Lithium Prospectivity Confirmed at Cooletha Project
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
23 November 2023
Lithium Prospectivity Confirmed at Cooletha Project
Highlights
•
First-pass rock chip assay results confirm the lithium prospectivity of the Cooletha Project
•
10 high priority targets totalling over 24km in length have been identified
•
Lithium and lithium-caesium-tantalum (“LCT”) pegmatite indicator minerals confirmed
•
Multi-element assays have identified vectors toward evolved intrusive rocks
•
Multispectral analysis integrated with assay results and geological observations defines multiple
exploration locations in the Pilbara LCT pegmatite ‘Goldilocks Zone’
•
The scale of the total prospective area has exceeded expectations
•
Planning of follow up program underway with focus on testing the target areas identified from the
current work program which only covered 25% of the granted tenure.
Australian Critical Minerals (ASX: ACM, “Australian Critical Minerals” or “the Company”) a mineral exploration
company focused on the exploration and development of critical mineral projects in Western Australia, advises its
initial mapping and sampling program confirms lithium prospectivity at the Cooletha Lithium Project. Trace elements
and spectral analysis confirms the LCT pegmatite system and has generated 10 priority targets in the untested
goldilocks zone.
Managing Director, Dean de Largie said:
“Positive results from our initial exploration program across the large Cooletha Lithium Project, have been
integrated with world-class spectral analysis to detail a clear pathway to exploration success. ACM has
benefited from the assistance of our technical consultants who have brought together a team of multidisciplinary geoscientists to rapidly deliver a science-backed understanding of the geology of the Cooletha
Lithium Project.
Our initial 251 samples of intrusive and pegmatitic rocks have delivered the geochemical information required
to develop our understanding of the intrusive fractionation processes that have occurred at Cooletha.
Identifying the location and vectors in fractionated rocks is the first important step to the discovery of evolved
pegmatitic LCT systems.
We look forward to building on this data with a scientifically robust exploration plan which includes the
sampling of the identified targets within the modelled LCT pegmatite goldilocks zone.
The majority of the initial program was focused in the western part of the Cooletha tenure due to access
issues, with future exploration anticipated to include support to provide a faster test and evaluation procedure
of the specific targets identified, especially on the central and eastern side of the project area.”
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 1 of 26
Cooletha Lithium Project, Pilbara
The Cooletha Lithium Project, ACM’s flagship lithium project, has over 100km2 of lithium prospectivity in the Pilbara
lithium district. The Project is located south of significant discoveries at Pilbara Minerals’ (ASX:PLS) Pilgangoora
Lithium Project (223Mt @ 1.25% Li2O), MinRes’ (ASX:MIN) Wodgina Lithium Project (259Mt @ 1.17% Li2O) (Figure1).
Figure 1 – The location of the Cooletha Lithium Project in the Pilbara region, Western Australia.
Encouraging assay results for lithium and LCT pegmatite indicator elements have been received from the Company’s
first-pass rock chip sampling of a portion of the Cooletha Lithium Project. Rock chip geochemical analysis has been
conducted contemporaneously with hyperspectral data sourcing and analysis to derive a robust interpretation and
geological model at Cooletha. The hyperspectral data analysis was performed over the 251 km2 of granted tenure
and the 160 km2 of pending tenure at Cooletha in anticipation of the future grant.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 2 of 26
Preliminary geochemical analysis and interpretation of rock chip samples from Cooletha involved developing a LCT
pegmatite correlation matrix specific to the geology of Cooletha. The elemental ratios Mg/Li; Na/Ta; K/Rb and K/Cs
were used to identify LCT pegmatites or the fertile intrusive rocks from which vectors to lithium mineralisation have
been calculated.
Figure 2 – Lithium rock chip results, prioritised spectral targets and Cooletha geological setting
The central and eastern side of the Cooletha Project covers the southern extension of the Soansville Group which
hosts both Pilbara Minerals Pilgangoora and Mineral Resources Wodgina Lithium Projects. Figure 2 displays the
location of the rock samples collected during the current programme with respect to interpreted “goldilocks zone”.
Significantly no sampling has occurred within this zone (Figure 3, Table 1). The extension of the Pilbara scale
goldilocks zone (Figure 3) has been interpreted from analysis of various elemental ratios and provides the targeting
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 3 of 26
required to explore this large tenure efficiently. The samples derived from the geological units proximal to the goldilocks
zone are lithium bearing and provide confirmation of the fertility of these locations. The scope of the current program
was to gain an understanding of the broader geology and prospectivity upon which further exploration can be based.
