Flint Drill Contractor Appointed, Drilling Imminent
Released
Released
Announcement PDF
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
ASX ANNOUNCEMENT
6 March 2026
Drill Contractor Appointed – Drilling Imminent at
Flint Gold-Silver System
HIGHLIGHTS
• Experienced drilling contractor, SFP Drilling SAC, appointed to maiden diamond drill
program at the Flint High-Sulphidation Gold-Silver Project.
• SFP SAC has operated in Peru for 20 years and has extensive in-country experience.
• Drill mobilisation expected to commence mid-March.
• Phase 1 Program comprises 4 high priority HQ diamond drillholes for approximately
1,850m, targeting the Northern HSE Gold-Silver Target Cluster.
• Drill targets supported by NSAMT, IP geophysics, surface geochemistry and
alteration mapping.
• Drilling to test a 4km strike length high-sulphidation epithermal gold-silver system.
Executive Chairman Dean de Largie said:
“The appointment of SFP Drilling is a step forward for ACM as we transition from drill-
ready to drill-active at Flint. Our Phase 1 program will drill the northern cluster of gold-
silver targets identified by extensive geochemistry, alteration mapping and geophysics.
Work to date indicates that a compelling and coherent hydrothermal system is present
over a four-kilometre strike.
Importantly, the Flint Project sits within one of the world’s premier epithermal
metallogenic belts, which hosts more than 10 major deposits and resources exceeding
50 million ounces of gold.
Flint is endowed with an ideal geological setting and compelling alteration
characteristics that are consistent with high-sulphidation systems within this highly
prospective region.
We are commencing drilling at a time of extraordinary gold and silver prices, providing
an excellent backdrop as we test what our extensive data set suggests is a large-scale
and highly prospective High-Sulphidation Epithermal Gold-Silver system.”
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Australian Critical Minerals Ltd (ASX:ACM, “ACM” or “the Company”) is pleased to
announce that SFP Drilling SAC (“SFP”) has been appointed to undertake the Company’s
maiden diamond drilling program at its 100%-owned Flint High-Sulphidation Gold-Silver
Project in Northern Peru.
SFP is a respected Peruvian drilling company founded in 2007. They have an extensive track
record for safe, efficient, quality drilling in all conditions. They bring proven capability and
logistical support to deliver ACM’s maiden diamond drilling campaign at Flint.
Mobilisation of personnel and equipment is expected to commence during March, with
Phase 1 drilling to follow shortly thereafter.
Project Setting
The Flint Project is located approximately 80km east of Trujillo, Peru, within one of the world’s
most prolific epithermal metallogenic belts hosting more than 50Moz of gold resources and
production (Figure 1).
The Project comprises approximately 19.7 km² of tenure and hosts a large-scale advanced
argillic alteration system and associated surface geochemistry consistent with a high-
sulphidation epithermal gold-silver system.
Figure 1. Flint location and positioning amongst Tier 1 gold – silver producers
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Phase 1 Drill Program – Northern HSE Gold Target Cluster
The planned Phase 1 program comprises four HQ diamond drillholes for approximately 1,850
metres and is designed to test the Northern High-Sulphidation Epithermal (“HSE”) Gold
Target Cluster (Figure 2).
Figure 2. High-priority drill-targets based on comprehensive modelling of recent
NSAMT geophysics with multiple historical geological and geophysical datasets
Drill targeting is supported by:
• High-sulphidation pathfinder trace element geochemistry including arsenic,
antimony and tellurium.
• Coincident quartz-alunite and advanced argillic alteration mapping.
• NSAMT resistive anomalies interpreted to represent silicified cores
• IP chargeability anomalies consistent with sulphide development
Sub-surface modelling of NSAMT and IP geophysics has defined a coherent hydrothermal
system at Flint, extending over approximately four kilometres of strike.
The Northern cluster represents the highest priority drill targets where geophysical
anomalies strongly coincide with mapped alteration and highly anomalous surface
geochemistry.
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
The integration of multiple and independent datasets has assisted ACM to refine drillhole
positioning and de-risk the planned Phase 1 program.
Social Licence and Access
Access and land use agreements are in place for the drill program and landowners have
remained supportive of the Project throughout its exploration history.
All regulatory approvals required to commence Phase 1 drilling have been granted.
Next Steps
• Continue drill pad preparation
• Mobilise drilling contractor
• Commence Phase 1 drilling (late March 2026)
The Company will provide further updates as drilling progresses.
This release has been approved by the Board of Australian Critical Minerals Limited.
