both Cooletha and Shaw which are prospective for Channel
Iron Deposits and Banded Iron Formations.
Rankin Dome Rare Earth Project
The Rankin Dome Project consists of three exploration licences in the Youanmi Terrane near Southern Cross. The
Company has a farm-in agreement with Kula Gold Limited (ASX: KGD) to earn a 51% joint venture interest.
Post quarter, the Company announced results from Australia’s Nuclear Science and Technology Organisation
(ANSTO) from preliminary leach tests conducted on selected samples from the RC drilling completed at Rankin
Dome in September 2023 (Figure 5).
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 6 of 13
Figure 5 – Location of Rankin Dome RC holes and summary ANTSO leach TREO results
Seven head samples (four composites and three individual samples) were prepared out of 18 samples provided by
ACM. The seven head samples were crushed to pass 1mm, then a 400g subsample of each was pulverised, and
80g portions were selected for leach tests.
Sample head grades ranged from 1148ppm to 1674ppm TREO, with oxides of magnet rare earths (Pr, Nd, Dy TB)
comprising 21-23 per cent of total rare earth oxides (Table 1). The proportion of magnetic REOs is important as
cost-effective magnetic separation methods can recover the magnetic rare earths. Two leach tests were undertaken
on each of the samples:
1. a desorption test comprising a leach at pH 4 and ambient temperature conditions using ammonium sulphate
as a lixiviant, typical of leach conditions applied in commercial extraction of rare earths from ionic clay deposits
in China and Myanmar;
2. an acid leach using 25g/L hydrochloric acid at 30° C for six hours
The desorption tests revealed low TREO (Total Rare Earth Oxides) recoveries, suggesting that only a small portion
of desorbable rare earths is present in the samples, while the majority is likely locked in refractory forms.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 7 of 13
15
Head
TREO
(ppm)
1663
Mag
REO
(ppm)
407
Light
REO
(ppm)
1525
Heavy
REO
(ppm)
137.9
Mag
REO
(%)
Heavy
REO
(%)
1.1
Recovery
25g/L
HCL (%)
12.9
23.2
7.8
10
11
1674
427
1454
219.6
0.5
30.8
21.7
11.2
RDRC003
19
20
1148
270
1058
90.3
1.6
20.1
22.2
7.4
RDRC004
12
13
1154
294
1019
134.8
0.7
14.8
22.7
10.4
RDRC005
8
10
1413
298
1348
65.1
0.4
0.7
RDRC005
14
20.7
4.5
16
1475
349
1384
90.8
0.4
0.6
RDRC005
24
23.1
6.0
30
1449
346
1320
129.4
1.1
10.7
22.0
8.2
Hole ID
From
(m)
To
(m)
RDRC001
11
RDRC002
Recovery
pH4 (%)
Table 1 – Rankin Dome RC Drilling, TREO Leach Diagnostics Summary
Future Works
Further investigation into the rare earth mineralogy is required to ascertain potential variations with depth in the
weathering profile or across different zones within the expansive TREO anomaly identified at Rankin Dome.
Additionally, there exists an opportunity to improve rare earth recoveries through a method of beneficiation and
concentration, such as magnetic separation, prior to applying more aggressive lower pH leach conditions.
Beverley Project
Post quarter, ACM announced results from historic aircore samples from the Beverley Project. These samples were
investigated to assess the potential enrichment of rare earth elements in the slightly weathered zone beneath the
heavily weathered kaolin-rich surface layer, extending down to the mildly weathered bedrock. Previously only the
kaolin-rich sections were analysed due to their commercial significance.
92 samples from 13 air-core drill holes returned a best result of 1m at 2119ppm TREO in drill hole BV015 from 18m.
The average TREO value over all samples was 89 ppm, Refer Figure 6 and Table 2.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 8 of 13
Figure 6 – Location of Beverley Project historic aircore sampling and significant results
Table 2 – Beverley Project historic aircore sampling significant results
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 9 of 13
Future Works
The results from the historic aircore samples offer valuable insights that bolster the rationale for investigating subkaolin layers for rare earth oxide occurrences. In future drilling programs at Beverley, ACM will endeavor to
penetrate beyond the kaolin zones to test rare earth concentrations.
CORPORATE
The Company’s cash position at 31 March 2024 was $2,853,000
The Company released the Half-Year accounts on 15 March 2024.
Additional ASX Information
Summary of Exploration Expenditure (ASX Listing Rule 5.3.1)
In accordance with Listing Rule 5.3.1, the Company advises the cash outflows on its mining exploration activities
reported in 1.2(1) of its Appendix 5B for the March 2024 quarter and detailed above were, Cooletha $215,705,
Rankin Dome $72,460, Shaw $49,938 and other $2,895.85.