The hyperspectral imagery interpretation has identified approximately 25 linear kilometres of target areas which
warrant investigation.
Figure 3 – Lithium rock chip LCT pegmatite indicator element ratios
The combination of geochemical and spectral analysis of the intrusive rocks at Cooletha has provided a powerful tool
for ACM to refine our exploration targeting. The exploration target at Cooletha remains very large and the contact
zone of the Soansville Group presents the opportunity of many kilometres of targeted exploration within the interpreted
goldilocks zone.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 4 of 26
SAMPLE_ID
EAST
NORTH
Be
Fe
K
Li2O
Nb
Rb
Sr
Ta
ppm
%
%
ppm
ppm
ppm
ppm
ppm
LITHOLOGY
CR101
701947
7570912
Pegmatite
0.9
0.7
4.4
104.6
2.1
131.0
45.2
0.2
CR201
703946
7562062
Pegmatite
0.2
0.4
4.6
101.8
0.0
112.0
245.0
0.0
CR241
707727
7562090
Pegmatite
0.2
0.3
7.1
98.4
0.0
190.0
221.0
0.1
CR215
720915
7557023
Breccia
1.3
11.7
0.4
273.4
3.5
16.0
50.4
0.3
CR188
704779
7564257
Amphibolitie
1.0
8.6
0.0
140.6
0.9
0.8
29.4
0.1
CR141
704236
7568635
Monzogranite
1.6
1.7
1.6
116.0
4.4
41.1
177.0
0.4
CR217
721469
7556423
Channel Iron Deposit
1.5
55.4
0.0
5.0
5.4
0.0
0.3
0.3
CR213
722631
7557674
Banded iron Formation
1.7
40.8
0.0
3.9
0.7
0.6
3.3
0.1
Table 1 – Lithium and Indicator Elements Results
Future Works
The Company is preparing to continue the Cooletha sampling program with a focus on the target areas represented
in Figure 3. Whilst the Company remains focused on realizing the lithium potential at Cooletha, current work has
highlighted the potential of the iron ore and manganese within the Cooletha tenure and when efficient to do so the
Company will sample these units to continue to value-add to the information database. (Table 1, Figure 4).
ACM anticipates releasing results for the recently completed auger and RC program at the Rankin Dome Rare
Earths Project shortly, with follow up exploration to commence during the first quarter of 2024. The Rankin Dome
Rare Earths Project has previously produced shallow auger samples highly anomalous in REE.
A POW has been submitted to drill the Iron Ore targets at the Shaw Project, expected to commence in Q2CY24.
Shaw sits next to an operating mine owned by Hancock Prospecting with over 5km strike of prospective Banded
Iron Formation.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 5 of 26
Figure 4 – Manganiferous shale sample eastern Cooletha with 24% iron
.
Figure 4 – Overview map of Iron oxide spectral anomalies, historic and Fe, Mn results
For further information, please contact:
Dean de Largie
Managing Director
Ben Creagh
Investor and Media Relations
Australian Critical Minerals Limited
E info@auscriticalminerals.com.au
T +61 (8) 6165 8858
NWR Communications
E benc@nwrcommunications.com.au
T +61 417 464 233
About Australian Critical Minerals
Australian Critical Minerals is an exploration company focused on developing a quality portfolio of critical
minerals projects in Western Australia. The key projects are Cooletha (Pilbara) Lithium Project and Rankin Dome
(Southern Cross) Rare Earth Project.
Battery metals, including rare earths and lithium are fundamental in the clean energy transition to net zero
transmissions. ACM intends to play a pivotal role in delivering the processed minerals needed for a clean energy
future.
ACM has established a highly experienced management team with a proven track record of exploration and
corporate success in the mining industry.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 6 of 26
Reference to Previous Announcements
Investors can refer to the Company’s Prospectus for further disclosure on information in this Announcement and all of the
Company’s Projects. Investors should also refer to the Company’s release 28 August 2023 “Cooletha Exploration Update” for
more information on the pegmatite outcrops (and relevant samples).
Competent Persons Statement
The information in this report that relates to Exploration Targets and Exploration Results is based on information compiled by
Mr. Dean de Largie. Mr. de Largie is the Managing Director of Australian Critical Minerals Limited and is a Fellow of the Australian
Institute of Geoscientists and has sufficient experience relevant to the styles of mineralisation under consideration and to the
activity being reported to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves. Mr. de Largie have verified the data disclosed in this release and
consent to the inclusion in this release of the matters based on the information in the form and context in which it appears.