For further information, please contact:
Dean de Largie Paul Berson
Executive Chairman Investor and Media Relations
Australian Critical Minerals Limited Corporate Storytime
E info@auscriticalminerals.com.au E paul@corporatestorytime.com
T +61 (8) 6165 8858 T +61 421 647 445
About Australian Critical Minerals
Australian Critical Minerals (ASX: ACM) is an exploration company developing a diversified portfolio of
precious and base metal projects in Peru and Western Australia. The Company’s strategy is to advance
high-grade, district-scale projects through disciplined exploration, responsible operations, and community
engagement to create sustained shareholder value.
Competent Persons Statement
The information in this report related to Exploration Targets and Exploration Results is based on information
compiled by Mr. Dean de Largie. Mr. de Largie is the Executive Chairman of Australian Critical Minerals
Limited and is a Fellow of the Australian Institute of Geoscientists and has sufficient experience relevant
to the styles of mineralisation under consideration and to the activity being reported to qualify as a
Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves. Mr. de Largie has verified the data disclosed in this release
and consented to including the matters based on the information in the form and context in which it
appears.
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Appendix 1
JORC CODE 2012 EDITION, TABLE 1
Section 1. Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g., cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the
broad meaning of sampling.
Include reference to measures taken to ensure
sample representativity and the appropriate
calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that
are Material to the Public Report.
In cases where ‘industry standard’ work has been
done this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases, more
explanation may be required, such as where there is
coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types
(eg submarine nodules) may warrant disclosure of
detailed information.
2012 Induced Polarisation Survey
• A pole-pole induced polarisation survey was
completed by Arce Geofisicos on behalf of
Peru Minerals S.A.C between 4th
and 13th
September 2012.
• Data acquisition comprised pole-pole induced
polarisation on 10 WNW-ESE lines on 200 m
line spacing for a total of 9.20 line-km.
• Equipment used included an IRIS VIP4000
Transmitter (Tx), 6.5kW genset, and an IRIS
ElrecPro Receiver system (Rx). Receiving
electrodes were stainless steel plates and
transmitter electrodes were buried aluminium
plates. The survey configuration used for all
lines was standard pole-pole (PPIP) with 50m
receiver dipoles and up to 7 receiver channels
(N level). Location was by use of a Trimble
ProXRT receiver, Zephyr 2 antenna and
collector Ranger 500X.
2025 Audio-frequency Magnetotellurics Survey
• A Natural Source Audio-frequency
Magnetotelluric (NSAMT) survey employing
contiguous E-field in an EMAP-style
configuration, with sparse tensor sites was
completed by Southernrock Geophysics on
behalf of Australian Critical Minerals
between19th November 2025 and 6th of
December 2025.
• Data acquisition comprised contiguous 100m
E-field (EMAP-style) with sparse tensor Audio-
frequency Magnetotelluric (AMT) data along
fourteen west-east oriented lines, spaced 300m
apart for planned 29.4 line-km. The western
portion of the southernmost line was not
acquired due to very steep topographic relief,
and a 300 m segment of Line 10 was not
acquired due to land-access restrictions
resulting in a final survey coverage of 26.5 line-
km. Time series data acquired with sampling
rates (Fs) of 32kHz. Time series records of up
to 222
samples for each Fs. Timing provided by
internal GPS. Data acquired over 3 intervals of
2 minutes each (~6 minutes total per spread).
• Survey configuration used a dipole length of
100m, using contiguous along line Ex-field
(EMAP), with Sparse Tensor AMT sites every
300m (spreads of three Ex-fields per centrally
located Ey, Hx, Hy measurements).
• Equipment used included a gDAS 32-bit
receiver and processing software and Zonge
ANT-4 and 6 induction coils. Receiving
electrodes were stainless-steel plates in hand
dug pits wetted with fresh water.
Historic Surface Sampling
• No unreported sampling has been reported in
this press release. Historic geochemistry
results were previously reported June 12, 2025
in ’Australian Critical Minerals to acquire
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Criteria JORC Code explanation Commentary
significant gold and copper portfolio in mineral
rich Peru’ and August 13, 2025, in ‘Notice of
General Meeting/Proxy Form’.
Drilling techniques Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (eg core diameter, triple or standard tube,
depth of diamond tails, face- sampling bit or other
type, whether core is oriented and if so, by what
method, etc).
• No drilling has been reported.
Drill sample
recovery
Method of recording and assessing core and chip
sample recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
• No drilling has been reported.