Mining Production and Development (ASX Listing Rule 5.3.2)
There were no substantive mining production and development activities during the quarter.
Payment to Related Parties (ASX Listing Rule 5.3.5)
The Company advises the payments in section 6.1 of Appendix 5B for the quarter related to director, company
secretarial and accounting fees.
Finance and Use of Funds (ASX Listing Rule 5.34)
Pursuant to ASX Listing Rule 5.34, the Company provides a comparison of its actual expenditure to the estimated
expenditure as set out in section 4.6 of the Company’s Prospectus.
Activity Description
Funds allocated
Actual to date (9 months)
Exploration (2 yrs)
$3,500,100
$939,532
Administration (2 yrs)
$974,791
$523,973
Repayment of Borrowings
$147,005
$147,005
Expenses of the Offer
$546,757
$551,112
The mining tenement interests acquired or relinquished during the quarter and their location
Not applicable.
This release has been approved by the Board of Australian Critical Minerals Limited.
For further information, please contact:
Dean de Largie
Managing Director
Ben Creagh / Andrew Willis
Investor and Media Relations
Australian Critical Minerals Limited
E info@auscriticalminerals.com.au
T +61 (8) 6165 8858
NWR Communications
E benc@nwrcommunications.com.au
E awillis@nwrcommunications.com.au
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 10 of 13
Reference to Previous Announcements
Investors can refer to the Company’s Prospectus and previous News releases for further disclosure on information in this
Announcement and all of the Company’s Projects.
Competent Persons Statement
The information in this report related to Exploration Targets and Exploration Results is based on information compiled by Mr.
Dean de Largie. Mr. de Largie is the Managing Director of Australian Critical Minerals Limited and is a Fellow of the Australian
Institute of Geoscientists and has sufficient experience relevant to the styles of mineralisation under consideration and to the
activity being reported to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves. Mr. de Largie has verified the data disclosed in this release and
consented to including the matters based on the information in the form and context in which it appears.
Forward Statement
This news release contains “forward-looking information” within the meaning of applicable securities laws. Generally, any
statements that are not historical facts may contain forward-looking information. Forward looking information can be identified
by the use of forward-looking terminology such as “plans”, “expects”, or “does not expect”, “is expected”, “budget” “scheduled”,
“estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases
or indicates that certain actions, events or results “may”, “could”, “would”, “might” or “will be” taken, “occur” or “be achieved.”
Forward-looking information is based on certain factors and assumptions management believes to be reasonable at the time
such statements are made, including but not limited to continued exploration activities, commodity prices, the estimation of initial
and sustaining capital requirements, the estimation of labour costs, the estimation of mineral reserves and resources,
assumptions concerning currency fluctuations, the timing and amount of future exploration and development expenditures,
receipt of required regulatory approvals, the availability of necessary financing for the project, permitting and such other
assumptions and factors as set out herein.
Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual
results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied
by such forward-looking information, including but not limited to: risks related to changes in commodity prices; sources and cost
of power and water for the Project; the estimation of initial capital requirements; the lack of historical operations; the estimation
of labour costs; general global markets and economic conditions; risks associated with exploration of mineral deposits; the
estimation of initial targeted mineral resource tonnage and grade for the project; risks associated with uninsurable risks arising
during the course of exploration; risks associated with currency fluctuations; environmental risks; competition faced in securing
experienced personnel; access to adequate infrastructure to support exploration activities; risks associated with changes in the
mining regulatory regime governing the Company and the Project; completion of the environmental assessment process; risks
related to regulatory and permitting delays; risks related to potential conflicts of interest; the reliance on key personnel; financing,
capitalisation and liquidity risks including the risk that the financing necessary to fund continued exploration and development
activities at the project may not be available on satisfactory terms, or at all; the risk of potential dilution through the issuance of
additional common shares of the Company; the risk of litigation.
Although the Company has attempted to identify important factors that cause results not to be as anticipated, estimated or
intended, there can be no assurance that such forward-looking information will prove to be accurate, as actual results and future
events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance
on forward-looking information. Forward-looking information is made as of the date of this announcement. The Company does
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 11 of 13
not undertake to update or revise any forward-looking information included herein except in accordance with applicable securities
laws.
About Australian Critical Minerals
Australian Critical Minerals is an exploration company focused on developing a quality portfolio of critical minerals
projects in Western Australia. The key projects are the Cooletha (Pilbara) Lithium Project and the Rankin Dome
(Southern Cross) Rare Earth Project. Battery metals, including rare earths and lithium are fundamental in the clean
energy transition to net zero transmissions. ACM intends to play a pivotal role in delivering the processed minerals
needed for a clean energy future. ACM has established a highly experienced management team with a proven track
record of exploration and corporate success in the mining industry.
