Maiden Lithium Program at Cooletha Confirms
Spodumene Mineralisation
Highlights
•
Maiden campaign successfully completed at Cooletha Project in the Pilbara, Western Australia
•
Highly encouraging mineralisation identified:
– Visible spodumene sites discovered on E45/4990
– Manganese mineralisation identified on E45/5228
•
Reconnaissance has covered approximately 15% of the pegmatite prospective region
•
First batch of 94 rock samples from Cooletha submitted to laboratory with results expected in 6-8
weeks
•
Reconnaissance sampling and mapping continues at Cooletha
•
Further samples in transit and expected to be submitted to Labwest next week
•
At Rankin Dome, upcoming drill program reviewed and landowner engagement has been undertaken
•
Planned drilling programs to consist of Reverse Circulation (RC), aircore and auger drilling targeting
several REE anomalous areas within the large Rankin Dome Project area
Australian Critical Minerals (ASX:ACM, “ACM” or “the Company”) is pleased to announce its maiden
exploration program has been successfully completed at its Cooletha Lithium Project in the Pilbara region,
Western Australia. ACM is a newly listed explorer focused on developing high-value lithium and rare earth
projects in Western Australia.
Managing Director, Dean de Largie said,
“We are delighted to have completed our maiden exploration campaign at the Cooletha Lithium Project so
quickly after our IPO was finalised in July this year. We are very encouraged by the visible spodumene
identified during this program and whilst we wait for the results of the first batch of rock samples within 6-8
weeks, reconnaissance sampling will continue. Having only covered 15% of the prospective pegmatite
region so far, we are excited about the potential for exploration success.
We are also eagerly anticipating the commencement of our first drilling program at Rankin Dome which will
target anomalous rare earth prospects. Final approvals and landowner access to allow this program to
begin are imminent.”
Cooletha Lithium Project, Pilbara
The Cooletha Lithium Project, ACM’s flagship lithium project, has over 100km2 of lithium prospectivity with
outcropping pegmatite swarms in the Pilbara lithium district. The Project is located south of significant discoveries
at Pilbara Minerals’ (ASX:PLS) Pilgangoora Lithium Project (223Mt @ 1.25% Li2O), Mineral Resources’
(ASX:MIN) Wodgina Lithium Project (259Mt @ 1.17% Li2O), and Global Lithium Resources’ (ASX:GL1) Archer
Lithium Deposit at Marble Bar (18Mt @ 1% Li2O) (Figure 1).
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 1 of 13
The Cooletha Project also sits 30km south of the Tambourah Lithium Project owned by Trek Metals (ASX:TKM),
which has commenced its maiden 3,800m drill campaign following up on rock chip results up to 3.02% Li2O.
Figure 1 – The location of the Cooletha Lithium Project in the Pilbara region, Western Australia.
Since listing in early July, ACM has engaged Geolithic Pty Ltd, a specialist remote exploration consultancy to
provide initial reconnaissance sampling and mapping over the Cooletha Project (Figure 2).
Figure 2 – Remote exploration equipment and personnel provided by Geolithic and Allied Rock Pty Ltd on
the eastern side of the Cooletha tenement
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 2 of 13
Initial work has focused on the most accessible regions of the Project in the north-west and south-east of the
tenement (Figure 3).
Figure 3 – Initial sampling focus area of NW and SE regions of Cooletha
Several spodumene pegmatites have been identified and sampled through this initial phase. They are in the NW
sector of the Cooletha Project on E45/4990. The pegmatites outcrop as dykes and sills of very coarse-grained
orthoclase-quartz pegmatite with a crystal size up to 30cm. They are hosted within the Tambourah Monzogranite.
The spodumene sites have been designated as Echo Valley and Burnt Ridge and will form the sites of more
intense sampling going forward (Figures 4,5,6).
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 3 of 13
Figure 4 – Echo Valley Spodumene Pegmatite
Figure 5 – Burnt Ridge Spodumene Pegmatite
Figure 6 – Burnt Ridge Spodumene Pegmatite
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 4 of 13
The Echo Valley and Burnt Ridge sites are approximately 1km apart and are both west of the prospective
pegmatite regions identified during ACM’s pre-IPO due diligence (Figure 7). Further sampling is planned within
the northern region extending the sampled area west and east of these two sites.
Figure 7– Location of Echo Valley and Burnt Ridge
In the southeast of Cooletha on E45/5228, reconnaissance sampling has occurred across approximately 10km2,
with 23 samples from this area (Figure 8). Pegmatitic rocks extend several kilometers north of the sampled area
and presents substantial opportunity to extend the currently sampled area.
Manganese shales associated with the basal Fortesque Group unconformity have been identified and provide an
additional valuable exploration target to the Cooletha Project. The manganiferous shales are 1m to 3m thick with
the two samples collected 1km apart. Several kilometers to the east just outside of the tenement boundary a thin
manganiferous shallow dipping bed was identified during ACM’s pre-IPO reconnaissance. It is thus anticipated
that the manganese shale unit may be widespread in this region. The basal manganese shale unit will be further
sampled along the convoluted unconformity contact to determine the extent of the preserved sections and to
prepare an exploration program focused on this opportunity (Figure 9).