Logging Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc) photography.
The total length and percentage of the relevant
intersections logged.
• No drilling has been reported.
• No resource estimate has been reported.
• Historic surface rock chip samples were
qualitatively logged.
Sub- sampling
techniques and
sample
preparation
If core, whether cut or sawn and whether quarter,
half or all core taken.
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
For all sample types, the nature, quality, and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain
size of the material being sampled.
• No sampling has been reported
Quality of Assay
data and laboratory
tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used
in determining the analysis including instrument
make and model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures adopted
(eg standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(ie lack of bias) and precision have
been established.
2012 Induced Polarisation Survey
• In 2025, ACM engaged Southernrock
Geophysics to complete new QAQC analysis of
the 2012 data.
• QAQC analysis was completed and resulted in
a significant amount of data being removed due
to poor received signal and EM coupling.
2025 Audio-frequency Magnetotellurics Survey
• Data QAQC and analysis was completed by
Southernrock Geophysics in 2025.
• Data processing was performed using
gDASPro. 1D and 2D inversion were completed
using Geotools (v.4.0.5) and 3D inversion using
CGG’s cloud based RLM3D service. The data
was modelled with 1D, 2D and 3D inversions to
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Criteria JORC Code explanation Commentary
image the resistivity distribution beneath the
surveyed sites, along survey lines and across
the survey area, to depths of around 1.5
kilometres. These depths are primarily
constrained by the lateral extent of the
surveyed area rather than the bandwidth itself.
• The Audio-frequency Magnetotelluric (AMT)
data acquired during this survey was of good
quality, with selected Zxy data from 265
stations and Zyx data from the 93 tensor sites
having median coherency coefficients of 0.96.
The percentage error estimates of Apparent
Resistivity and the Impedance Phase error
provide a generalized measure of data quality
for the Magnetotelluric survey. For the selected
Zxy and Zyx data, the median error in Apparent
Resistivity was 1.3%, and the median
Impedance Phase error was 0.14° (2.4mr).
Historic Surface Sampling
• Surface rock chip QAQC protocols were
previously reported in the June 12 and August
13, 2025, press releases.
Verification of
sampling and
assaying
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, and data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
• No sampling and no assays have been reported
Location of data
points
Accuracy and quality of surveys used to locate drill
holes (collar and down- hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
2012 Induced Polarisation Survey
• Data was acquired using a Trimble ProXRT
DGPS receiver, Zephyr 2 antenna and collector
Ranger 500X in PSAD56 (+42 South America),
UTM zone 17S.
• Topographic control was obtained from SRTM
30m DTM with a nominal accuracy of 16 m.
2025 Audio-frequency Magnetotellurics Survey
• Data was acquired using handheld GPS in the
wgs84 z 17S datum.
• Topographic control was obtained from SRTM
30m DTM with a nominal accuracy of 16 m.
Data spacing and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
Whether sample compositing has been applied.
• No Mineral Resource and Ore Reserve
estimation is reported in this news release.
2012 Induced Polarisation Survey
• Data was obtained on 10 WNW-ESE lines on
200 m line spacing for a total of 9.20 line-km.
2025 Audio-frequency Magnetotellurics Survey
• Data was obtained on 14 E-W oriented lines,
spaced 300m apart for planned 29.4 line-km.
The western portion of the southernmost line
was not acquired due to very steep
topographic relief, and a 300 m segment of
Line 10 was not acquired due to land-access
restrictions resulting in a final survey coverage
of 26.5 line-km.
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Criteria JORC Code explanation Commentary
Orientation of data
in relation to
geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the deposit
type.
If the relationship between the drilling orientation and
the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be assessed
and reported if material.
• Geophysics survey lines are approximately
perpendicular to the strike of the hydrothermal
system.
Sample security The measures taken to ensure sample security. • No new or unreported sampling has been
reported
Audits or reviews The results of any audits or reviews of sampling
techniques and data.
• No new or unreported sampling or assay data
is in this news release. The geophysics
program is in progress and will be modelled
and reviewed upon completion.
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Section 2. Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral tenement and land
tenure status
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
• Flint has 3 licences. Gaya 103 is
held by Pegoco SAC which is a
100% owned subsidiary of ACM. El
Perseverante and Cerro Pedernal
are held through a 100% option to
purchase by Latin Gold SAC.
• Tenure is in good standing.
• There are no native title interests
Exploration done by other
parties
Acknowledgment and appraisal of exploration by
other parties.