TENEMENT INFORMATION (ASX Listing Rule 5.3.3)
The table below shows the interest in tenements held by Australian Critical Minerals and its wholly owned
subsidiaries and is provided in accordance with ASX Listing Rule 5.3.3.
COOLETHA PROJECT
Tenement ID
E 45/4990
E 45/5228
E 45/5052
E 45/6375
HOLDER
PROTEROZOIC GOLD PTY LTD
PROTEROZOIC GOLD PTY LTD
PROTEROZOIC GOLD PTY LTD
PROTEROZOIC GOLD PTY LTD
INTEREST
100%
100%
100%
100%
STATUS
GRANTED
GRANTED
PENDING
PENDING
GRANT DATE
24/10/2019
29/07/2019
-
AREA BLOCKS
39
40
5
42
STATUS
GRANT DATE
AREA
BLOCKS
GRANTED
8/10/2021
55
GRANTED
8/10/2021
22
GRANTED
26/03/2021
36
AREA
BLOCKS
29
RANKIN DOME PROJECT
Tenement ID
HOLDER
E 77/2709
KULA GOLD LIMITED
E 77/2753
KULA GOLD LIMITED
E 77/2768
KULA GOLD LIMITED
INTEREST
EARNING
51%
EARNING
51%
EARNING
51%
SHAW PROJECT
Tenement ID
E 45/5006
HOLDER
INTEREST
STATUS
GRANT DATE
PROTEROZOIC GOLD PTY LTD
100%
GRANTED
4/07/18
BEVERLEY PROJECT
Tenement ID
HOLDER
INTEREST
STATUS
GRANT DATE
E 70/5574
NEWNATION HOLDINGS PTY LTD
100%
GRANTED
24/03/2021
AREA
BLOCKS
34
E 70/6148
NEWNATION HOLDINGS PTY LTD
100%
GRANTED
22/08/2022
5
AREA
BLOCKS
10
KONDININ PROJECT
Tenement ID
E 70/5608
HOLDER
INTEREST
STATUS
GRANT DATE
EVEXTRA PTY LTD
100%
GRANTED
28/04/2021
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 12 of 13
E 70/5609
EVEXTRA PTY LTD
100%
GRANTED
28/04/2021
19
E 70/5610
EVEXTRA PTY LTD
100%
GRANTED
28/04/2021
45
KOJONUP PROJECT
Tenement ID
HOLDER
INTEREST
STATUS
GRANT DATE
E 70/5772
BAYZEPHYR PTY LTD
100%
GRANTED
16/07/2021
AREA
BLOCKS
22
E 70/5773
BAYZEPHYR PTY LTD
100%
GRANTED
16/07/2021
54
E 70/5774
BAYZEPHYR PTY LTD
100%
GRANTED
19/07/2021
5
E 70/5775
BAYZEPHYR PTY LTD
100%
GRANTED
19/07/2021
43
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 13 of 13
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Australian Critical Minerals Limited
ABN
Quarter ended (“current quarter”)
15 658 906 159
31 March 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(9 months)
$A’000
-
-
(341)
(939)
(b) development
-
-
(c) production
-
-
(d) staff costs
(73)
(217)
(e) administration and corporate costs
(84)
(467)
-
-
65
71
(a) exploration & evaluation
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (GST Refund)
28
90
1.9
Net cash from / (used in) operating
activities
(405)
(1,462)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
(41)
(c) property, plant and equipment
-
-
(d) exploration & evaluation
-
-
(e) investments
-
-
(f)
-
-
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(9 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (cash balance of subsidiaries on
acquisition)
-
-
2.6
Net cash from / (used in) investing
activities
-
(41)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
87
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(587)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
(147)
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
3.9
Other – Repayment of lease liability
Other – Cash items from financing activities
-
-
3.10
Net cash from / (used in) financing
activities
-
(647)
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
3,258
5,003
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(405)
(1,462)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
-
(41)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(9 months)
$A’000
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
(647)
4.5
Effect of movement in exchange rates on
cash held
-
-
4.6
Cash and cash equivalents at end of
period
2,853
2,853
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
2,853
3,258
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
2,853
3,258
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
107
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(405)
8.4
Cash and cash equivalents at quarter end (item 4.6)
2,853
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
2,853
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
7.04
-
$A’000
(405)
-
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
n/a
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
n/a
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
n/a
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
29 April 2024
Authorised by: By the Board
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report.