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 5 of 13
Figure 8 – Southwest pegmatites are interspersed with mesas of CIDs
Figure 9 – Significant hematite-rich channel iron deposit ridges overlying basal unconformity hosting
manganese rich shales
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 6 of 13
Rankin Dome, Southern Cross
The Rankin Dome Project, prospective for Rare Earth Elements, is located in Youami Terrane near Southern
Cross, an established mining centre. The Project is held in a JV with Kula Gold Ltd (ASX: KGD) for ACM to earn
51% interest.
ACM has completed a positive review of an upcoming drill program planned at Rankin Dome and has undertaken
landowner engagement. The planned drilling programs will incorporate Reverse Circulation (RC), aircore and
auger drilling to best suit the geomorphology of the various anomalous areas within the large Rankin Dome
Project. There will be a further update on the Rankin Dome drilling program as planning towards commencing this
campaign progresses.
This release has been approved by the Board of Australian Critical Minerals Limited.
For further information, please contact:
Dean de Largie
Managing Director
Ben Creagh / Andrew Willis
Investor and Media Relations
Australian Critical Minerals Limited
E info@auscriticalminerals.com.au
NWR Communications
E benc@nwrcommunications.com.au
awillis@nwrcommunications.com.au
About Australian Critical Minerals
Australian Critical Minerals is an exploration company focused on developing a quality portfolio of critical
minerals projects in Western Australia. The key projects are Cooletha (Pilbara) Lithium Project and Rankin Dome
(Southern Cross) Rare Earth Project.
Battery metals, including rare earths and lithium are fundamental in the clean energy transition to net zero
transmissions. ACM intends to play a pivotal role in delivering the processed minerals needed for a clean energy
future.
ACM has established a highly experienced management team with a proven track record of exploration and
corporate success in the mining industry.
Reference to Previous Announcements
Investors can refer to the Company’s Prospectus for further disclosure on information in this Announcement and all of the
Company’s Projects.
Competent Persons Statement
The information in this report that relates to Exploration Targets and Exploration Results is based on information compiled by
Mr. Dean de Largie. Mr. de Largie is the Managing Director of Australian Critical Minerals Limited and is a Fellow of the Australian
Institute of Geoscientists and has sufficient experience relevant to the styles of mineralisation under consideration and to the
activity being reported to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves. Mr. de Largie has verified the data disclosed in this release and
consent to the inclusion in this release of the matters based on the information in the form and context in which it appears.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 7 of 13
Forward Statement
This news release contains “forward-looking information” within the meaning of applicable securities laws. Generally, any
statements that are not historical facts may contain forward-looking information, and forward looking information can be identified
by the use of forward-looking terminology such as “plans”, “expects” or “does not expect”, “is expected”, “budget” “scheduled”,
“estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases
or indicates that certain actions, events or results “may”, “could”, “would”, “might” or “will be” taken, “occur” or “be achieved.”
Forward-looking information is based on certain factors and assumptions management believes to be reasonable at the time
such statements are made, including but not limited to, continued exploration activities, commodity prices, the estimation of initial
and sustaining capital requirements, the estimation of labour costs, the estimation of mineral reserves and resources,
assumptions with respect to currency fluctuations, the timing and amount of future exploration and development expenditures,
receipt of required regulatory approvals, the availability of necessary financing for the project, permitting and such other
assumptions and factors as set out herein.
Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual
results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied
by such forward-looking information, including but not limited to: risks related to changes in commodity prices; sources and cost
of power and water for the Project; the estimation of initial capital requirements; the lack of historical operations; the estimation
of labour costs; general global markets and economic conditions; risks associated with exploration of mineral deposits; the
estimation of initial targeted mineral resource tonnage and grade for the project; risks associated with uninsurable risks arising
during the course of exploration; risks associated with currency fluctuations; environmental risks; competition faced in securing
experienced personnel; access to adequate infrastructure to support exploration activities; risks associated with changes in the
mining regulatory regime governing the Company and the Project; completion of the environmental assessment process; risks
related to regulatory and permitting delays; risks related to potential conflicts of interest; the reliance on key personnel; financing,
capitalisation and liquidity risks including the risk that the financing necessary to fund continued exploration and development
activities at the project may not be available on satisfactory terms, or at all; the risk of potential dilution through the issuance of
additional common shares of the Company; the risk of litigation.
Although the Company has attempted to identify important factors that cause results not to be as anticipated, estimated or
intended, there can be no assurance that such forward-looking information will prove to be accurate, as actual results and future
events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance
on forward-looking information. Forward looking information is made as of the date of this announcement and the Company
does not undertake to update or revise any forward-looking information this is included herein, except in accordance with
applicable securities laws.