Forward Statement
This news release contains “forward-looking information” within the meaning of applicable securities laws. Generally, any
statements that are not historical facts may contain forward-looking information, and forward looking information can be identified
by the use of forward-looking terminology such as “plans”, “expects” or “does not expect”, “is expected”, “budget” “scheduled”,
“estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases
or indicates that certain actions, events or results “may”, “could”, “would”, “might” or “will be” taken, “occur” or “be achieved.”
Forward-looking information is based on certain factors and assumptions management believes to be reasonable at the time
such statements are made, including but not limited to, continued exploration activities, commodity prices, the estimation of initial
and sustaining capital requirements, the estimation of labour costs, the estimation of mineral reserves and resources,
assumptions with respect to currency fluctuations, the timing and amount of future exploration and development expenditures,
receipt of required regulatory approvals, the availability of necessary financing for the project, permitting and such other
assumptions and factors as set out herein.
Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual
results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied
by such forward-looking information, including but not limited to: risks related to changes in commodity prices; sources and cost
of power and water for the Project; the estimation of initial capital requirements; the lack of historical operations; the estimation
of labour costs; general global markets and economic conditions; risks associated with exploration of mineral deposits; the
estimation of initial targeted mineral resource tonnage and grade for the project; risks associated with uninsurable risks arising
during the course of exploration; risks associated with currency fluctuations; environmental risks; competition faced in securing
experienced personnel; access to adequate infrastructure to support exploration activities; risks associated with changes in the
mining regulatory regime governing the Company and the Project; completion of the environmental assessment process; risks
related to regulatory and permitting delays; risks related to potential conflicts of interest; the reliance on key personnel; financing,
capitalisation and liquidity risks including the risk that the financing necessary to fund continued exploration and development
activities at the project may not be available on satisfactory terms, or at all; the risk of potential dilution through the issuance of
additional common shares of the Company; the risk of litigation.
Although the Company has attempted to identify important factors that cause results not to be as anticipated, estimated or
intended, there can be no assurance that such forward-looking information will prove to be accurate, as actual results and future
events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 7 of 26
on forward-looking information. Forward looking information is made as of the date of this announcement and the Company
does not undertake to update or revise any forward-looking information this is included herein, except in accordance with
applicable securities laws.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 8 of 26
JORC Code, 2012 Edition – Table 1 report
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
•
•
techniques
•
•
•
Drilling
•
techniques
Drill sample
•
recovery
•
•
Logging
•
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the
broad meaning of sampling.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work
has been done this would be relatively
simple (eg ‘reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other
cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine
nodules) may warrant disclosure of
detailed information.
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether core
is oriented and if so, by what method,
etc).
Method of recording and assessing
core and chip sample recoveries and
results assessed.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain of
fine/coarse material.
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
Rock sample are taken by hammer and
chisel of rock outcrop. Samples were
localized and care was taken to achieve
a representative sample of each site.
Samples were placed in a numbered
calico sample bag. Secured in
Polyweave sacks and delivered for
assay by ACM personnel.
No drilling has been reported
No drilling has been reported.
Rock chip samples were logged in the
field at the time the samples have been
collected by an appropriately
experienced geologist. Logging is
qualitative.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 9 of 26
Criteria
JORC Code explanation
•
•
Sub-
•
sampling
•
techniques
and sample
•
preparation
•
•
•
Quality of
•
assay data
and
laboratory
•
tests
•
Verification
•
of sampling
assaying
•
•
Location of
•
•
and
data points
•
•
metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
If core, whether cut or sawn and
whether quarter, half or all core taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for
instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate
to the grain size of the material being
sampled.
The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (ie lack of bias) and precision
have been established.
The verification of significant
intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
Commentary
The sampling technique of chisel and
hammer is appropriate for rock chip
sampling.
The sample size of approximately 2kg
is appropriate for the material grain
size.
•
The Af01 method is an alkaline fusion
and MMA04 techniques are considered
total digests. MMA04 is a µ-wave
digest, HF/multiacid: 61 elements assay
method by ICP-MS/OES. Both
methods are considered near-total
digests.
•
Blanks and certified reference samples
are inserted into the sample string at
the rate of approximately 1 in 20.
•
Sample locations identified with a
handheld Garmin GPS with an
accuracy of approximately 3m.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 10 of 26
Criteria
JORC Code explanation
Commentary
Data
•
•
spacing
•
Data spacing for reporting of
Exploration Results.
Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications
applied.
Whether sample compositing has been
applied.
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this
is known, considering the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
The measures taken to ensure sample
security.
No mineral resource has been
estimated as current program is at an
early exploration stage
•
Where identifiable structures were
apparent, samples were taken across
said structure.