• Southern Rock Geophysics modelled
the NSAMT data and remodelled the
historical IP data.
Geology Deposit type, geological setting, and style of
mineralisation.
• Flint is regarded as high-sulphidation
epithermal system. The volcanic
host rock has not been formally
dated, however it is interpreted to be
of approximately Miocene age.
Drill hole Information A summary of all information material to the
understanding of the exploration results including
a tabulation of the following information for all
Material drill holes: easting and northing of the
drill hole collar elevation or RL, dip and azimuth
of the hole, down hole length and interception
depth, hole length. If the exclusion of this
information is justified on the basis that the
information is not Material and this exclusion
does not detract from the understanding of the
report, the Competent Person should clearly
explain why this is the case.
• No drilling reported
Data aggregation methods In reporting Exploration Results, weighting
averaging techniques, maximum
and/or minimum grade truncations (eg cutting of
high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate short
lengths of high-grade results and longer lengths
of low-grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown
in detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
• No unreported sampling or assays
are included in this release.
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Criteria JORC Code explanation Commentary
Relationship between
mineralisation, widths and
intercept lengths
These relationships are particularly important in
the reporting of Exploration Results.
If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
If it is not known and only the down hole lengths
are reported, there should be a clear statement to
this effect (e.g., down hole length, true width not
known’).
Appropriate maps and sections
• No drilling has been reported.
Diagrams Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for
any significant discovery being reported These
should include but not be limited to a plan view of
drill hole collar locations and appropriate
sectional views.
• No sampling has been reported.
Balanced Reporting Where comprehensive reporting of all Exploration
Results is not practicable, representative
reporting of both low and high grades and/or
widths should be practiced to avoid misleading
reporting of Exploration Results.
• No previously unreported assays
have been reported
Other substantive
exploration data
Other exploration data, if meaningful and
material, should be reported, including (but not
limited to): geological observations; geophysical
survey results; geochemical survey results; bulk
samples – size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
• Geological observations and surface
rock chip results were previously
reported in the June 12 and August
13 2025 press releases.
Further work The nature and scale of planned further work
(e.g. tests for lateral extensions or depth
extensions, or large-scale step-out drilling).
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
• Next steps include a diamond drilling
program of 4 drill holes for
approximately 1,850m.
• Historically, the southern half of the
project has had less surface geology
and alteration mapping compared to
the northern sector. This is expected
to be addressed concurrently with
the planned drilling campaign.
• Significant NSAMT anomalies exist
in the southern sector and so, IP is
planned in this region to further
define sub-surface conductors.
ASX:ACM
auscriticalminerals.com.au
168 Stirling Highway, Nedlands, Western Australia, 6009
T: +61 (8) 6165 8858. E: info@auscriticalminerals.com.au
ACN 658 906 159
Appendix 2
Figure 1 References
• Tantahuatay:
https://www.sec.gov/Archives/edgar/data/1013131/000141057824000577/tmb-
20231231xex96d9.pdf
• Cerro Corona:
https://www.goldfields.com/pdf/investors/quarterly-reports/2012/quarter-ended-30-june-
2012/presentation.pdf
• La Zanja:
https://s24.q4cdn.com/382246808/files/doc_downloads/reserves/Reserves-Resources-for-
Posting_Final.pdf
• Minas Conga:
https://s24.q4cdn.com/382246808/files/doc_financials/annual/2009_Annual_Report.pdf
• Michiquillay:
https://minedocs.com/22/Southern-Copper-Form-10K-2021.pdf
• Yanacocha:
Longo A A, Dilles J H, Grunder A L and Duncan R, 2010 - Evolution of Calc-Alkaline Volcanism
and Associated Hydrothermal Gold Deposits at Yanacocha, Peru : in Econ. Geol. v.105 pp.
1191-1241
• Colpyoc:
https://announcements.asx.com.au/asxpdf/20140131/pdf/42mgk1877xcygh.pdf
• Igor:
https://framerusercontent.com/assets/m13wgL4uyKlpumTZVDR8aoPyL2U.pdf
• Shahuindo:
https://www.sec.gov/Archives/edgar/data/1510400/000106299316007314/exhibit99-1.htm
• La Arena:
https://www.zijinmining.com/news/news-detail-121535.htm
• Alto Chicama:
https://s25.q4cdn.com/322814910/files/doc_financial/annual_reports/2010/Barrick-Annual-
Report-2010.pdf
• La Virgen:
https://propertyfile.gov.bc.ca/reports/PF676882.pdf
Share your feedback
Discover