Visual Exploration Results
The Company discloses the following information in relation to visual exploration results in this announcement;
Figure 4
Very coarse grained, massive, pegmatitic with pale green-yellow elongate crystals, visually fieldidentified as a spodumene bearing orthoclase-quartz pegmatite sill outcrop. Precise mineralogy
percentages not recorded
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 8 of 13
Figures
Coarse grained, crystalline, pegmatitic, massive textured rock with elongate pale cream-grey
5&6
constituents, visually field-identified as a spodumene bearing orthoclase-quartz pegmatite dyke.
Precise mineralogy percentages not recorded
The assay results for the collected rock chip samples are expected in six weeks but may take up to 8 weeks and
there is no certainty that the identified pegmatite outcrop samples will result in Li grades/concentrations of any
economic importance
JORC Code, 2012 Edition – Table 1 report template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the Public
Report.
• In cases where ‘industry standard’ work has
been done this would be relatively simple
(eg ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine
nodules) may warrant disclosure of detailed
• Samples are of rock and are generally
of 4 or 6 fist sized pieces per sample.
• Rock sample are taken by hammer
and chisel of rock outcrop. Samples
were localized and care was taken to
achieve a representative sample of
each site. Samples were placed in a
numbered calico sample bag. Secured
in Polyweave sacks and delivered for
assay by ACM personnel.
• Samples were taken of individual rock
units are consisdered representative of
the rock unit at that location.
techniques
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 9 of 13
Criteria
Drilling
techniques
Drill sample
recovery
Logging
Sub-sampling
techniques
and sample
preparation
Quality of
assay data
and laboratory
tests
JORC Code explanation
Commentary
information.
• Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
• Method of recording and assessing core
and chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
• Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the
relevant intersections logged.
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to
the grain size of the material being
sampled.
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
• N/A
• N/A
• Surface rock chip samples have been
logged in the field at the time the
samples have been collected by an
appropriately experienced geologist.
• Surface rock samples have been
collected in manner to reflect the
general geology of the particular
outcrop being sampled and is
considered appropriate for the
reconnaissance stage of exploration.
• Samples have been collected over a
wide region and field duplicates at this
stage of reconnaissance are not
considered appropriate.
• Sample weights were between 1kg anf
2 kg generally and considered
appropriate foe the grain size
• No results have been reported
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 10 of 13
Criteria
JORC Code explanation
•
Verification of
•
sampling and
assaying
Location of
•
•
•
•
data points
•
•
Data spacing
•
and
•
distribution
•
Orientation of
•
data in relation
to geological
structure
•
Sample
•
security
Commentary
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures
adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (ie lack of
bias) and precision have been established.
The verification of significant intersections
by either independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
Whether sample compositing has been
applied.
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
The measures taken to ensure sample
security.
• N/A
• Surface samples located with handhels GPS which is adequate for this
stage of exploration.
• Location data was recorded using
UTM coordinates in the GDA94 zone
50 grid
• No mineral resource has been
estimated as current program is at an
early reconnaissance stage
• N/A
• Samples have remained in the custody
of authorized company personnel or
consultants. Samples were secured in
cable tied poly-weave sacks locked in
ACM vehicles or facilities and
remained in ACM custody from site to
delivery to assay laboratory
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 11 of 13
Criteria
JORC Code explanation
Commentary
Audits or
• The results of any audits or reviews of
sampling techniques and data.
• N/A
reviews
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
• The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a licence to
operate in the area.
• Acknowledgment and appraisal of
exploration by other parties.
• Exploration licences 45/4490 and
E45/5228 are held by a wholly
subsidiary of Australian Critical
Minerals Ltd.
• Deposit type, geological setting and style of
mineralisation.
• A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
o easting and northing of the drill hole
collar
o elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is
justified on the basis that the information is
not Material and this exclusion does not
detract from the understanding of the
report, the Competent Person should
clearly explain why this is the case.
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (eg cutting of
high grades) and cut-off grades are usually
Material and should be stated.
• No deposit has been identified
tenement and
land tenure
status
Exploration
done by other
• No previous work by other parties on
the subject matter of this
announcement
parties
Geology
Drill hole
Information
Data
aggregation
methods
• No drilling has been performed
• No results have been reported
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 12 of 13
Criteria
Relationship
between
mineralisation
widths and
intercept
lengths
Diagrams
Balanced
reporting
Other
substantive
exploration
data
Further work
JORC Code explanation
Commentary
• Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
• These relationships are particularly
important in the reporting of Exploration
Results.
• If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
• If it is not known and only the down hole
lengths are reported, there should be a
clear statement to this effect (eg ‘down hole
length, true width not known’).
• Appropriate maps and sections (with
scales) and tabulations of intercepts should
be included for any significant discovery
being reported These should include, but
not be limited to a plan view of drill hole
collar locations and appropriate sectional
views.
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
• Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
• The nature and scale of planned further
work (eg tests for lateral extensions or
depth extensions or large-scale step-out
drilling).
• Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
• N/A
• Appropriate diagrams have been
included in the report body.
• N/A
• Geological observations noted in
announcement
• Further reconnaissance mapping and
surface sampling is planned over the
tenement areas
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 13 of 13
Share your feedback
Discover