•
Samples were secured in cable tied
poly-weave sacks locked in ACM
vehicles or facilities and remained in
ACM custody from site to delivery to
assay laboratory
The results of any audits or reviews of
sampling techniques and data.
•
No audits or reviews have taken place.
and
distribution
•
Orientation
•
of data in
relation to
geological
•
structure
Sample
•
security
Audits or
reviews
•
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
•
Type, reference name/number,
location and ownership including
agreements or material issues with
third parties such as joint ventures,
partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
The security of the tenure held at the
time of reporting along with any
known impediments to obtaining a
licence to operate in the area.
Acknowledgment and appraisal of
exploration by other parties.
•
•
Historic work reported at Cooletha was
performed by Proterozoic Gold and
reported to DMIRS and within the ACM
IPO prospectus
Deposit type, geological setting and
style of mineralisation.
•
Cooletha Project is prospective for
pegmatite hosted LCT mineralisation,
Channel Iron Deposits above the
tenement and
land tenure
status
•
Exploration
•
done by other
•
parties
Geology
•
Cooletha tenements are owned by an
ACM subsidiary Proterozoic Gold Pty
Ltd.
No impediments to granted tenure
exist.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 11 of 26
Criteria
JORC Code explanation
Commentary
Fortescue Group and Conglomerate
hosted gold and manganese shales at
the base of the Fortescue Group.
Drill hole
•
Information
•
Data
•
aggregation
methods
•
•
Relationship
•
between
mineralisation
•
widths and
intercept
•
lengths
Diagrams
•
A summary of all information material
to the understanding of the
exploration results including a
tabulation of the following information
for all Material drill holes:
o easting and northing of the drill
hole collar
o elevation or RL (Reduced Level –
elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception
depth
o hole length.
If the exclusion of this information is
justified on the basis that the
information is not Material and this
exclusion does not detract from the
understanding of the report, the
Competent Person should clearly
explain why this is the case.
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (eg cutting of high
grades) and cut-off grades are
usually Material and should be
stated.
Where aggregate intercepts
incorporate short lengths of high
grade results and longer lengths of
low grade results, the procedure
used for such aggregation should be
stated and some typical examples of
such aggregations should be shown
in detail.
The assumptions used for any
reporting of metal equivalent values
should be clearly stated.
These relationships are particularly
important in the reporting of
Exploration Results.
If the geometry of the mineralisation
with respect to the drill hole angle is
known, its nature should be reported.
If it is not known and only the down
hole lengths are reported, there
should be a clear statement to this
effect (eg ‘down hole length, true
width not known’).
Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These
should include, but not be limited to a
plan view of drill hole collar locations
and appropriate sectional views.
•
No Drilling reported.
•
No drilling and no drill results reported
•
No drilling reported.
•
Appropriate diagrams have been
included in the report reflecting the
work being performed.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 12 of 26
Criteria
JORC Code explanation
Commentary
Balanced
•
•
No geochemistry has been reported
•
All material information has been
reported in the press release.
Tabulated information of significant
assay results has been included in the
press release.
•
Further sampling is planned at
Cooletha. Final versions of the plan will
be determined after further review of
assays and announced in due course.
reporting
Other
•
substantive
exploration
data
Further work
•
•
Where comprehensive reporting of
all Exploration Results is not
practicable, representative reporting
of both low and high grades and/or
widths should be practiced to avoid
misleading reporting of Exploration
Results.
Other exploration data, if meaningful
and material, should be reported
including (but not limited to):
geological observations; geophysical
survey results; geochemical survey
results; bulk samples – size and
method of treatment; metallurgical
test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious
or contaminating substances.
The nature and scale of planned
further work (eg tests for lateral
extensions or depth extensions or
large-scale step-out drilling).
Diagrams clearly highlighting the
areas of possible extensions,
including the main geological
interpretations and future drilling
areas, provided this information is
not commercially sensitive.
Australian Critical Minerals Limited ACN 658 906 159
168 Stirling Highway, Nedlands WA 6009
www.auscriticalminerals.com.au | Page 13 of 26
Appendix A
Rock Sample Assays
SAMPLE
ID
EAST
gda94z50
NORTH
gda94z50
Be
ppm
Fe ppm
K ppm
La
ppm
Li2O
ppm
Nb
ppm
Rb
ppm
Sr
ppm
Ta
ppm
CR001
CR002
CR003
CR004
CR005
CR006
CR007
CR008
CR009
CR010
CR011
CR012
CR013
CR014
CR015
CR016
CR017
CR018
CR019
CR020
CR021
CR022
CR023
CR024
CR025
CR026
CR027
CR028
CR029
CR030
CR031
CR032
CR033
CR034
CR035
CR036
CR037
CR038
CR039
CR040
CR041
CR042
CR043
CR044
CR045
CR046
CR047
707301
707212
707020
706954
706808
706773
708726
708724
708726
708732
708798
709258
709096
709332
709116
708873
709480
709586
709578
709590
709765
709240
709555
709564
709551
709540
709748
709737
709761
709784
709939
710237
710131
710367
710135
710203
710202
710217
710224
710243
710313
710324
710341
710366
710382
710418
710520
7564732
7564785
7565064
7565277
7565324
7565346
7564588
7564596
7564604
7564618
7564618
7564740
7564525
7563948
7564129
7565628
7565735
7565775
7565784
7565773
7565707
7566809
7566989
7566965
7566953
7566950
7566941
7566939
7566595
7566551
7566606
7566600
7566393
7566323
7566828
7567006
7566996
7567000
7567004
7566977
7566954
7566948
7566936
7566924
7566926
7566921
7566887
1.0
-1.0
1.0
-1.0
-1.0
-1.0
-1.0
2.0
2.0
1.0
-1.0
-1.0
1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
1.0
-1.0
-1.0
-1.0
2.0
-1.0
2.0
1.0
2.0
2.0
-1.0
-1.0
2.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
6300
4900
8600
4100
8100
6900
6000
5600
6300
8800
8600
4500
5200
4200
3500
2300
3800
5200
6200
4800
6200
6300
4800
4200
4200
3000
6300
5200
6500
6400
6700
3900
3600
5300
5500
5700
3500
2800
3100
2900
2700
1800
3000
1700
4300
3600
4200
59000
72000
56600
50300
56400
54700
39500
30300
31800
33300
33100
50800
28900
54600
52700
50900
67000
54100
51100
72600
74700
28800
65200
60300
67400
70400
70900
72100
35900
60300
56100
73300
77700
71400
47100
53500
69500
61800
55100
46100
81500
72500
73400
80000
75500
75800
70100
16.9
7.7
14.7
6.9
10.3
11.9
5.7
7.9
12.6
18.7
16.2
5.6
12.6
4.5
1.5
5.0
8.3
4.5
11.0
8.5
17.0
13.3
10.6
11.3
7.7
2.6
3.2
5.2
11.7
13.3
9.2
6.0
6.8
5.8
7.7
5.5
3.5
3.2
5.0
4.2
4.2
3.7
4.6
5.1
9.0
7.2
5.5
42.8
34.9
45.2
18.1
33.8
26.0
18.1
22.4
30.1
35.7
26.7
10.8
16.4
-1.1
-1.1
2.4
15.1
9.9
14.0
21.1
18.9
18.9
11.2
15.1
8.2
8.4
11.2
7.1
22.0
28.2
10.3
4.1
7.7
13.1
9.9
10.1
15.7
11.4
3.2
12.1
9.7
6.5
-1.1
-1.1
7.5
9.3
6.7
2.5
1.6
3.2
1.3
1.8
1.5
1.4
4.5
5.3
3.1
2.6
1.0
1.4
0.6
0.7
1.4
1.1
0.5
1.6
1.9
2.6
1.7
1.7
1.6
0.7
-0.5
1.3
1.2
2.3
2.6
1.9
0.6
0.8
0.8
0.9
1.1
1.0
0.6
-0.5
1.8
0.9
-0.5
-0.5
-0.5
1.7
1.2
1.2
180.0
191.0
162.0
135.0
126.0
118.0
135.0
121.0
118.0
107.0
95.0
144.0
85.0
148.0
134.0
149.0
160.0
121.0
104.0
198.0
232.0
106.0
182.0
163.0
169.0
170.0
172.0
199.0
109.0
155.0
143.0
171.0
187.0
194.0
119.0
141.0
190.0
160.0
155.0
138.0
214.0
200.0
173.0
193.0
194.0
214.0
196.0
198.0
245.0
240.0
137.0
254.0
233.0
116.0
107.0
106.0
125.0
130.0
186.0
173.0
164.0
154.0
77.0
175.0
146.0
199.0
245.0
181.0
211.0
153.0
193.0
211.0
206.0
276.0
215.0
280.0
230.0
178.0
188.0
163.0
167.0
220.0
215.0
177.0
207.0
149.0
84.0
136.0
189.0
171.0
183.0
182.0
195.0
162.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-
Share your feedback
Discover